ML18010A944

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Shearon Harris Unit 1,Cycle 5 Colr,Per Tech Spec 6.9.1.6.4
ML18010A944
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/30/1992
From: Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18010A945 List:
References
HO-920154, NUDOCS 9212090107
Download: ML18010A944 (3)


Text

ACCELERATED DOCUMENT DISTRIBUTIONSYSTEM REGULBTO&NPORMBTION DISTRIBUTION LITEM (RIDE)

ACCESSION NBR:9212090107 DOC.DATE: 92/11/30 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION VAUGHNPG.E.

Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Rev 0 to Shearon Harris Unit 1,Cycle 5 COLR,per Tech Spec 6.9.1.6.4.

DISTRIBUTION CODE:

BOOZD COPIES RECEIVED:LTR J ENCL J SIZE:

I TITLE: OR Submittal:'General Distribution NOTES:Application for permit renewal filed.

DOCKET 05000400 05000400 RECIPIENT ID CODE/NAME PD2-1 LA LEPN INTERNAL:

ACRS'RR/DOEA/OTSB11 NRR/DST/SICBSH7 NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB.

EXTERNAL: NRC PDR COPXES LTTR ENCL 1

1 2

2 6

6 1

1 1

1 1

1 1

0 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD NRR/DET/ESGB NRR/DST/SELB 7E NRR/DST/SRXB SE 0

REG FILE 01 NSIC COPIES LTTR ENCL 1

li 1

1 1

1 1

1 1

0 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL D OOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRII3UTION

ESK, LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 20

COLL Carolina Power & Light Company P.O. Box 165 ~ New Hill,NC 27562 G.E. VAUGHN Vice President Harris Nuclear Project NOV 5 0 892 Letter Number:

HO-920154 United States Nuclear Regulatory Commission ATTENTION: Document Cont:rol Desk Washington, DC 20555 Gentlemen:

Carolina Power and Light Company (CP&L) hereby submits the Shearon Harris Nuclear Power Plant (SHNPP)

Core Operating Limits Report, Revision 0,

in support of Cycle 5 operations.

This report is submitted in accordance with the requirements of Technical Specification 6.9.1.6.4.

Please refer any questions regarding this submittal to Mr. Mickey Hamby at (919) 362-2204.

G.

E. Vaughn Vice President Harris Nuclear Project MRH:kls cc:

Mr. S.

D.

Ebne ter Mr. N.

G.

Le Mr. J.

E. Tedrow MEM/HO-920154/1/OS1 9212090107 921130 PDR ADOCK 05000400 P

PDR

1