January 3, 1989 Docket No.
50-400 LICENSEE:
Carolina Power Ij'ight Company FACILITY:
Shearon Harris, Unit 1
SUMMARY
SUMMARY
OF DECEMBER 19, 1988 MEETING REGARDING LICENSING ACTIVITIES DISTRIBUTION bOO NRC PDR Local PDR PDI I-1 Reading E. Adensam P. Anderson R. Becker OGC E. Jordan (MNBB 3302)
B. Grimes (9A2)
ACRS (10)
R. Borchardt A meeting was held with Carolina Power and Light Company, on December 19,
- 1988, in Rockville, Maryland.
The purpose of the meeting was to discuss the status and schedule of licensing activities for Harris.
Enclosure 1 is the list of attendees at the meeting.
Enclosure 2 is a handout prepared and distributed by the licensee representing their tentative 18-month regulatory agenda for planning purposes.
Enclosure 3 was an additional licensee handout of a working schedule for their 18-month regulatory agenda.
The licensee discussed the items planned on their regulatory agenda, their prioritization and how the scheduling of the respective.items is being structured.
Both agenda and schedule are planning documents and subject to modifications as conditions and priorities change.
However, they provide a
good basis for pl,arming the future regulatory work load.
Enclosures:
As stated lS/
Richard A. Becker, Project Manager Project Directorate II-1 Division of Reactor Projects I/II CC:
See next page 890i090247 890i03 PDR ADOCK 05000400, P
Phd SH MTG
SUMMARY
- PM: D21:D R:D:
~ ~
NAME :RB w :E.
0 DATE:12/90/88: 12/
1' d nsam 0/88
~
~
~
~
OFFICIAL RECORD COPY pl 4
~Mr. E:
E. Utley Carolina Power 8 Light Company Shearon Harris CC:
Mr. R.
E. Jones, General Counsel Carolina Power 8 Light Company P. 0.
Box 1551
- Raleigh, North Carolina 27602 Mr. D.
E. Hollar Associate General Counsel Carolina Power 8 Light Company P.0.
Box 1551
- Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission Route 1,
Box 315B New Hill, North Carolina 27562 Mr. R. A. Watson Vice President Harris Nuclear Plant P.O.
Box 165 New Hill, North Carolina 27562 Ms. Carol Love 100 Park Drive P.O.
Box 12276 Research Triangle Park, NC 27709 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgia 30323 Mr. C.
S. Hinnant Plant General Manager Harris Nuclear Plant P.O.
Box 165 New Hi 11 North Carolina 27562 Mr. Dayne H. Brown, Chief Radiation Protection Section Division of Facility Services N.C. Department of Human Resources 701 Barbour Drive
- Raleigh, North Carolina 27603-2008
SHEARON HARRIS MEETING DECEMBER 19, 1988 10B13 LIST OF ATTENDEES ENCLOSURE 1
ATTENDEE R. A. Becker M. R. Oates J.
H.
Eads AFFILIATION NRC/NRR CPSL CPSL
12/56/88 CAROLIHA PONER 1 LIGHT COMPANY SHHPP 58-NOHTH REGULATORY AGENDA ENCLOSURE 2
PAGE FACTS r SITE PRI AGEHCY UHIT SOURCE DOCUNEHT ISSUE ACTIOH DUE AGEHCY DUE HLS RESPOHSIBLE DUE SITE GROUP INDIVIDUAL DATE REC'D 88G88$ 7 2
SITE REQUEST SHHPP 85/84/88 Z5A SHHPP-DELETE SRO REQUIRE.
FOR NGR-OPS TECH SPEC CHAHGE.
CPM. TO RESUBMIT TSC 87-55 (HLS-87-283)
REQUEST; ORIG IHAL SUBMITTED 1/4/88; PREHOTICE DATE 3/9/88.
TS 6.2 TURKAL 85/53/8'9 el/86/89 88G8854 4
" SITE REQUEST SHHPP Z5B SHXPP - RADIATIOX EFFLUEHT/EHVIROHMEHTAL TECH SPEC CHANGE A5NITIHG HRC ACTIOX.
