FORD
1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9102060089
DOC.DATE: 91/01/09
NOTARIZED: NO
FACIL:50-400 Shearon Harris Nuclear
Power Plant, Unit 1, Carolina
UTH.NAME
AUTHOR AFFILIATION
RELLI,D.M.
Region
2 (Post
820201)
ECIP.NAME
RECIPIENT'AFFILIATION
EURYIL.N.
Carolina Power
& Light Co.
SUBJECT:
Ack receipt of 901228
response
to violations noted in Insp
Rept 50-400/90-21.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR I'NCL 0
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Application for permit renewal filed.
DOCKET ¹
05000400
05000400
3
RECIPIENT
ID CODE/NAME
PD2-1
INTERNAL: ACRS
'EOD/DEIIB
DEDRO
NRR SHANKMAN,S
NRR/DOEA/OEAB
NRR/DRIS/DIR
NRR/PMAS/ILRB12
OE DIR
RE
F LE
0'XTERNAL:
EG&G/BRYCEiJ.H.
COPIES
LTTR ENCL
1
2
1
1
1
1
1
1
1
1
1
1
1
. RECIPIENT
ID CODE/NAME
BECKERgD
AEOD/TPAB,
NRR MORISSEAUgD
NRR/DLPQ/LPEB10
NRR/DREP/PEPB9D
NRR/DST/DIR 8E2
NUDOCS-ABSTRACT
OGC/HDS1
RGN2
FILE
01
NRC PDR
COPIES
LTTR ENCL
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
2+
Docket No. 50-400
License
No. NPF-63
Carolina
Power
and Light Company
ATTN:
Mr. Lynn W. Eury
Executive Vice President
Power Supply
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
REPORT
NO. 50-400/90-21
Thank you for your
response
of December
28,
1990 to our Notice of Violation
issued
on
November
30,
1990,
concerning activities
conducted
at your Harris
facility.
We have evaluated your responses
to violations
A and
B, and reviewed
your response
to violation C, in which. you did not agree with the Severity
Level IV, and stated your belief that
a Severity Level
V was more appropriate.
We have evaluated
the responses
to the violations cited above,
and found that
the responses
to violations
A and
B were satisfactory,
and after careful-review
of the circumstances
surrounding violation C,
we concur with your assessment
that this violation should
be
a Severity Level
V instead of a Severity Level
IV.
This is
based
on the fact that failure.to terminate
operator
licenses
within 30
days
upon termination of a licensed
operator is not
a significant
safety or environmental
issue.
Our records will be changed
accordingly.
The
responses
to violations A, B, and
C meet the requirements
and
we will examine the implementation of your corrective actions during future
inspections.
We appreciate
your cooperation in this matter.
Sincerely,
CRfQW4) gr;g~
OAYIQ pq sgepl'9
David M. Verre1 1 i, Chi ef
Reactor Projects
Branch
1
Division of Reactor Projects
CC:
R. B. Richey,
Manager
Harris Nuclear Project
Box 165
New Hill, NC
27562
(cc cont'd - see
page
2)
91 020h 0089
G
Cg 05000400
~quip)9
p'
0
Carolina
Power
and Light Company
JAN 09 199]
CC:
(Continued)
C. S. Minnant
Plant General
Manager
Harris Nuclear Project
Box 165
New Hill, NC
27562
C. S. Olexik, Jr., Director ..
Regulatory
Compliance
Harris Nuclear Project
P. 0.
Box 165
New Hill, NC
27562
Richard
E. Jones
General
Counsel
Carolina
Power
Im Light Company
P. 0.
Box 1551
Raleigh,
NC
27602
Dayne
H. Brown, Director
Division of Radiation Protection
N. C. Department of Environment,
Health
It Natural
Resources
P. 0.
Box 27687
Raleigh,
NC
27611-7687
bcc:
Document Control
Desk
G. Jenkins,
RII
T. Peebles,
RII
D. Verrelli, RII
H. Christensen,
RII
R. Becker,
NRC Resident
Inspector
U.S. Nuclear Regulatory
Commission
Route
1,
Box 315B
New Hill, NC
27562
'RI:D
P
NG asman
1/ >/91
RII: DRP
RII:D S-
HChristensen
T
les
1/ $ /91
1/
/91
RII:
en
s
1/g'/91
P~t