Summary of 921113 Meeting W/Util in Rockville,Md Re Future Submittals Planned by Cp&L,Status of NRC Review of Previous Submittals,Responses to Generic Communications,Nrc Concerns & Other Coordination of Licensing Activities
ML18010A947
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/04/1992
From: Le N
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9212100048
Download: ML18010A947 (17)


Text

i

~

~8 AEGIS+~o Cy O

IVl Pi 0

Cy Cy

/p >>>>*<<~

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 December 4, 1992

~ Film Docket No. 50-400 LICENSEE:

Carolina Power 8 Light Company FACILITY:

Shearon Harris Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF MEETING HELD ON NOVEMBER 13,

1992, WITH CAROLINA POWER 8L LIGHT COMPANY A meeting was held with Carolina Power

& Light Company (CP8L),

on November 13,

1992, in Rockville, Maryland.

The purpose of the meeting was to discuss future submittals planned by CP&L, the status of the NRC's review of previous submittals, responses to generic communications, NRC concerns, and other general coordination of licensing activities.

Participants in the meeting were as follow:

NRC CP&L N.

Le R. Prunty C. Olexik, Jr.

L. Rowell The enclosure contains the hand-out material (18-month Regulatory Schedule) which describes current and planned activities that were discussed at the meeting.

With regard to amendment

request, item 22A (TSC 87-12) of Enclosure 1,

submitted by the licensee on December 28, 1990, the staff advised the licensee that their September 29,

1992, response to the staff letter dated July 9,
1992, was inadequate in that they did not provide the staff with a plant specific'reason for not having a Technical Specification (TS) requirement for the Atmospheric Dump Valves (ADVs) currently installed at the Shearon Harris Plant (SHNPP).

Because of this omission of a TS requirement for the SHNPP ADVs in the current SHNPP's TS, the staff requested in its July 9,

1992, letter, that the licensee provide the staff their justification for this
omission, including all support analyses for accident mitigation and for the safe shutdown of the plant as currently configured.

In response to the above staff's observation, the licensee indicated that they may want to withdraw the request if the staff does not approve the item as it 080004 92i2i00048 92i204I PDR ADOCK 05000400 P

PDR

f)806U J

December 4, 1992 was submitted.

The staff indicated that this matter will be brought to management attention, and the licensee will be advised of the staff's further determination.

ORIGINAL SIGNED BY:

Ngoc B. Le, Project Hanager Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Regulations

Enclosure:

SHNPP 18-Honth Regulatory Schedule cc w/enclosure:

See next page DISTRIBUTION:

~-Docket File--

NRC/Local PDRs PD II-1 Reading File T,. Hurley F. Hiraglia J.

Partlow S.

Varga G. Lainas E.

Adensam N.

Le S. Little C.

Hoon C. Grimes C. Schulten OGC E. Jordan ACRS (10)

L. Plisco, EDO E. Herschoff, R-II, cc:

Licensee

& Service List OFC SAttle NBLe:dt LA:P 1:DRPE PH:PD21:DR D:P 1:DRPE EAd n

am DATE 12/

/92 12/ 0'/92 12/

/92 Document Name:

HAR1113.HTS

~

I

(

Mr. R. A. Watson Carolina Power

& Light Company Shearon Harris Nuclear Power Plant, Unit 1

CC:

Mr. H.

Ray Starling Manager - Legal Department Carolina Power

& Light Company P. 0.

Box 1551

Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U. S. Nuclear Regulatory Commission Route 1,

Box 315B New Hill, North Carolina 27562 Mr. Gerald E.

Vaughn, Vice President Harris Nuclear Project Harris Nuclear Plant P. 0.

Box 165 New Hill, North Carolina 27562 Mr, H. A. Cole Special Deputy Attorney General State of North Carolina P. 0.

Box 629

Raleigh, North Carolina 27602 Public Service Commission State of South Carolina P.O.

Drawer 11649

Columbia, South Carolina 29211 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgia 30323 Mr. C.

S. Hinnant Plant General Manager Harris Nuclear Plant P. 0.

Box 165 New Hill, North Carolina 27562 Mr. Dayne H. Brown, Director Division of Radiation Protection N.

C. Department of Environmental, Commerce

& Natural Resources P. 0.

