ML18010A789

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/92-18 on 920831-0904.No Violations or Deviations Noted
ML18010A789
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/21/1992
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Watson R
CAROLINA POWER & LIGHT CO.
Shared Package
ML18010A790 List:
References
NUDOCS 9209250212
Download: ML18010A789 (4)


See also: IR 05000400/1992018

Text

September

21,

1992

Docket No. 50-400

License

No. NPF-63

Carolina

Power

and Light Company

ATTN:

Hr.

R. A. Watson

Senior Vice President

Nuclear Generation

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NO.. 50-400/92-18

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

L. King on August

31 - September

4,

1992.

The inspection

included

a review of

activiti'es authorized for your Shearon

Harris facility.

At the conclusion of

the inspection,

the findings were discussed

with those

members

of your staff

~

~

identified in the enclosed

report.

Areas examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures, for

control of the Shearon

Harris facility during

an emergency.

Within the scope of this inspection,

no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title

10,

Code of Federal

Regulations,

a copy of thi's letter and its enclosure will be

placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Enclosure:

NRC Inspection

Report

(cc w/encl

- See

page 2).

(Original signed

by T. A. Peebles)

Thomas

A. Peebles,

Chief

Operations

Branch

Division of Reactor Safety

9209250212

920921

PDR

ADOCK 05000400

.

G

PDR

Carolina

Power

and Light Company

cc w/encl:

G.

E.

Vaughn

Vice President

Harris Nuclear Project-

P. 0.

Box 165

New Hill, NC

27562

C.

S. Hinnant

Plant General

Manager

Harris Nuclear Plant

P. 0.

Box 165

New Hill, NC

27562

C.

S. Olexi k, Jr.,

Manager

Regulatory Compliance

Harris Nuclear Project

P. 0.

Box 165

New Hill, NC

27562

H.

Ray Starling

Vice President

-. Legal Department

Carolina

Power

and Light Co.

P. 0.

Box 1551

Raleigh,

NC

27602

Dayne

H. Brown, Director

Division of Radiation Protection

N.

C. Department of Environment,

Health

5 Natural

Resources

P. 0.

Box 27687

Raleigh,

NC

27611-7687

Ms. Gayle

B. Nichols

Staff Counsel

SC Public Service

Commission

P. 0.

Box 11649

Columbia,

SC

29211

bcc w/encl:

H. Christensen,

RII

N. Le,

NRR

Document Control

Desk

NRC Resident

Inspector

U.S. Nuclear Regulatory

Commission

Route

1,

Box 315B

New Hill, NC

27562

RII:DRS

viz>

LKing:lk7sd

09/i7 /92

RI

.D

R rlenjak

09/(q/92

RI I:DR

HChristensen

09/1II /92

RI I:DRS

T eeb

es

09/~t/92