Forwards SALP Rept 50-400/91-12 for Dec 1989 - June 1991
ML18010A356
Person / Time
Site: Harris 
Issue date: 07/23/1991
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Eury L
CAROLINA POWER & LIGHT CO.
Shared Package
ML18010A357 List:
References
NUDOCS 9108120046
Download: ML18010A356 (3)


See also: IR 05000400/1991012

Text

SUL 23 1991

Docket No. 50-400

License

No. NPF-63

Carolina

Power and Light Company

ATTN:

Mr. Lynn W. Eury

Executive Vice President

Power Supply

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

SYSTEMATIC ASSESSMENT

OF LICENSEE

PERFORMANCE

(NRC INSPECTION

REPORT

NO. 50-400/91-12)

The

NRC

Systematic

Assessment

of Licensee

Performance

(SALP)

has

been

completed for your Harris facility.

The facility was evaluated for the period

December

1,

1989

through

June

1,

1991.

The results

of the evaluation

are

documented

in the enclosed Initial SALP Report.

This report will be discussed

with you at

a public meeting to be held at the Harris site

on August 1, 1991,

at 10:00 a.m.

The performance of the Shearon

Harris facility was evaluated

in the functional

areas

of plant operations,

radiological controls,

maintenance/surveillance,

emergency

preparedness,

security,

engineering/technical

support,

and safety

assessment/quality

verification.

Performance

at Harris

was superior.

No major weaknesses

were identified and

a

number of strengths

were evident.

A high level of performance

was sustained

in five of the

seven functional areas

and significant improvement

was noted in

a

sixth-security.

A

good

level

of

performance

continued

in

the

maintenance/surveillance

area

with several

strengths

noted.

However,

performance

in this latter area

was diluted

by difficulties with procedural

adherence.

The entire organization

is to be congratulated.

Management

has

provided the

necessary

resources

to support superior

performance

and improve the operations

and safety of the plant.

The plant and corporate staffs

have functioned well

as

a

team

and

responded

positively to challenges

as

evidenced

by this

assessment.

Continued attention

to improve procedural

adherence

and additional

focus

on

the newly created three-tier

self-assessment

program is warranted.

cy g ()g g P 0046 9

pg~g()

pgp

ggOCK

pgg

6

Carolina

Power and Light Company

JUL 23 1991

Should

you

have

any questions

concerning

this letter,

we will be glad to

discuss

them with you.

Sincerely,

Enclosure:

Initial SALP Report-

Shearon

Harris

Original signed

by

Stewart

D. Ebneter

Stewart

D. Ebneter

Regional Administrator

cc w/encl:

R. B. Richey, Vice President

Harris Nuclear Project

Box 165

New Hill, NC

27562

C. S. Hinnant

General

Manager

Harris Nuclear Plant

Box 165

New Hill, NC

27562

C. S. Olexik, Jr.,

Manager

Regulatory Compliance

Harris Nuclear Project

P. 0.

Box 165

New Hill, NC

27562

Mr. H.

Ray Star ling

Manager - Legal Department

P. 0.

Box 1551

Raleigh,

NC

27602

Dayne

H. Brown, Director

Division of Radiation Protection

N.

C. Department of Environment,

Health

& Natural

Resources

P. 0.

Box 27687

Raleigh,

NC

27611-7687

c w/encl:

Document Control

Desk

H. Christensen,

RII

B. Mozafari,

NRR

(bcc w/encl cont'd - See

page

3)

Carolina

Power

and Light Company

JUL 23 19S1

(bcc w/encl cont'd)

NRC Resident Inspector

U.S. Nuclear Regulatory

Commission

Route

1, Box 315B

New Hill, NC

27562

RII:

RP

HC ristensen:tj

07/['2/91

~ ~al(ett

RI

J edrow

07/

/91

I:DRS

CJ

07+/91

RII:D P

DVerrelli

07/I7/91

es

0

6/91

RI I:NRR

BMozafari

07/I 7/91

RII:ORA

JMilhoan

07/

/91

RII:NRRt.-~

EAdensam

07/ l?/91