ML18010A796

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to PLP-106, Shearon Harris Unit 1,Cycle 4 Colr. Change Incorporates Section 2.7 to Specify Min Boron Concentration for Refueling Operations,Per Amend 30 to TS
ML18010A796
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/23/1992
From: Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18010A797 List:
References
HO-920135, NUDOCS 9210060026
Download: ML18010A796 (3)


Text

~ccrc,za~rzo orsrmaVrrOw ozrvrOr Sr@.~rrOx svsrzrvr REUULAT<+ INFORMATION DISTRIBUTIONSTEM (RIDE)

ACCESSION NBR:9210060026 DOC.DATE: 92/09/23 NOTARIZED: NO DOCKET ¹ FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION VAUGHNFG.E.

Carolina Power a Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Rev 3 to PLP-106, "Shearon Harris Unit 1,Cycle 4

COLR." Change incorporates Section 2.7 to specify min boron concentration for refueling operations,per Amend 30 to TS.

DISTRIBUTION CODE:

AOOZD COPIES RECEIVED:LTR g ENCL g 'IZE:

I+l TITLE: OR Submittal: General Distribution NOTES:Application for permit renewal filed.

05000400

~

RECIPIENT ID CODE/NAME PD2-1 LA LE,N COPIES LTTR ENCL 1

1 2

2 RECIPIENT

'OPIES ID CODE/NAME LTTR ENCL PD2-1 PD 1

1 INTERNAL: ACRS NRR/DOEA/OTSB11 NRR/DST/SICBSH7 NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EXTERNAL: NRC PDR 6

6 1

1 1

1

.1 1

0 1

1 1

1 NRR/DET/ESGB NRR/DST/SELB 7E NRR/DST/SRXB SE OC/+PMB RC8 Q~

Ol NSIC 1

1 1

1 1

1 1

0 1

1 1

1 NOTE TO ALL RIDS RECIPIENTS:

0 PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 20

Form 244 Carolina Power & Light Company Company Correspondence HARRIS NUCLEAR PROJECT P.O.

Box 165 New Hill, North Carolina 27562 September 23, 1992 Letter Number:

HO-920135 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 Gentlemen:

Carolina Power and Light Company (CP6rL) hereby submits the Shearon Harris Nuclear Power Plant (SHNPP)

Core Operating Limits Report, Revision 2,

in support of Cycle 4

operations.

This change incorporates Section 2.7 to specify the minimum boron concentration for refueling operations as required by Amendment ¹30 to the SHNPP Technical Specifications.

This report is submitted in accordance with the requirements of Technical Specification 6.9.1.6.4.

Please refer any questions regarding this submittal to Mr. Mickey Hamby at (919) 362-2204.

Yours very truly, G.

E. Vaughn Vice President Harris Nuclear Project MRH:dac cc:

Mr. S.

D. Ebneter Ms.

B. L. Mozafari Mr. J.

E. Tedrow xe-zoo

i'EM/HO-920135/~10S1 9210060026 920923 PDR ADOCN,05000400 P

PDR

~,

4

~

f

, ~ vy