HLS NOHITORIHG, RENOVAL OF TABLES FRON TS.
SUBMITTED 2/56/88 - HOT YET PRE5IOTICED.
TSC 87-84 CHLS88-834 DTD 2/56/88)
TS 3.3.3.58/3.55.5.5 TURKAL 85/35/89 88G8869 1
FUELS REQUEST SHHPP 5
Z5C SHMPP EHD OF LIFE MTC TSC 89-TECH.
SPEC.
CHANGE - FUELS IHITIATIHG HLS IH JAHUARY 5989.
HSD HHP EADS ZINMERNAH 85/86'/89 TIBBITTS 88G8878 4
FUELS REQUEST SHHPP Z1D SHHPP-IHCREASED EHRICMNEHT FUEL RECEIPT TECH.
SPEC.
CHAHGE - FUELS IHITIATIHG HLS TSC 89-IH JAHUARY 5989.
HSD HNP EADS 85/55/89 ZINNERNAH 85/A/9 TIBBITTS 88G8875 2
FUELS REQUEST SHHPP 5
Z5E SHHPP CYCLE 3 RELOAD TSC TSC 89-TECH.
SPEC.
CKAHGE.
FUELS IHITIATIHG HLS IH EARLY 5989.
HSD HHP EADS 83/85/89 ZINNERMAH 82/85/89 TIBBITTS
12/16/88 CAROLINA POMER E, LIGHT COMPANY SAXPP 18-NOHTH REGULATORY AGENDA
'PAGE 2.
FACTS 4 SITE AGEHCY PRI UNIT souRcE DocuNEHT ISSUE ACTIOH DUE AGENCY DUE HLS RESPOHSIBLE DUE SiTE GROUP IHDIVIDUAL DATE REC'D 88Gae26 2
QESTIXGHOUSE PROGRAN SHXPP e2/17/sa Z1F SHXPP-INPLENENT NRC PROGRAN FOR RENOVAL POTEHTIAL TECH SPEC CHANGEPRIORITY OF RHR AUTOCLOSURE INTERLOCK/HEATUP/
AHD SCHEDULE TO BE ESTABLISHED COOLDOMX CURVE REVISIOH CHAPLIH 88G8881 3
HED IRR 88-CST-888 SHXPP ea/e1/as z1G t
SHXPP XED PROGRAN TO IMPROVE RADIATIOH POTEHTIAL TECH SPEC CHANGE.
PROVIDE NOXITORIHG SYSTEN AHD RESOLVE ISOKIHETIC LICENSING SUPPORT TO PROGRAN.
EHSURE SANPLING PROBLENS LICEHSIHG REQUIRENEHTS COHTIHUE To BE NET.
TURKAL 81/16/89
- =
88G8865 3
SITE REQUEST SHXPP 1
Z1H SXXPP - RCS SPECIFIC ACTIVITY TSC 87-88 TS 3.4.8 POTEHTIAL TECH SPEC CHAHGE - LETTER IH HLS PREPARATIOH.
TURKAL 83/81/89 88G8824 2
CP&L LETl'ER SRZ To H.DEHTOX SNXPP-SUPPORT PLAHT EFFORT TO ELINIHATE POTENTIAL TECH SPEC CHANGE-<ETTER IH NLS SNNPP 1
(HLS-86-389)
CR ISOLATIOH REQUIRENENT FOR A CHLORIHE ROUTIHG.
ea/25/86 Z1I RELEASE ACCIDEHT OATES 88G8406 2
, SITE REQUEST SHXPP HRR 11/14/88 11 J SHXPPDELETIOX OF CHLORIHE DETECTION SYSTEN Tsc 88-816 TS 3.3.3.7 TECH. SPEC.
CHANGELEl'TER IH ROUTIHG NLS 12/6/88.