Box 27687

Raleigh, North Carolina 27611-7687 Mr. R.

B. Starkey Vice President Nuclear Services Department Carolina Power

& Light Company P. 0.

Box 1551

Raleigh, North Carolina 27602

~

~

i

SHNPP 18-MONTH REGULATORY SCHEDULE ATTACHMENT 2 OCTOBER 1992 PAGE 1

CAT PRI ISSUE 1992 1993 1994 SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB lA/3 CONTAINMENT ISOLATION VALVES TSC (TSC 90-01)

ISSUE TSC

~ssaasaassaa ll/30 1B/4 INSTRUMENTATION CHANGE (TSC 88-10)

ISSUE TSC

~sssrsasasas ll/30 1C/4 SAFETY INJECTION PUMP FLOW REQ (TSC 92-04)

CP&L SUBMITTAL

~ 9/8 ISSUE TSC

~srssssaaasrasrasrassssr 3/8 1D/4 DC ELECTRICAL POWER CP&L SUBMITTAL ISSUE TSC

~sssssassaasas 12/11

~rarrsssssaarssrsaararas 6/ll 1E/4 GAS STORAGE TANKS (TSC 92-01)

CP&L SUBMITTAL ISSUE TSC

~ssrsaassassss 12/18

~rssssssasssssassarasraa 6/18 Dates prior to 10/31/92 are actuals; Dates after 10/31/92 are forecast; RD = REQUIRED DATE;

        • +***= SCHEDULED OUTAGE

SHNPP 18-MONTH REGULATORY SCHEDULE OCTOBER 1992 PAGE 2

CAT PRI SSUE 1992 1993 SE OCT OV DEC sTAN FEB MAR A R Y JUN JUL UG SE

        • as***

1994 OV C J C

I 2A/35 LIMITING COND FOR OP ACTION REQ (TSC 87-12)

RESPONSE

TO RAI

~ass 9/29 ISSUE TSC

~assaasa 11/25 2B/4 RETS REMOVAL OF TABLES FROM TS ISSUE TSC

~ssasasaaassassssaaa 1/22 2C/4 NAD FUNCTIONAL CHANGES (TSC 91-04)

ISSUE TSC

~ as ~ s ~ s ~ s ~ a ~ saaas

~ s ~ s 2/6 2D/4 AREA TEMPERATURE MONITORING (TSC 92-03)

- CPfcL SUBMITTAL

~ saaasasasssssss 12/31 ISSUE TSC s ~ s ~ s ~ ss ~ s ~ a ~ s ~ s ~ a ~ s ~ a ~ s 6/30 2E/4 MOLDED CASE CIRCUIT BREAKERS (TSC 88-12)

CPSL SUBMITTAL ISSUE TSC

~saaasasssa 1/22

~ s ~ a ~ s ~ s ~ s ~ s ~ a ~ s ~ s ~ s ~ s ~ a 7/22 2F/4 PRESSURE/TEMPERATURE LMTS REVISION (TSC 92-

)

CP&L SUBMITTAL ISSUE TSC

~ sasaaassass 1/29

~ sssssssasaasaasassssaas 7/31 2G/18 ESFAS SURVEILLANCE TESTING (TSC 90-

)

CP6iL SUBMITTAL ISSUE TSC

~ asass 1/15

~ assassaasssaassasssassaa 7/15 Dates prior to 10/31/92 are actuals; Dates after 10/31/92 are forecasts RD ~ REQUIRED DATEg

            • +*= SCHEDULED OUTAGE

SHNPP 18-MONTH REGULATORY SCHEDULE OCTOBER 1992 PAGE 3

~CAT PRI ISSUE 1992 1993 1994 SEP OCT NOV DEC JAN FEB MAR APR MAY JUL AUG SEP OCT NOV D C JAN EB 2H/4 NEGATIVE FLUX RATE TRIP DELETION (TSC 91-

)

