Forwards Reactor Containment Bldg Integrated Leakage Rate Test Rept
ML18010A974
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/12/1993
From: Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18010A975 List:
References
CON-NRC-799 MS-930006, NUDOCS 9301210333
Download: ML18010A974 (4)


Text

A.CCELEtu.~ED DOCUMENT DIS BUTION SYSTEM REGUL Y INFORMATION DISTRIBUTI SYSTEM (RIDE)

Pl r ACCESSION NBR:9301210333 DOC.DATE: 93/01/12 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit

, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION VAUGHN,G.E.

Carol~a Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "Reactor Containment Bldg Integrated Leakage Rate Test Rept."

DISTRIBUTION CODE'017D COPIES RECEIVED LTR J ENCL 2 SIZE'~ +Pig TITLE: OR Submittal:

Append J Containment Leak Rate Testing D

NOTES:Application for permit renewal filed.

S 05000400 RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS G FILE 01 RE%/DS SAIB EXTERNAL: NRC PDR COPIES LTTR ENCL 1

0 2

2 6

6 1

0 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD NRR/DST/SPLB 8D OGC/HDS1 RES/DE/SEB NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIKING FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 18 ENCL 16

'l r

4 I

4 ~

CpaL Carolina Power & Light Company P.O. Box 165 ~ New Hill, NC 27562 G.E. VAUGHN Vice President Hanis Nudear Plant J4N 2 l9n Letter Number:

MS-930006 10 CFR 50 App. J United States Nuclear Regulatory Commission ATTN:

NRC Document Control Desk Washington, D.

C.

20555 CAROLINA POWER AND LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO.

50-400 LICENSE NO.

NPF-63 NRC-799 REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST Gentlemen,:

In accordance with 10 CFR 50, Appendix J, Section V.

Integrated Leak Rate Testing (ILRT) conducted for the Power Plant Unit 1 Reactor Containment Building during submitted.

A summary analysis of Types B and C testing the preoperational ILRT is included in the report:.

B.,

the report of the Shearon Harris Nuclear October 1992,, is hereby performed subsequent to The leakage rates obtained during the ILRT were within the acceptance criteria specified by Technical Specifications.

Based on this, CP6rL will schedule the next ILRT at the normal 40 + 10 month interval.

If further information is

required, please contact Mr.

Mickey Hamby at (919) 362-2204.

Vice President Harris Nuclear Plant MGW:dmw Enclosure cc:

Mr. N. B. Le jLGOO Mr. S.

D. Ebneter Mr. J.

E. Tedrow MEM/HO-930006/1/OS1 9301210333 930112 PDR ADOCK 05000400 P

PDR tel