ML18009A809

From kanterella
Jump to navigation Jump to search
Forwards Retyped Tech Spec Pages Re Cycle 4 Reload,Per 900919 & 910128 Ltrs
ML18009A809
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/18/1991
From: Floyd S
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18009A810 List:
References
NLS-91-049, NLS-91-49, NUDOCS 9102250168
Download: ML18009A809 (3)


Text

'

'CCELERATED.DIS RIBUTION DEMONST TION SYSTEM i

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9102250168 DOC.DATE: 91/02/18 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION FLOYD,S.D. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) 'R

SUBJECT:

Forwards retyped Tech Spec pages re Cycle 4 reload,per 900919 S 910128 ltrs.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution S

NOTES:Application for permit renewal filed. 05000400

/

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 D BECKER,D 2 2 INTERNAL: ACRS D 6 6 NRR/DET/ECMB 9H 1 1 NRR/DET/ESGB 1 1 NRR/DOEA/OTS B 1 1 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 1 0 OGC/HDS1 1 0 REG FI 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: NRC PDR NSIC 1 1 gD$ E.>fOn fy(P P J D'OTE D

D TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.'0079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR Pg 2+ ENCL

CNK Carolina Power 8 Light Company

'FEB 18 59)

SERIAL: NLS-91-049 United St:ates Nuclear Regulat:ory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 RETYPED TECHNICAL SPECIFICATION PAGES CYCLE 4 RELOAD Gentlemen:

By letters dated September 19, 1990 and January 28, 1991, Carolina Power 6 Light Company requested revisions to the Shearon Harris Nuclear Power Plant (SHNPP), Unit 1, Technical Specifications. These revisions concern changes in support of refueling and operations for SHNPP Cycle 4. Enclosure 1 provides the retyped, amendment bar pages for your convenience in issuance. of the proposed Technical Specification change.

Included with these retyped pages are two minor administrative corrections.

The first change corrects an error contained in Amendment 15, which inadvertently deleted a change issued in Amendment 13 to Section 6.9.2 concerning Special Reports. Based on additional NRC guidance, the second change removes a proposed reference which was to be contained in Section 6.9.1.6.2.e concerning methodologies used in the Core Operating Limits Report. Please refer any questions regarding this submittal to Mr. J. H. Eads at (919) 546-4165.

Yours very truly, S. D. Floyd Manager Nuclear Licensing Section SDF/lmr (cycle4) t'c:

Enclosure Mr. R. A. Becker Mr. S. D. Ebneter Mr. J. E. Tedrow eo 411 Fayettevilte Street o P. O. 8ox 1551 o Raleigh, N. C. 27502 9102250168 910218 PDR ADOCK 05000000 PDR

I" 1~

I