December 7,
1989 Docket No. 50-400 LICENSEE:
Carolina Power
& Light Company FACILITY:
Shearon Harris Nuclear Power Plant Unit 1
SUBJECT:
SUNf1ARY OF THE OCTOBER 12, 1989 MEETING REGARDING STEAM GENERATOR TUBE RUPTURE ANALYSIS A meeting was held with Carolina Power
& Light Company (CP&L) on October 12, 1989 in Rockville, HaryIand.
The purpose of the meeting was to discuss the steam generator tube rupture analysis for Shearon Harris Nuclear Power Plant, Unit 1 (Harris).
CP&L R. Prunty A. Stalker J.
Eads L. Costello NRC R. Becker K. Desai A. Gilbert G. West Presently, Harris has a plant specific steam generator tube rupture (SGTR) analysis reviewed and accepted with the condition that operator action times used in the analysis be verified by collecting and comparing to similar operator action times obtained from simulator exercises of SGTR events.
If the results of the simulator data are less conservative than those assumed for the current SGTR analysis, a revised analysis is to be resubmitted prior to startup from the current refueling outage.
In Hay, CP&L submitted the simulator operator action times which were less conservative than the assumed times, therefore, requiring the analysis to be resubmitted.
CP&L discussed the re-analysis with respect to content, schedule and areas which were changed.
From the new analysis of the SGTR event using simulator operator action times, CP&L concludes that no steam generator overfill wi 11 occur and offsite radiological doses are well within the acceptance criteria of the Standard Review Plan, Section 15.6.3.
and 10 CFR Part 100.
CC:
See next page 89i2i20i53 89i207 PDR ADOCK 05000400 P
PDC Orignal signed by:
R. A. Becker, Project t<anager Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation DP'e f t
~
NANE :
DATE:12/
W W
- dt en
/89 12/ 2//89 12/
WWWW'W 0
/89 OFFICIAL RECORD COPY Document Name:
SG ]
ll'l>,
h kl, II I li'k 'i h
JI hmh
~
l
~
4
. ~
4"
~ 4) / g
~
~ u4 t
4 h
I Ih 1
I M
k 4 4* ~
k I'I Ik I ~
4 1
1 hl II Ih
~
4 4
\\
ik h "ll I 4
~ I I '
Docket No. 50-400 LICENSEE:
Carolina Power
& Light Company FACILITY:
Shearon Harri s Unit 1
SUBJECT:
SUMMARY
OF THE NUCLEAR POWER PLANT OCTOBE 12, 1989 MEETING REGARDING STEAM GENERATOR TUBE R
TURE ANALYSIS A meeting was held with Carolina Power
& Light C mpany (CP&L) on October 12, 1989 in Rockville, Maryland.
The purpose of th meeting was to discuss the steam generator tube rupture analysis for She on Harris Nuclear Power Plant, Unit 1 (Harris).
CP&L NRC R. Prunty A. Stalker J.
Eads L. Costello R. Becker K. Desai A. Gilbert G. West Presently, Harris has a plant specifi steam generator tube rupture (SGTR) analysis reviewed and accepted with he condition that operator action times used in the analysis be verified by collecting and comparing to similar operator action times obtained fro simulator exercises of SGTR events.
If the results of the simulator data re less conservative than those assumed for the current SGTR analysis, a
evised analysis is to be resubmitted prior to startup from the current ref ling outage.
In May, CP&L submitted the si lator operator action times which were less conservative than the assumed times, therefore, requiring the analysis to be resubmitted.
CP&L discussed the re-analysis with respect to content, schedule and areas which were change From the new analysis of the SGTR event using simulator operator action
- mes, CP&L concludes that no steam generator overfill will occur and of site radiological doses are well within the acceptance criteria of t Standard Review Plan, Section 15.6.3.
and 10 CFR Part 100.
R. A. Becker, Project Manager Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation CC:
See next page C:PDI WWWW NAME :PAn DATE:12/
PDII-PDI I-1 l
RBecker:dt EAdensam 0
~
~
/89 12/
89 12/
/89 OFFICIAL RECORD COPY Document Name:
SG 1
I 1(
l" H
t l '
DISTRIBUTION
~F..
NRC PDR Local PDR T. Murley J. Sniezek E. Adensam P. Anderson R. Becker OGC E. Jordan K. Desai A. Gilbert G. West ACRS (10)