ML18009A963

From kanterella
Jump to navigation Jump to search
Forwards Eddy Current Exam Steam Generators A,B & C, Inservice Insp Special Rept
ML18009A963
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/05/1991
From: Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18009A964 List:
References
HO-910077-(O), NUDOCS 9107120106
Download: ML18009A963 (3)


Text

ACCELEIDITBD DI TRIBOTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

~ \

ACCESSION NBR: 9107120106 DOC. DATE: 91/07/05 NOTARIZED: NO DOCKET g FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION RICHEY,R.B. Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) R

SUBJECT:

Forwards "Eddy Current Exam Steam Generators A,B 6 C." I DISTRIBUTION CODE: A047D TITLE: OR COPIES RECEIVED:LTR X ENCL Submittal: Inservice Inspection/Testziig/Reli f=from SIZE: g O'Q ASME Code NOTES:Application for permit renewal filed. 05000400 '

p~~ /~~4 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME -'TTR ENCL PD2-1 LA 1 0 PD2-1 PD 1 1 MOZAFARI,B. 2 2 INTERNAL: ACRS 6 6 AEOD/DSP/TPAB 1 1 NRR/DET/ECMB 9H 1 1 NRR/DET/EMEB 7E 1 1 NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB 1

1 1

1 0

1 OC/LFMB G- ~01 1 1

0 1

EXTERNAL EGGG BROWN i B 1 1 EGGG RANSOME,C 1 1 NRC PDR 1 1 NSIC 1 1 R

D D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISP) FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 19

D D Carolina Power ttt Light Company P. O. Box 165 ~ New Hill, N. C. 27562 R. B. RICHEY Vice President Harris Nuclear Project FJUL 5 199)

Letter Number: HO-910077 (0) NRC 757 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50-400 N LICENSE NO. NPF-63 SPECIAL REPORT STEAM GENERATOR TUBE IN-SERVICE INSPECTION RESULTS Gentlemen:

In accordance with Technical Specifications 4.4.5.5.b and 6.9.2 for the Shearon Harris Nuclear Power Plant, Unit No. 1, Carolina Power and Light Company hereby submits this Special Report. This Special Report provides the results of the steam generator tube in-service inspections performed during the Harris Plant's third refueling outage in March and April 1991.

Very truly yours,

~HR. B. Richey Vice President Harris Nuclear Project MGW:kjc Enclosure cc: Ms. B. L. Mozafari (NRR)

Mr. S. D. Ebneter (NRC RII)

Mr. J. E. Tedrow (NRC-SHNPP) 9 >07<2010'10705 PDR ADOCK 05000400 0 PDR i MEM/HO-9100770/1/OS1