ML18010A832

From kanterella
Jump to navigation Jump to search
Forwards Listed Info,Per NRC Request as Result of 921007 Meeting Re Mod to Facility High Head Safety Injection Alternate mini-flow Sys
Date released: 08/31/2018 Download: ML18010A832


Forwards Listed Info,Per NRC Request as Result of 921007 Meeting Re Mod to Facility High Head Safety Injection Alternate mini-flow Sys
ML18022A903
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/09/1992
From: Mccarthy D
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18022A903 (303)
Reactor Aux Bldg CS Piping from Anchor 293 to Anchor 7421 Stress Isometric.Sheet 1 of 1
ML18010A861
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/09/1992
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18010A861 (1)
Reactor Aux Bldg - Unit 1 CS Piping Stress Isometric.Sheet 1 of 1
ML18010A859
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/09/1992
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18010A859 (1)
Change 1,Rev 5 to Vol 3,Part 9 of Plant Operating Manual Procedure OST-1825, Safety Injection:Esf Response Time, Train a 18 Month Interval on Staggered Test Basis Mode 5 - 6.
ML18010A849
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/23/1992
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18010A849 (105)
Rev 3 to Vol 3,Part 9 of Plant Operating Manual Procedure OST-1083, ESFAS Train 'A' Slave Relay Test 18 Months Interval Modes 5 & 6.
ML18010A837
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/04/1992
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18010A837 (61)
Change 2,Rev 2 to Vol 4,Part 7 of Plant Operating Manual Procedure MST-I0080, RCS Wide Range Pressure P-0402, Reflecting Case Level Change to Case III
ML18010A836
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/28/1992
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18010A836 (8)
Rev 2 to Calculation CS-0023, Mechanical Analysis & Calculations for 1CS-753 Charging Pump C to RWST Isolation Valve.Calculation Applicable to GL 89-10.W/two Oversize Drawings
ML18010A835
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/09/1992
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18010A835 (31)
Rev 2 to Calculation CS-0022, Mechanical Analysis & Calculations for 1CS-752 Charging Pump C RWST Isolation Valve. Info Applicable to GL 89-10
ML18010A834
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/09/1992
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18010A834 (30)
Rev 2 to Calculation CS-0021, Mechanical Analysis & Calculations for 1CS-746 Charging Pump a to Refueling Water Storage Tank Isolation Valve. Info Applicable to GL 89-10
ML18010A833
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/09/1992
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18010A833 (194)
Rev 2 to Calculation CS-0020, Mechanical Analysis & Calculations for 1CS-745 Charging Pump a to RWST Isolation Valve. Info Applicable to GL 89-10
ML18010A831
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/08/1992
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML18010A831 (32)