ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM r)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR:9109240376 DOC.DATE: 91/09/20 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION VAUGHN,G.E.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Responds to NRC ltr re violations noted in requalification exam rept 50-400/91-300.Corrective actions:plans to revise applicable facility procedures to require operators to ensure reactor shutdown prior to initiating self injection.
DISTRIBUTION CODE:
IE42D COPIES RECEIVED:LTR 3 ENCL 5 SIZE:
TITLE: Operator Licensing Examination Reports DOCKET 05000400 R
NOTES:Application for permit renewal filed.
I 05000400 RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL RECIPIENT ID CODE/NAME MOZAFARI,B.
COPIES LTTR ENCL 1
INTERNAL: ACRS G FI RNAL: NRC PDR LHFB11 02 NRR SHANKMAN,S NRR/DLPQ/LOLB10 RGN2 FILE 01 NSIC NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL
Carolina Power 8 Light Company P.O. Box 1551 ~ Rateigh, N.C. 27602 G. E. VAUGHN Vice President Nuclear Services Department SEP 3Q 199$
SERIAL:
NLS-91-244 United States Nuclear Regulatory Commission ATTENTION:
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63
RESPONSE
TO NRC REQJALIFICATION EA'AMINATION REPORT 50-400/91-300 Gentlemen:
In your letter of August 12, 1991 transmitting the Shearon Harris Nuclear Power Plant (SHNPP) Requalification Examination Report 50-400/91-300, a
concern was identified with the simulator portion of the operating examinations.
During the simulator examinations, the operators manually initiated safety injection before assuring the reactor was shutdown.
Your letter invited CP&L to respond within 30 days of receipt of the letter as to corrective actions for this condition.
Carolina Power
& Light Company will revise the applicable SHNPP procedures to require operators to ensure the reactor is shutdown prior to manually initiating safety injection.
These procedure revisions and required training for licensed operators will be completed by December 31, 1991.
Please refer any questions regarding this submittal to Mr. Lewis S. Rowell at (919) 546-2770.
G.
E. Vaughn LSR/jbw (1296HNP) cc:
Mr. S.
D. Ebneter Ms.
B. L. Mozafari Mr. J.
E. Tedrow (NRC-SHNPP)
AOpcgi 0~~000400 9.40376 9i0920 PDF; tvr f)~
)
e C,
l e