CPSL SUBMITTAL ISSUE TSC

~ ssassss 9/1

~ 5 ~ 5 ~ 5 ~ 8 ~ 5 ~ 5 ~ 8 ~ 5 ~ 5 ~ s ~ 8 ~ s

~

2I/4 APPROVAL OF QA PROGRAM CHANGES NRC APPROVAL

~ 5 ~ 5 ~ 5 ~I~ s ~ s ~ > ~ 5 ~ s ~ss ~ > ~ s ~ s ~ 5 4/6 Dates prior to 10/31/92 are actualsy Dates after 10/31/92 are forecasts RD ~ REQUIRED DATEy EE SCHEDULED OUTAGE

SHNPP 18-MONTH REGULATORY SCHEDULE OCTOBER 1992 PAGE 4

CAT PRI ISSUE 1992 1993 S

P OCT OV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP 1994 NOV EC J B

3A/4

RESPONSE

TO GL 92-06'PERATOR LICENSING I

NATIONAL EXAM SCHEDULE

- CP&L SUBMITTAL

~ saaa 11/4 3B/4 RO

& SRO LICENSING EXAMS-EXAM REPORT 92-300

- CP&L SUBMITTAL

~ sssass 11/23 3C/4 BULL 88-11 (PRESS SURGE LINE THERMAL STRAT)

- CP&L SUBMITTAL

~ sasassssass 12/31 3D/4 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM DATA CP&L SUBMITTAL

~ sssssaa 3/1 3E/4 SUBMIT GOALS & OBJ (1993 EMERG EXERCISE)

CP&L SUBMITTAL

~ ass 5/1 3F/4 ANNUAL FSAR AMENDMENT f44 CP&L SUBMITTAL

~ assa 5/12 3G/4 SUBMIT SCENARIO & CONT INFO (1993 EMERG EXERCISE)

- CP&L SUBMITTAL

~ ass 6/1 3H/4 SUBMIT ANNUAL ECCS EVALUATION MODEL CHANGE REPORT (10 CFR 50.46 (A)(3)(ii)

CP&L SUBMITTAL

~ ass 7/26 Dates prior to 10/31/92 are actuals; Dates after 10/31/92 are forecasts RD = REQUIRED DATE;

          • +**= SCHEDULED OUTAGE

SHNPP 18-MONTH REGULATORY SCHEDULE OCTOBER 1992 PAGE 5

CAT PRI ISSUE 1992 1993 1994 SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB 3I/4 GL 88-20:

SUBMIT IPE PRA FOR SEVERE I

ACCIDENT VULNERABILITIES (10CFR 50 54(F))

SUBMIT IPE PRA aasa 8/31 Dates prior to 10/31/92 are actualsg Dates after 10/31/92 are forecasts RD = RE{}UIRED DATEg

~ SCHEDULED OUTAGE

1$ /04/92 CAROLINA POMER 6 LIGHT COMPAN S H N P P - 18 MOHTH REGULATORY AGEHDA (ATT. 3)

FACTS v SIIE PRI SOURCE MCUMEHT AGENCY UHIT NUC PRI/SCH IND ISSUE ACTION 90G8162 1

SITE REQUEST, GL 91-86 SHNPP tiRR 03/28/90 Z(A 3

SHNPP COHTAINMEHT ISOLATIOH VALVES ISC (TSC TO REVISE TS 3.6.3 TO MAKE IS 3.0.4 HOT APPLICABLE).

(TSC 90-01)

(HRC TAC M81210)

SUBMITTED 7/29/91; AMAITIHG NRC REVIEll 6 APPAOVAL.

(HRC NS PREHOTICED).

(D.C.

COOK IS THE LEAD PLANT FOR HRC AEVIEH).

88G8063 2

SITE REQUEST SHNPP 1

02/09/88 Z1B SHNPP - IHSTRUMEHTATIOH CHANGE TSC SUBMITTED 4/2/92.

AMAITIHC NRC REVIEH (CLARIFIES, CORRECTS 6

AMENDS 6 IHSIRUM.

AND APPROVAL; (PREHOTICED 6/24/92);

TECH SPECS)

PER HRC PM COlNEHTS, CP6L SUBMITTED REVISED TS PAGES 10/14/92.

(TSC 88-10)

TS 3.3 92G0296 SHNPP NRR 2

SITE REQUEST; 18 MONTH ACEHDA SHHPP-SAFETY IHJECTIOH PUMP FLOM MTG OH 8/14/92 REQUIREMEHTS 08/14/92 Z(C (TS 3.5.2)

(TSC 92-84)

SUBMITTED 9/8/92; NAITINC XRC AEVIEN AHD APPAOVAL.

