ML18010A944

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Shearon Harris Unit 1,Cycle 5 Colr,Per Tech Spec 6.9.1.6.4
ML18010A944
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/30/1992
From: Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18010A945 List:
References
HO-920154, NUDOCS 9212090107
Download: ML18010A944 (3)


Text

ACCELERATED DOCUMENT DISTRIBUTION SYSTEM REGULBTO&NPORMBTION DISTRIBUTION LITEM (RIDE)

ACCESSION NBR:9212090107 . DOC.DATE: 92/11/30 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION VAUGHNPG.E. Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Rev 0 to Shearon Harris Unit 1,Cycle 5 COLR,per Tech Spec 6.9.1.6.4.

DISTRIBUTION CODE: BOOZD TITLE: OR COPIES RECEIVED:LTR Submittal:'General Distribution J ENCL J SIZE: I NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPXES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 li LEPN 2 2 INTERNAL: 6 6 NRR/DET/ESGB 1 1 ACRS'RR/DOEA/OTSB11 1 1 NRR/DST/SELB 7E 1 1 NRR/DST/SICBSH7 1 1 NRR/DST/SRXB SE 1 1 NUDOCS-ABSTRACT 1 1 0 1 0 OGC/HDS1 1 0 REG FILE 01 1 1 RES/DSIR/EIB. 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL D ESK, OOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRII3UTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 20

COLL Carolina Power & Light Company P.O. Box 165 ~ New Hill, NC 27562 G.E. VAUGHN Vice President Harris Nuclear Project NOV 5 0 892 Letter Number: HO-920154 United States Nuclear Regulatory Commission ATTENTION: Document Cont:rol Desk Washington, DC 20555 Gentlemen:

Carolina Power and Light Company (CP&L) hereby submits the Shearon Harris Nuclear Power Plant (SHNPP) Core Operating Limits Report, Revision 0, in support of Cycle 5 operations. This report is submitted in accordance with the requirements of Technical Specification 6.9.1.6.4.

Please refer any questions regarding this submittal to Mr. Mickey Hamby at (919) 362-2204.

G. E. Vaughn Vice President Harris Nuclear Project MRH: kls cc: Mr. S. D. Ebne ter Mr. N. G. Le Mr. J. E. Tedrow MEM/HO-920154/1/OS1 9212090107 921130 PDR ADOCK 05000400 P PDR

1