ML18010A707

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/92-12 on 920622-26.No Violations Noted
ML18010A707
Person / Time
Site: Harris 
Issue date: 07/27/1992
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Watson R
Carolina Power & Light Co
Shared Package
ML18010A708 List:
References
NUDOCS 9208110248
Download: ML18010A707 (4)


See also: IR 05000400/1992012

Text

JUL RV 19R

~

~

Docket No. 50-400

. License No. NPF-63

Carolina Power and Light Company

ATTN: Mr. R. A. Watson

Senior Vice President

Nuclear Generation

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-400/92-12

This refers to the inspection conducted by R. P. Carrion of this office on June 22-

~

~

26, 1992.

The inspection included a review of activities authorized for your

Shearon Harris facility. At the conclusion of the inspection, the findings were

discussed with those members of your staff identified in the report.

Areas examined during the inspection are identified in the report.

Within these

areas, the inspection consisted of selective examinations of procedures and

representative

records, interviews with personnel, and observation of activities in

progress.

The enclosed Inspection Report identifies activities that appeared to violate NRC

requirements that are not cited; therefore, a response

is not required.

The violation

is not being cited because the criteria specified in Section V.A of the Enforcement

Policy were satisfied.

In accordance with 10 CFR 2.790(a),

a copy of this letter and its enclosure will be

placed in the NRC Public Document Room.

9208110248

920727

i.

PDR

- ADOCK 05000400

8

PDR

0

0

Caro)ina Power and Light Company

Should you have any questions concerning this letter, please contact us.

Sincerely,.

ORIGINALStGNED

BY'ILLIAM

E. CLNE

William E Cline Chief

Radiological Protection and

Emergency Preparedness

Branch

Division of Radiation Safety

and Safeguards

Enclosure:

NRC Inspection Report

cc w/encl:

G. E. Vaughn

~

~

Vice President

Harris Nuclear Project

P. O. Box 165

New Hill, NC 27562

C. S. Hinnant

Plant General Manager

Harris Nuclear Plant

P. O. Box 165

New Hill, NC 27562

C. S. Olexik, Jr., Manager

Regulatory Compliance

Harris Nuclear Project

P. O. Box 165

New Hill, NC 27562

H. Ray Starling

Vice President - Legal Department

Carolina Power and Light Co.

P. O. Box 1551

Raleigh, NC 27602

cc w/encl:

(See page 2)

Carolina Power and Light Company

cc w/encl: (cont'd)

Dayne H. Brown, Director

Division of Radiation Protection

N. C. Department of Environment,

Health 5 Natural Resources

P. O. Box 27687

Raleigh, NC 27611-7687

~

3

bcc w/encl:

H. Christensen,

Rll

N. Le, NRR

Document Control Desk

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route 1, Box 315B

New Hill, NC 27562

RII:DRSS

RCar ion

7/t/ 2

RII:DRSS

T ecker

A%92

RII:DRP

HChristensen

'7/+2