92G0239 2

SITE REQUEST SHNPP HRR 05/20/92 Z1D 4

SHNPP-TSC - DC ELECTRICAL POVEA SYSTEM (PROVIDES ACTION STATEMEHT TO ALLOQ HAVINC BATTERY CHARGER OUT-OF-SERVICE)

(TSC 92%2)

SUBMITTED 6/29/92; HRC COMMENTS TO BE RESOLVED.

9280173 2

SITE REQUEST SHARP iiRR 04/15/92 Z1E SHNPP TSC-GAS STORAGE TANKS (LIMIT QUANTITY OF RADIOACTIVITYIH EACH TAm FROM 1.05 E5 CURIES TO 86,825 CURIES)

IS 3.11.2.6 (ISC 92-01)

AWAITING NEH PLAHT IHPUT.

ii/04/92 CAROLINA POMER 6 LIGHT CONPAHY S H H P P - i8 NOHTH REGULATORY AGENDA (ATT. 3)

FACTS v S!TE PRI SOURCE DOCUMENT AGEHCY UNIT HUC PRI/SCH IND ISSUE ACTIOH OBG8066 2

SITE REQUEST SHHPP i0/i4/88 Z2A 35 SHHPP-LINITIHG COHDITIOHS FOR OPERATOR ACTION REQ'NHTS (ALLOMS PLACING PLT INTO A NODE MHERE TS IS HO LONGER APPLICABLE)

TS 3.i.2.2.3/3.i.2.4/3.7.(.i (TS 87-i2)

IHRC TAC v N794i01 SUBNITTED i2/28/90; AMAITIHG HRC REVIEM t

APPROVAL. (PREHOTICED 2/28/9i).

HRC REQUEST FOR ADDITIONALACTIOH REC'D 7/28/92; (RESPONDED TO NRC'S RAI OH 9/29/92).

89G05i5 SHHPP HRR SITE REQUEST; GL 89-Gi i/3i/89 SHHPP - RADIATIOH EFFLUEHT/EHVIROHNEHTAL SUBMITTED 7/2i/92; SUBMITTED REVISED,TS (HRC-89-082)

MONITORING (REMOVAL OF TABLES FRON TS)

PAGES 9/3/92.

AMAITING HRC REVIEM h i0/29/89 Z2B TSC 87-84 (ORIG HLS-88-034 DTD 2/i6/88)

APPROVAL.

4 TS 3.3.3.i0/3.ii.i.i 90G83i8 2

SHHPP HRR HAD ORG.

CHANGE CONV.

MITH H. BOMLES 08/i7/98 Z2C 4

SHHPP-TECH SPEC CHANGE - NUCLEAR SUBNITTED 8/06/92.

AMAITING HRC REVIEM.

ASSESSNEHT DEPARTMENT FUHCTIOHAL CHANGES PREHOTICED 09/i6/92.

(IHCLUDES POTEHTIAL TSC SAFETY REVIEMS)

(IHTERNAL DUE DATE) 92G0408 2

SITE REQUEST SHHPP HRR 08/26/92 Z2D SHHPP AREA TENPERATURE NOHITORIHG TSC PHSC APPROVAL 8/26/92.

PACKAGE MITH (TSC 92-03)

(3.7.(2)

HLS FOR PREPARATIOH OF TSCR.

89G653G i

SITE REQUEST SHNPP HRR G3/i8/88 Z2E SHNPP-MOLDED CASE CIRCUIT BREAKERS (COHTAIHNEHT PEHETRATIOH CONDUCTOR OVER-CURREHT PROTECTION TEST REVISION)

TSC 88-(2 TS 4.8.4.i TECH.

SPEC CHANGE.

AMAITING PLANT APPROVAL OF PCR 2465, REV 8.

