ML18010A535
| ML18010A535 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 02/19/1992 |
| From: | Vaughn G CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NLS-92-051, NLS-92-51, NUDOCS 9202250272 | |
| Download: ML18010A535 (3) | |
Text
~ACCELERATED DISTRIBUTION DEMONS TION SYSTEM REGULA1Y INFORMATION DISTRZBUTIO YSTEM (RIDE)
,ACCESSION NBR:9202250272 DOC;DATE: 92/02/19 NOTARIZED: NO DOCKET
.""'"FACIL:50-$00-'Shearon'"Harris" Nuclear"Power "Plant;-Unit -.1.
Carolina-05000400 AUTH SHAME AUTHOR AFFILIATION VAUGHNFG.E.
Carolina Power
& Light Co.
.RECIP.NAME
,RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Provides schedule for restoration of analyses of record of ECCS evaluation model changes. Reanalyses of both small a
large break LOCA events planned prior to Cycle 6.
DISTRIBUTION CODE:
AOOZD COPIES RECEIVED:LTR
( ENCL V
SIZE:
TITLE: OR Submittal:
General Distribution D
NOTES:Application for permit renewal filed.
05000400
/
RECIPIENT ID CODE/NAME PD2-1 LA MOZAFARI,B.
INTERNAL: ACRS NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB8H7 NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-1 PD NRR/DET/ECMB 7D NRR/DOEA/OTSB11 NRR/DST/SELB 7E NRR/DST/SRXB 8E OC/LFMB 01 NSIC COPIES LTTR ENCL D
D D
NOTE TO ALL"RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WAS'ONTACI'HEDOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
A D
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL g&
.C~L Carolina Power & Light Company P.O. Box 1551
~ Raleigh, N.C. 27602 G. E. VAUGHN Vise President Nuclear Senrtees Department tFEB19 )39K SERIAL: NLS-92-051 10 CFR 50.46 United States Nuclear Regulatory Commission ATTENTION:
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 EMERGENCY CORE COOLING SYSTEM (ECCS)
EVALUATION MODEL CHANGES Gentlemen:
The purpose of this letter is to provide Carolina Power
& Light Company's (CP&L) schedule for restoration of the analyses of record as required by 10 CFR 50.46 and 10 CFR 50, Appendix K for the Shearon Harris Nuclear Power Plant (SHNPP).
On July 26, 1991, CP&L notified the NRC of changes to the Emergency Core Cooling System (ECCS) Evaluation Model for SHNPP.
Subsequently, by letter dated January 15,
- 1992, the NRC informed CP&L that the July 1991 submittal satisfies the requirements of 10 CFR 50.46 to report the changes and to assure that 10 CFR 50.46 performance requirements continue to be met.
- However, the NRC requested that CP&L propose a schedule for reanalysis of the large and small break Loss of Coolant Accidents (LOCAs).
CP&L plans for the reanalysis of both the large and small break LOCA events prior to Cycle 6 for SHNPP, which will coincide with a change in nuclear fuel vendors.
Accordingly, these analyses of record will be approved and in place to support Refueling Outage No. 5, currently scheduled to begin in March 1994.
Please refer any questions regarding this submittal to Mr. Lewis S.
Rowell at (919) 546-2770.
Yours very truly, LSR/lsr cc:
Mr. S.
D. Ebneter Ms. B. L. Mozafari Mr. J.
E. Tedrow c
9202250272 920219 PDR. rADDGK 05000400 P
'" j( 'DR
j k