ML18010A559

From kanterella
Jump to navigation Jump to search
Confirms 920406-10 Dates for NRC Insp of Program Developed Per Generic Ltr 89-10, Safety Related Motor-Operated Valve Testing & Surveillance. Listed Info Should Be Provided to Assist in Preparation of Insp
ML18010A559
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/20/1992
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Eury L
CAROLINA POWER & LIGHT CO.
References
GL-89-10, NUDOCS 9203100084
Download: ML18010A559 (4)


Text

February 20, 1992 Docket No. 50-400 License No.

NPF-63 Carolina Power and Light Company ATTN.

tir. Lynn W. Eury Executive Vice President

. Power Supply P.

0.

Box 1551

Raleigh, NC 27602 Gentlemen:

SUBJECT:

NPC GENERIC LETTER 89-10 INSPECTION AT SHEARSGN HARRIS NUCLEAR PGhER PLANT DURING THE WEEK OF April 6-10, 1992 lhis letter is to confi>m the abcve dates for a Nuclear Regulatory Commission inspection at your Shearson Harris Nuclear Plant.

The inspection will examine

, the program you have developed in response to Generic Letter 89-10, "Safety Pelated Ho.or-Operated Vaive Testtrc and Surveillance."

The dates were agreed to during telephone conservations between Louis Rowell of your Licensing staff and F. Jape of this office.

As discussed with Louis Rowell on February 13, 1992 it is our understandirg that you will forwarc us thc following information to aid on preparing for the inspection:

l.

The procec.'urc cr other documents that describe your tiOY program and the method used for design basis delta pressure calculations.

2.

A list of the valves in the prcrram (if not already included in the program description requested in 1 above).

3.

A list of the valves fot which you.have completed the design basi-s reviews.

4.

A list of the valves that have been diagnostically tested to verify thai'r capabilities in accoraance with the program.

92031000B4 920220 PDR ADOCK 05000400 G

PDR Q/

I

Carol ina Power I.i gh.. Co.

February 20, 1992 Shoulo you h~ve questions regarding this irspcction, please contact Frank Jape at (404) 331-4182.

Sincerely, Original signed by

.MB Shymlock / for Caudle A. Julian, Chief Engineering Branch Division of Reactor Safety cc w/encl:

R.

B. Richev, Vice Pt esioent Harris Nuclear Project Box

'$65 New Hill, NC 27562 C.

S. Minnant General t~ianager Harris Nuclear Plant Bcx l65 New Hill, I'IC 27562 C.

S. Olexik, Jr.,

Yianaeer Regulatory Compliarce Harris Nuclear Project P. 0.

Box 165 New Hill, NC 27562 H.

Ray Ster'line IIanager - Legal Department

~

Carolina Power and Light Co.

P.

G.

Box 1551

Raleioh, NC 27602 Dayne H. Brown, Director Division of Radiation Prctection N.

C. Department of Environment, Health 6 Natural Resources P.

0.

Box 27687

Raleigh, NC 2761).-7607

Carolina Power Light Co.

February 20, 1992 bc-w/eccl:

J.

Johnson.

PIT.

H. Christensen, RI'.

B. Hozafari, Nflf!

T. Scarbrough, NRP Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 1,

Box 315B New Hill, NC 27562 g~!I a ilor 0"/ I>/92 Rl:D,P HC ristevser,,

02/V{/92