NED TURKAL OATES e1/e6/89 81/83/89
52/56/88 CAROLIHA POMER 6 LIGHT COHPAHY SHHPP 58-HOHTH REGULATORY AGEHDA PAGE 3
'ACTS 0
SITE PRI AGENCY UNIT SOURCE DOCUHEHT ISSUE ACTIOH RESPOHSIBLE GROUP INDIVIDUAL DUE AGENCY DUE HLS DUE SITE DATE REC'D sscsese SHHPP 1
gg< Qc (se) 4
~>s 'l2A CJ SHXPP-IST PROGRAH (XLS-88-254)
(97~F7 w II ~gabby)
AMAITIHG HRC ACTIOH.
HEED HRC POSITIOH HLS CLARIFICATION.
DATES 52/25/88 ssGse55 4
HLS-87-237 SHHPP If/69/87
)
g,/
~p
.Fi' Z2C SHXPP - GENERIC LETTER 87-89 TSC 87-86 Ts 3.e/4.8 TECH. SPEC.
CHANGE AMAITIHG HRC ACTION.
HLS RECOHHEHDED BY GEHERIC LETTER 87-89.
SUBMITTED 15/9/87 - HOT YET PREHOTICED.
TURKAL
()2/55/89 88Gse56 4
SITE REQUEST SHHPP Z2D SHHPP - ADHINISTRATIVECORRECTIOHS TSC 87-87 (HLS-87-257 DTD 52/57/88)
TS VARIOUS TECH SPEC C)IHGE AMAITIHG HRC ACTIOH.
NLS HAKES ADHIH. CORRECTIONS TO VARIOUS TECH SPECS.
SUBHITTED 52/57/87 - HOT YET PRENOTICED.
TURKAL
()5/35/89 88GBe64 4
sITE REQUEsT SHHPP e3/02/88 Z2E SHXPP - AFll HAIAL INITIATIOH TSC 87-53 TS 3.3.2 PREPARING EXVIROHHEHTAL ASSESSHEHT.
TURKAL 88G8e66 4
SITE REQUEST SHHPP Z2F SHXPP - LINITIHG COHDITIOHS FOR OPERATOR PREPARIHG EHVIRONHEHTAL ASSESSHEHT.
ACTIOH REQUIRElIENTS.
TSC 87-52 TS 3.5.2.2.3/3.5.2.4/3.7.5.5 HLS TURKAL 85/55/89
~ 12/$ 6/88 CAROLIHA POMER 6 LIGHT COMPANY SHXPP
$ 8-MOHTH REGULATORY AGENDA PAGE 4
~
FACTS
'ITE PRI AGEHCY UHIT SOURCE DOCUMEHT ISSUE
'CTIOH RESPOHSIBLE GROUP INDIVIDUAL C
DUE AGENCY DUE HLS DUE SITE DATE REC'D 88C8858 4
SITE REQUEST SNXPP 83/$ 8/88 Z2H SHXPP-COHT PENETRATION COXDUCTOR OVERCURREHT PROTECTION TEST TSC 88-52 TS 4.8.4.$
TECH.
SPEC CHAHGE.
TRANSMITTAL LETTER HLS IH PREPARATION.
TURKAL 05/3$ /89 88C8852 2
SNXPP HRR Z3A SNXPP-SUBMIT GOALS AND OBJECTIVES OF
$ 989 FULL SCALE EXERCISE TO HRC.
SUB)5ITTAL REQUIRED 75 DAYS PRIOR TO EXERCISE.
HLS HSD HSD CHAPLIH OATES BLACK 06/05/89 88G0568 2
HRC GENERIC LETTER 88-$ $
SHHPP 5
CHRC-88-448)
HRR 07/$ 2/88 Z3B SHXPP GENERIC LTR. 88-$ $ :
HRC POSITIOH OH RADIATIOH EMBRITTLEMENT OF REACTOR VESSEL MATERIALS 6 ITS IMPACT ON PLANT OPERATIOHS (EFFECTIVE DATE OF R.C.
$.99 REV. 2 MAS 5/3$ /88)
SUBMITTAL DATE EXTEHDED UHTIL
$ 88 DAYS XlS AFTER DATE OF GEHERIC LETTER.
AMAITIXC HHP HED/SITE IHPUT BASED OH HEM KEATUP 6 COOLDOMH CURVES BY BbM.
