Responds to NRC Re Violations Noted in Insp Rept 50-400/91-13.Corrective Actions:Ts Conpliance Achieved. Action to Submit Change to Clarify TS Planned
ML18010A558
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/02/1992
From: Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-768 HO-920057-(O), NUDOCS 9203090086
Download: ML18010A558 (2)


Text

ACCELERATED DISTRIBUTION DEMONSTT&TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCF~SICN NBR:9203090086 DOC.DATE: 92/03/02 NOTARIZED: NO LIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina UTH.NAME AUTHOR AFFILIATION RICHEY,R.B.

Carolina Power

& Light Co.

RECIP.NAME RECIPiENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 921111 ltr re violations noted in insp rept 50-400/91-13.Corrective actions:TS conpliance achieved.

Action to submit change to clarify TS planned.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR J ENCL 0 SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Application for permit renewal filed.

DOCKET ¹ 05000400 05000400 RECIPiENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/DEIIB DEDRO NRR MORISSEAU,D NRR/DLPQ/LPEB10 NRR/DREP/PEPB9H NRR/PMAS/ILRB12, OE EG FILE 02 EXTERNAL: EG&G/BRYCE,J.H.

NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME'OZAFARI,B.

AEOD AEOD/DSP/TPAB NRR HARBUCKgC.

NRR/DLPQ/LHFBPT NRR/DOEA/OEAB NRR/DST/DIR SE2 NUDOCS-ABSTRACT OGC/HDS1 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENI'ONTROLDESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL

I@

Carolina Power & LIght Company P.O. Box 165 ~ New Hill, N.C. 27562 R. B. RICHBY Vice President Harris Nuclear Project

, MAR - 2 1992 Letter Number:

HO-920057 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 NRC-768 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 LICENSE NO. NPF-63 Gentlemen:

In our let'ter of November 11, 1992, Carolina Power 6 Light Company (CP&L) responded to the Notice of Violation issued with Inspection Report No. 50-400/91-13, dealing with the use of Auxiliary Feedwater during plant startup.

As noted in our original response, full compliance with the Technical Specifications has been

achieved, but an additional action to submit a, change request to clarify Technical Specifications was planned.

Following additional analysis, it has been determined that a change to Technical Specifications is not required at this time.

Additional changes to Auxiliary Feedwater and/or the Technical Specifications may be pursued at

'a later time as a plant enhancement.

All actions required to address this Notice of Violation have been completed.

Ifyou should have any questions concerning our corrective actions, please contact us.

Very truly yours, R.