ACCELEIDITBD DI TRIBOTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

~\\

ACCESSION NBR: 9107120106 DOC. DATE: 91/07/05 NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION RICHEY,R.B.

Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET g

05000400 R

SUBJECT:

Forwards "Eddy Current Exam Steam Generators A,B 6 C."

DISTRIBUTION CODE:

A047D COPIES RECEIVED:LTR X ENCL SIZE:

TITLE: OR Submittal: Inservice Inspection/Testziig/Reli f=from ASME NOTES:Application for permit renewal filed.

p~~ /~~4 RECIPIENT COPIES ID CODE/NAME LTTR ENCL PD2-1 LA 1

0 MOZAFARI,B.

2 2

RECIPIENT ID CODE/NAME PD2-1 PD COPIES

-'TTR ENCL 1

1 I

g O'Q Code 05000400 INTERNAL: ACRS NRR/DET/ECMB 9H NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EXTERNAL EGGG BROWNi B NRC PDR 6

6 1

1 1

1 1

0 1

1 1

1 1

1 AEOD/DSP/TPAB NRR/DET/EMEB 7E OC/LFMB G-

~01 EGGG RANSOME,C NSIC 1

1 1

1 1

0 1

1 1

1 1

1 R

D NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISP) FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 19

D D

Carolina Power ttt Light Company P. O. Box 165 ~ New Hill,N. C. 27562 R. B. RICHEY Vice President Harris Nuclear Project FJUL 5

199)

Letter Number:

HO-910077 (0)

NRC 757 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50-400 N

LICENSE NO. NPF-63 SPECIAL REPORT STEAM GENERATOR TUBE IN-SERVICE INSPECTION RESULTS Gentlemen:

In accordance with Technical Specifications 4.4.5.5.b and 6.9.2 for the Shearon Harris Nuclear Power Plant, Unit No. 1, Carolina Power and Light Company hereby submits this Special Report.

This Special Report provides the results of the steam generator tube in-service inspections performed during the Harris Plant's third refueling outage in March and April 1991.

MGW:kjc Enclosure Very truly yours,

~H R. B. Richey Vice President Harris Nuclear Project cc:

Ms. B. L. Mozafari (NRR)

Mr. S.

D. Ebneter (NRC RII)

Mr. J.

E. Tedrow (NRC-SHNPP) 9>07<2010'10705 PDR ADOCK 05000400 0

PDR i

MEM/HO-9100770/1/OS1