HED CHAPLIN NIHHANT GRAHT 0$ /06/89 52/19/88 BBG0484 3
HRC-88-774 SHHPP HRR 11/22/88 Z3C SNHPP " BULLETIH HO. 88-$ 8 HOHCOHFORMIHG MOLDED-CASE CIRCUIT BREAKERS HLS NXP PRESLEY HIXHAHT 84/0$ /89 03/$~9 88C0242 2
GL 88-$ 4 SHHPP HRR 08/08/88 Z3n SHHPP-GEHERIC LETTER H0.88-$ 4: IHSTRU-AMAITIHG PLAHT RESPONSE MENT AIR SUPPLY SYSTEM PROBLEMS AFFECTIHG SAFETY-RELATED EQUIPMENT HLS NHP PRESLEY 02/03/89 NIHHAHT 0$ /$ 3/89
12/$ 6/88 CAROLIHA POMER 4 LIGHT COHPAHY SHNPP 18-NOHTH REGULATORY AGEHDA
'PAGE 5
FACTS 4 SITE PRI AGENCY UHIT SOURCE DOCUHEHT ISSUE ACTION DUE AGEHCY DUE HLS RESPONSIBLE DUE SITE GROUP IHDIVIDUAL DATE REC'D 10/17/88 Z3E 88G0370 2
HRC-88-717 SHHPP HRR SHNPP-CHERIC LETTER 88-17; LOSS OF DECAY HEAT REHOVAL (10CFR 50.54(F)
LETTER IH PREPARATION.
PLAHT INPUT RECEIVED.
HLS HHP CHAPLIH 01/03/89 NIHXAHT 12/13/88 12/15/88 88G0323 3
SHNPP 1
HRR FR-88-089 06/21/88 Z3F SHHPP-STATIOH BLACKOUT RULE RESPOHSE EVALUATE REQUIREHEHT OF SBO RULE PER HUNRC 87-00.
RESPOHD USING HUHARC GEHERIC RESPONSE FORNAT NLS NED FLOYD BISHOP 03/
/89 02/15/89 88G03(8 SHHPP 1
HRR INSP.
REPORT 88-29 (IHCOMIHG HRC-88-704) 10/25/88 Z3N SHNPP-REG.GUIDE 1.97 RESPOHD TO UNRESOLVED ITEN 88-29-1 COHCERNING RCS HOT LEG AHD COLD LEG MATER TEHPERATURE IHDICATIOHS.
LETTER IH ROUTING.
HLS HSD TURKAL OATES 12/19/88 12/16/88 88G0273 2
CPKL LETTER (HLS-88-194)
SHHPP XRR 08/25/88 Z3I SHNPP SGTRSUBHIT RESULTS OF OPERATOR ACTIOH TINES FRON SINULATOR RUHS TO HRC MITNIN 30 DAYS OF THEIR COHPLETIOH.
HLS HNP HSD EADS TIBBITTS OATES ee/ei/89 es/
s 88G0218 2
CP&L LETTER; EURY TO DR.
GRACE SHNPP IE BULLETIH 88-02:
RAPIDLY SHNPP 1
(HLS-88-074)
PROPAGATIHG FATIGUE CRACKS IH S/G TUBES HRR 03/24/88 Z4A AMAITIHG HRC ACTIOH.
SUBHITTED REPORT HLS EADS DETAILIHG COHPLETIOH OF BULLETIH REQUIRE HSD OATES HEHTS OH 10/27/88.
HHP PUGH HNP VAH HETRE 10/28/88 ie/10/88 10/05/88
ENCLOSURE 3 SKNPP IB.NONIH REGVLA'TORT SCKEDVLE PAGE 1 OF C
ISSUE OEC JAN fEB HAR APR HAT JUN
'lA OEL.
SRO REOVIRE.
- SVPPLEH'EllTAL SUSHI ITAL
- PREPARE ISC
- ISSUE TSC I/e 8/I i/IS 18 RETS - REHQVAL OF TABLES fROH TS (TSC BF.OL)
I IS PRENOT ICE PREPARE TSC al(
- ISSVE ISC 1C ENO OF LIFE HTC (TSC 89 CPBL SVBlllTTAL PRENOT ICE PREPARE TSC ISSUE TSC TO INC. FUEL ENRICH.
