Forwards Insp Rept 50-400/91-24 on 911019-1115 & Notice of Violation.Nrc Concerned About Violations Due to Licensee Failure to Provide Adequate Surveillance Test Procedures & Failure to Perform Adequate Boric Acid Pump Testing
ML18010A465
Person / Time
Site: Harris 
Issue date: 11/27/1991
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Eury L
Carolina Power & Light Co
Shared Package
ML18010A467 List:
References
NUDOCS 9112120127
Download: ML18010A465 (3)


See also: IR 05000400/1991024

Text

NOV 2 7

1991

Oocket

No. 50-400

License

No. NPF-63

Carolina

Power and Light Company

ATTN:

Nr. Lynn W. Eury

Executive Vice President

Power Supply

P. 0.

Box 1551

Raleigh,

NC 27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC

INSPECTION

REPORT

NO. 50-400/91-24)

This refers

to the

inspection

conducted

by J.

Tedrow of this office on

October

19 - November

15,

1991.

The

inspection

included

a

review of

activities

authorized for your Harris facility.

At the conclusion of the

inspection,

the findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of

activities in progress.

Based

on the results

of this inspection,

certain of your activities

appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

We are

concerned

about

the violations

because

they

involved

a failure to provide

an adequate

surveillance test procedure, failure

to

perform

adequate

boric acid

pump testing,

and failure to adequately

identify, document,

and correct deficiencies.

These violations, in addition

to identified weaknesses

regarding failure to recognize that additional

pump

testing

may

have

been

required following maintenance,

failure to maintain

system

design control, failure to implement manufacturer's

recommendations

to

calibrate

heat

trace

control circuits,

and the failure to identify control

circuits related to meeting technical

specification surveillance

requirements,

indicate potential

program deficiencies.

You are required to respond

to this letter and should follow the instructions

specified

in the

enclosed

Notice

when

preparing

your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed

corrective actions

and the results of future

inspections,

the

NRC will determine

whether

further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

'P112120i27

9'11127

PDR

ADOCK 05000400

8

PDR

Carolina

Power

and Light Company

NOV 8 / 199f

(cc w/encls cont'd),

Dayne H. Brown, Chief

Division of Radiation Protection

N. C. Department of Environment,

Health

5 Natural

Resources

P. 0.

Box 27687

Raleigh,

NC 27611-7687

bcc w/encls:

Document Control

Desk

H. Christensen,

RII

B. Mozafari,

NRR

NRC Resident Inspector

U.S. Nuclear Regulatory

Commission

Route 1,

Box 315B

New Hill, NC

27562

RII

MG1

man:tj

11/~791

",iY

HChristensen

11/+91

Carolina

Power

and Light Company

~JOVa

P

l8S)

In accordance

with 10

CFR 2.790, of the

NRC's

"Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have

any questions

concerning this letter,

please

contact us.

Sincerely,

Origsnal

signed

by:

Harold 0. Christensen/for

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

cc w/encls:

R. B. Richey, Vice President

Harris Nuclear Project

Box 165

New Hill, NC 27562

C. S. Hinnant

Plant General

Manager

Harris Nuclear Project

Box 165

New Hill, NC 27562

C. S. Olexik, Jr.,

Manager

Regulatory Compliance

Harris Nuclear Project

Box 165

New Hill, NC 27562

Mr. H. Ray Starling

Carolina

Power and Light Company

Manager - Legal Department

P. 0.

Box 1551

Raleigh,

NC 27602

(cc w/encls cont'd - See

page

3)