11 ji)4/92 CAROI.IHA POMER 6 LIGHT OIPANY S

H H P P - 18 NONTH REGULATORY AGEHDA (ATT. 3)

FACTS 4

SiTE PRI SOURCE DOCUNEHT AGENCY UHIT NUC PRI/SCH IHD ISSUE ACTIOH 92C0229 2

SITE REQUEST SHHPP 1

HRR 05/13/92 Z2F 4

SHNPP-TSC-PRESSURE/TENPERATURE LINITS REVISIONS:

SUBNIT REPLACENEHTS FOR 5 EFPY P/T LINITS CURVES (BASED OH LAST CAPSULE AHALYSIS)

AMAITIHG INPUT FRON NED.

COHSERVATIVE HEED DATE 8/93 BASED OH 90 VS. 70X CAPACITY FACTOR.

89C0516 2

MCAP-10272-A SUPP 2, REV 1

SHHPF HRR 05/01/89 Z2G 18 SHNPP-ESFAS SURVEILLANCE TESTIHC (TSC TO INCREASE ALLOMED OUTAGE TINES 6

SURVEILLANCE INTERVAL FOR ESFAS INSTRU-NENTATIOH).

(TS 3.3.2)

(TSC 89-

)

HED MORK SCOPE PLACED OH HOLD BY PLANT.

PLANT ASSESSIHG COST/BEHEFIT OF CHANGE.

91COaia 2

SITE REQUEST SHHPP NRR 10/16/91 Z2H 4

SHHPP NEGATIVE FLUX RATE TRIP DELETIOH HFS TO PROVIDE IHPUT.

(TS 3/4.3.1)

(ANEHDNEHT REQUESTED PRIOR TO RFO 45).

92CO~03 2

10 CFR 50.5<(A)(3)

SHHPP HRR 09/10/92 Z2I 4

SHNPP HRC APPROVAL OF QA PRKRAN CHAHGES SUBNITTED 8/6/92; AMAITING HRC REVIEM 6 APPROVAL.

92C0398 2

SHNPP NRR NRC-92-561 09/16/92 Z3A HHP:

CL 92-06:

OPERATOR LICEHSIHG HATIONAL EXNlIHATION SCHEDULE AMAITING IHPUT

11/04/92 CAROLINA POQER t LIGHT COMPANY S N H P P - 18 MONTH REGULATORY AGENDA (ATT. 3)

FACTS v SITE PRI SOURCE DOCUMEHT AGENCY UHIT HUC PRI/SCH IHD

'SSUE ACTION 92G0392 2

SNHPP 2

HRR HRC-92-0521, EXAM REPT 92-300 SHNPP REACTOR OPERATOR 6 SEHIOR OPERATOR LICEHSIHG EXAMINATIONS 09/11/92 Z3B EXAMINATIONREPT NO.92-300 4

ANITIHG IHPUT FROM TRAINING.

91G0349 2

HRC-91-486; BULL 88-11 SHHFP HRR 08/19/91 Z3C 4

SNHPP-PRESSURIZER SURGE LINE THERMAL HRC REQUIRES A HOTIFICATION NEN NODS.

STRATIFICATIOH (BULLETIH 88-11)

ASSOCIATED IIITH BULLETIH 88-11 NAVE BEEH IMPLEMEHTED.

92G0380 SHNPP HRR 10CFR26.71 (D)

SHNPP'-

SEMI ANNUAL FITNESS FOR DUTY DUE 60 DAYS FROM END OF REPORTIHG PERIOD REPORT 92G0250 2

10CFR50 SHNPP 1

NRR 06/16/92 Z3E 4

SHHPP SUBMIT GOALS 6 OBJECTIVES FOR 1993 FULL SCALE EXERCISE TO NRC SUBMITTAL REQ'D 75 DAYS PRIOR TO EXERC.

(EXERCISE SCHEDULED 7/27/93).

DUE DATES ARE APPROXIMATE.

92G0113 2

SHNPP NRR Z3F SHHPPWHUAL FSAR AMENDMEHT HO. 44 THE LSU NAS RECEIVED 75 PAGES (66 FROM IHTERIM 43A) AHD HAS RECEIVED COPIES OF 83 DESIGN DRAMIHGS.

11/04/92 CAROLIHA PONER 6 LIGHT COMPANY S H H P P - 18 MONTH REGULATORY AGENDA (ATT. 3)

FACTS 4 SITE PRI SOURCE DOCUMENT AGENCY UHIT HUC PRI/SCH IHD ISSUE ACTION 92G0268 2

10CFR50 SNNPF'RR 07/15/92 Z3G SHNPP SUBMIT SCENARIO 6 COHTROLLER IHFO SUBMITTAL REQ'D 45 DAYS PRIOR TO EXERC.