CTCLE 3 (TSC 89-
)
CPBL SUSHI ITAL PRE NOT ICE
~Nya (5
4/I I/IS 8)IS ash)
PD (qP)
S/IS
- ~
t)P TE CTCLE 3 RE'LOAO TECH SPEC (TSC 89
)
CPBL SUSHI TTAL PRENOT ICE PREPARE TSC ISSUE TSC O/I SII
SNNPP 18.HONfll RECULAIORY SCHEDULE PACE 2 OF 4 PR I I SSUE OEC JAN FEB HAR APR HAY JUJ JUL AU S.P IF ROI RNR AUTOCL INTER(K/BEANS/COOLWN CURVE REV
- (PBL SUBHITTAL
- PRENOTICE
- PREPARE ISSUE IG ISONINETIC SAHPLINC PROGRAH (fOIENTIAL TSC)
CPBL SUBHITTAL
- PRENOTICE PREPARE TSC ISSUE TSC TH RCS SPECIFIC ACTIVITY (TSC 87.08)
- CPBL SUBHIT'fAL
- PRENOTICE
- PREPARE TSC
- ISSUE TSC IJ OELETION OF CHLORINE DET. STSI.
(TSC 88 016)
CPBL SUSHI ITAL PRENOT ICE PREPARE TSC ISSUE TSC 2A ISI PROCRAH (NLS 88.254 OTO NRC ISSUES CLARlfl(ATIONLTR INDI
PRI ISSUE'C JAN SNNPP 18.HOL'TN RECULATORT SCRIDULE JW FEN t~.
I PACE 3 OF A AF h ZC CEK. LTR. 67.09 (TSC 87.08)
PRENOTI CE
.0 20 AONINISTRATIVE CORRECTIONS (TSC 87-07)
- PRENOTICE
- PREPARE TSC ISSUE TSC ZE ARI IFANUAL INITIATION (TSC 67 13)
- CPSL SURNITTAL PRENOT ICE
- PREPARE TSC ISSUE TSC 2F LCO ACT~ REOUIREHENTS (TSC 67-12)
CPSL SQNITTAL PRENOI ICE PREPARE TSC
- ISSUE ISC 20 MOLDED CASE CIRCUIT BREAKERS (FSC 88.1Z)
CPSL SUSNITTAL
- PRENOT ICE
- PREPARE TSC
- ISSUE TSC
SNNPP 18.HONTH REGVLATORT SCNEOULE PAGE 4 OF 4
~
t PRt ISTVE AVG SEP OCT INNF OEC JAN FEB 3A SVBHI'F GOALS, OBJ 1989 EHERG EXER TO NRC
- CPSL SUNNITtAL 38 GL 88.11:
RAO. EHBRIT'ILEHENT (R.G. 1.99)
CPBL SUSHI TTAL 3C 8 88-1DT HGLOEO CASE CIRCUIT BREAKERS CPSL SUBHITTAL 30 GL 88 14l INSTALMENT AIR STSTEHS CPTL SUBHITTAL 3E GL 88 17l OECAT NEAT REHOVAL
- CPBL SSIITTAL 3F STATION BLACNOVT
- CPBL SUBHITTAL 3G SEVERE ACCIPENt IPE CPSL SUBHI TTAL 3H RG 1.97 t.HOT T.COLO CPBL SUBHITTAL Igta
\\
~
h
+
~
DISTRIBUTION FOR MEETING
SUMMARY
DATED: January 3,
1989 Cl Faci 1 ity:
Shearon Harri s
-,D k
R'1'RC PDR =
Local PDR PDI I-1 Reading T. Murley/J. Sniezek (12G18)
', D. Crutchfield (13A2)
S.
Varga (14E4)
E. Adensam P. Anderson R. Becker
, OGC E. Jordan (MNBB 3302)
B. Grimes 9A2)
ACRS (10)
R. Borchardt (17D19) cc:
Licensee/Applicant Service List
~
lg E
I V
~
V t I