ML18009A971

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/91-13 on 910518-0614 & Notice of Violation.Nrc Concerned That Violation Involved Two Inoperable Auxiliary Feedwater Sys Flow Paths While Operating Plant in Hot Standby Condition
ML18009A971
Person / Time
Site: Harris 
Issue date: 06/27/1991
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Eury L
Carolina Power & Light Co
Shared Package
ML18009A972 List:
References
NUDOCS 9107160105
Download: ML18009A971 (6)


See also: IR 05000400/1991013

Text

Docket No. 50-400

License

No. NPF-63

JUN 87 199l

Carolina

Power and Light Company

ATTN:

Mr. Lynn W. Eury

Executive Vice President

Power Supply

P. 0.

Box 1551

Raleigh,

NC 27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION

REPORT

NO. 50-400/91-13)

This refers to the inspection

conducted

by J.

Tedrow of this office on

May 18 - June

14,

1991.

The inspection

included

a review of activities

authorized for your Harris facility.

At the conclusion of the inspection,

the

findings were discussed

with those

members of your staff identified in the

enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Based

on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

We are concerned

about the violation because it involved

two inoperable auxiliary feedwater

system flow paths while operating

the plant

in the hot standby condition.

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions

taken

and any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10

CFR 2.790, of the

NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

9107260205

9}0627

PDR

ADOCK 05000400

0

PDR

ill

~I~O/

JUN 87 1991

Carolina

Power

and Light Company

The responses

directed

by this letter and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget as required

by the Paperwork

Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have any questions

concerning this letter, please

contact us.

Sincerely,

ORIGINAI. SIGNED

BY

r'AVlD M. VERRELU

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

cc w/encls:

R.

B. Richey, Vice President

Harris Nuclear Project

Box 165

New Hill, NC

27562

C. S. Hinnant

General

Manager

Harris Nuclear Plant

Box 165

New Hill, NC

27562

C. S. Olexik, Jr.,

Manager

Regulatory Compliance

Harris Nuclear Project

P. 0.

Box 165

New Hill, NC

27562

Mr. H.

Ray Starling

Manager - Legal Department

P. 0.

Box 1551

Raleigh,,

NC

27602

Dayne

H. Brown, Director

Division of Radiation Protection

N.

C. Department

of Environment,

Health

5 Natural

Resources

P. 0.

Box 27687

Raleigh,

NC

27611-7687

bcc w/encls:

(See

page

3)

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

0

. Carolina

Power and Light Company

bcc w/encls:

q D~o

ment Control

Desk

M Christensen,

RII

B. Mozafari,

NRR

NRC Resident

Inspector

U.S. Nuclear Regulatory

Commission

Route

1, Box 315B

New Hill, NC

27562

RII:

NGl a

an

06/PP/91

RII:DR

QChr>stensen

06/<+91