ACCELERATED DIRIBUTION DEMONS~TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9104300331 DOC.DATE: 91/04/23 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION RICHEY,R.B.
Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET 05000400 R
SUBJECT:
Forwards 15-day special rept of steam generator tubes plugged during current inservice insp period.
DISTRIBUTION CODE:
A047D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: Inservice Inspection/Testing/Relief from ASME C
NOTES:Application for permit renewal filed.
ode 05000400 D
RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS NRR/DET/ECMB 9H NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EXTERNAL EGGG BROWN E B NRC PDR COPIES LTTR ENCL 1
0 2
2 6
6 1
1 1
1 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DSP/TPAB NRR/DET/EMEB 7E OC/LF RE EG&G RANSOME,C NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
0 1
1 1
1 1
1 D
D NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 19
r~~r f
Carolina Power & Light Company f
P. O. Box t65 ~ New Hill,N. C. 27562 R. B. RICHEY Vice President Harris Nuclear Project APR 2 3 1991 File Number:
SHF/10-13510 Letter Number'HO-910046 (0)
United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT Docket No. 50-400, License NPF-63 15 DAY SPECIAL REPORT Gentlemen:
Enclosed is a Special Report pursuant to Technical Specification 4.4.5.5.a.
which identifies the number of steam generator tubes plugged during the c'urrent Inservice Inspection period.
The complete results of the steam generator tube Inservice Inspection will be submitted within 12 months as required by Technical Specification 4.4.5.5.b.
Yours very truly, R. B. Richey Vice President Harris Nuclear Project MGW:mbr Enclosure cc:
Mr. R. A. Becker Mr. S.
D. Ebneter Mr. J.
D. Tedrow MEM/HO-9100460/1/OS4 r r.: - -. c,,r 9l04300331 910423 i: "~;.;.!O',
PDR ADOCK OS000e00 o
J g t ". P
~.i <
SPECIAL REPORT STEAM GENERATOR TUBE INSERVICE INSPECTION NUMBER OF TUBES PLUGGED Steam Generator.'
Current":
0 Cumulative:
15 Identifies steam generator tubes plugged for Inservice Inspection completed on April 12, 1991.
MEM/HO-9100460/3/OS4