ML18010A944
| ML18010A944 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/30/1992 |
| From: | Vaughn G CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18010A945 | List: |
| References | |
| HO-920154, NUDOCS 9212090107 | |
| Download: ML18010A944 (3) | |
Text
ACCELERATED DOCUMENT DISTRIBUTIONSYSTEM REGULBTO&NPORMBTION DISTRIBUTION LITEM (RIDE)
ACCESSION NBR:9212090107 DOC.DATE: 92/11/30 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION VAUGHNPG.E.
Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards Rev 0 to Shearon Harris Unit 1,Cycle 5 COLR,per Tech Spec 6.9.1.6.4.
DISTRIBUTION CODE:
BOOZD COPIES RECEIVED:LTR J ENCL J SIZE:
I TITLE: OR Submittal:'General Distribution NOTES:Application for permit renewal filed.
DOCKET 05000400 05000400 RECIPIENT ID CODE/NAME PD2-1 LA LEPN INTERNAL:
ACRS'RR/DOEA/OTSB11 NRR/DST/SICBSH7 NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB.
EXTERNAL: NRC PDR COPXES LTTR ENCL 1
1 2
2 6
6 1
1 1
1 1
1 1
0 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD NRR/DET/ESGB NRR/DST/SELB 7E NRR/DST/SRXB SE 0
REG FILE 01 NSIC COPIES LTTR ENCL 1
li 1
1 1
1 1
1 1
0 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL D OOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRII3UTION
- ESK, LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 20
COLL Carolina Power & Light Company P.O. Box 165 ~ New Hill,NC 27562 G.E. VAUGHN Vice President Harris Nuclear Project NOV 5 0 892 Letter Number:
HO-920154 United States Nuclear Regulatory Commission ATTENTION: Document Cont:rol Desk Washington, DC 20555 Gentlemen:
Carolina Power and Light Company (CP&L) hereby submits the Shearon Harris Nuclear Power Plant (SHNPP)
Core Operating Limits Report, Revision 0,
in support of Cycle 5 operations.
This report is submitted in accordance with the requirements of Technical Specification 6.9.1.6.4.
Please refer any questions regarding this submittal to Mr. Mickey Hamby at (919) 362-2204.
G.
E. Vaughn Vice President Harris Nuclear Project MRH:kls cc:
Mr. S.
D.
Ebne ter Mr. N.
G.
Le Mr. J.
E. Tedrow MEM/HO-920154/1/OS1 9212090107 921130 PDR ADOCK 05000400 P
1