FOR 1993 FULL SCALE EXERCISE TO KRC (EXERCISE SCHEDULED 7/27/93).

DUE DATES ARE APPROXIMATE.

92G0373 SHNPP NRR 2

10 CFR 50.46(A)(3)(II) 1 08/27/92 Z3H SHNPP-SUBMIT ANNUAL ECCS EVALUATION MODEL CHAHGE REPORT (IH ACCORDANCE MITH 10 CFR 50.46 (A)(3) (II)

SUBMIT ANHUAL ECCS EVAL MODEL CHANGES.

10/31/89 Z3l 4

89GO542 2

CP6L LTR (NLS-89-290)

SNNPP tiRR SHHPP-GENERIC LETTER 88-20; INDIVIDUAL PLANT EXAMIHATIOH FOR SEVERE ACCIDEHT VULHERABILITIES (10CFR50.54(F)

SUBMIT IPE PRA.

CHS PREPARIHG.

CP6L SUBMITTAL DATE REVISED PER HLS-91-080 DATED 3/21/91.

92G8006 5

HED REQUEST SHNPP 08/20/92 Z5 4

SHHPP-RTD BYPASS ELIMIKATIOH NAITIHG HED INPUT AHD PRIORITY FROM SITE.

90G0231 5

SITE REQUEST SHNPF HRR 06/27/90 Z5 14 SHHPP-POTEHTIAL TSC TO CLARIFY ULTIMATE AMAITIHGSITE IHPUT BASED OH PCR 5342 HEAT SINX SPEC 3/4.7.5 ACTIO}IS (PCR DEVELOPMEHT 6 SCHEDULE TO BE ESTABLISHED).

(TSC 90-

)

11/04/92 CAROLINA PO'MER K LIGHT CO)1PANY S

H N P P - 18 NONTH REGULATORY AGENDA (ATT. 3)

FACTS :

SITE PRI SOURCE DOCUNENT AGENCY UNIT NUC PRI/SCH IND ISSUE ACTION 96G0221 5

SITE REQUEST SHllPP NRR 66/14/96 Z5 SHNPP-CONTAINNENT LINER TENPERATURE (REVISES DESIGN FEATURES SECTION TO REFERENCE LINER TENP VS.

PEAK AIR TEHP)

TS 5.2.2 (TS 96-

)

TECH SPEC CHANGE; AMAITING PLANT INPUT.

88G8659 5

SITE REQUEST SHNPP 62/17/88 Z5

~ 35 SHNPP - AIRLOCKS TSC (REV. TINE ALLOMED TO HAVE OUTER AIRLOCK DOOR OPEN TO REPAIR INOPERABLE INNER AIRLOCK DOOR).

(TSC 88-08)

TS 3.6.1.3 TECH SPEC CHANGE - PRIORITY AND SCHEDULE UNDER EVALUATION.

91G0415-5 SITE REQUEST SHNPP ltRR 16/11/91 Z5 4

SHNPP DIESEL GENERATOR SLUM START TESTING TSC (TS 3.8.1.1)

AMAITINGSITE INPUT AND PRIORITY.

90GS(04 5

SITE REQUEST SHNPP 07/10/90 Z5 4

SHNPP RAB/FHB ENERGENCY EXHAUST HVAC (REVISE RAB 6 FHB HVAC TSC TO NATCH CR HVACTS)

TS 3.7.7 6 3.9.12 (TSC 96-

)

TSC-AMAITING PLT INPUT.

88G8688 5

SITE REQUEST SHNPP 1

12/13/88 Z5 24 SHNPP ACCUNULATORS TSC'(PROVIDE ALTER-TECH SPEC CHANGE - PRIORITY AND SCHEDULE NATE ACCUNULATOR LEVEL/PRESSURE SURVEIL-UNDER EVALUATION.

LANCE NETHOD MHEN ALARH CIRCUITS INOPER-ABLE OR OUT OF SERVICE)

I (TSC 88-611)

TS 3;5.1