Forwards Exam Rept 50-400/OL-91-01 Administered on 910122-25.Requests Response Detailing Corrective Actions Planned to Correct Ref Matl & Simulator Efficiency Concerns Re Exam Rept
ML18009A817
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/20/1991
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Eury L
CAROLINA POWER & LIGHT CO.
Shared Package
ML18009A818 List:
References
NUDOCS 9103050068
Download: ML18009A817 (4)


Text

February 20, 1991 Carolina Power and Light Company ATTN:

. Mr. Lynn W. Eury Executive Vice President Power Supply P.

O. Box 1551

Raleigh, NC 27602 Gentlemen:

SUBJECT:

SHEARON HARRIS EXAMINATIONREPORT NO. 50-400/OL-91-1 On January 22-25,

1991, the NRC -administered examinations to employees of your company who had applied for licenses to operate your Shearon Harris Nuclear Power Plant.

At the conclusion of the examination, the examination questions and preliminary findings were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

Copies of the written examination questions and answer key are included in this report as Enclosure 2.

Facility comments regarding the written examination are included in this report as Enclosure 3.

Enclosure 4 provides the NRC response and resolution to the facility comments.

Enclosure 5

summarizes simulator performance deficiencies observed during the conduct of the simulator portion of the operating examinations.

We are particularly concerned with your failure to provide adequate reference material.

This failure contributed to major rewriting of the examination.

Details are provided in the report.

We request that you

respond, in writing, to this office detailing the corrective actions that are planned to correct these reference material and simulator efficiency concerns.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this examination, please contact us.

Sincerely, (ORIGINAL SIGNED BY T. A.

PEEBLES FOR)

(cc w/encls:

See page 2)

Albert F. Gibson, Director Division of Reactor Safety 9>OSO5OOS8 p>Oaao PDR ADQCK 05000400 V

PDR p4fLQ,,$

Carolina Power and Light Co.

2 February 20,,1991

Enclosures:

1.

Examination Report No. 50-400/OL-91-01 2.

Examination and Answer Key (SRO)

(Document Control Room only) 3.

Facility Comments 4.

NRC Resolution of Facility Comments 5.

Simulation Facility Report cc/encls 1, 3, 4 and 5:

L. H. Martin, Manager-Nuclear Training Section C.

S. Hinnant,, Plant General Manager cc w/encls 1,

3, 4 and 5:

A.

W. Powell, Training Manager cc w/encl 1:

State of North Carolina bcc w/encl 1:

R. Becker, NRR H. Christensen, DRP J.

Tedrow, Senior Resident Inspector B. Holbrook, DRS R. Aiello, DRS J. Russell,

DRSP, Region V bc w/encls 1, 2, 3,

4 and 5:

C Public Document Room bcc w/encls 1, 3,

4 and 5:

T. Guilford, Sonalysts bcc w/encls 1 and 5:

Operator Licensing Branch, DLPQ:NRR

  • FOR PREVIOUS CONCURRENCE SEE ATTACHED COPY RII:DRS
  • RAiello 02/

/91 RIX:DRS

  • CCasto 02/

/91 RII:DRP

  • DVerrelli 02/ i4/91 RII: RS RII-'.D S Peebles Gibson 02( O /91 02/gy/91

Carolina Power and Light Co.

2 February 20, 1991

Enclosures:

1.

Examination Report No. 50-400/OL-91-01 2.

Examination and Answer Key (SRO)

(Document Control Room only)

Facility Comments NRC Resolution of Facility Comments Simulation Facility Report 3 ~

4.

5.

cc w/encl 1:

State of North Carolina cc/encls 1, 3, 4 and 5:-

L. H. Martin, Manager-Nuclear Training Sec ion C.

S. Hinnant, Plant General Manager cc w/encls 1, 3, 4 and 5:

A.

W. Powell, Training Manager bcc w/encl 1:

R. Becker, NRR H. Christensen, DRP J.

Tedrow, Senior Resident B. Holbrook, DRS R. Aiello, DRS J. Russell,

DRSP, Region bcc w/encls 1, 2, 3, 4

nd 5:

NRC Public Document Ro m

spector bcc w/encls 1, 3,

4 nd 5:

T. Guilford, Sonaly ts bcc w/encls 1 and 5:

Operator Licensi g Branch, DLPQ:NRR RII:D S RAi 6o (

02 1( /91 RII DRS

~c CCaKto 02/( L(/91 t

RII:DRP DVe rel i 02/ ~Q /91 RII:DRS TPeebles 02/

/91

4<

l'