ML18005A697

From kanterella
Jump to navigation Jump to search
Revised Notification of Significant Meeting in Region II Ofc on 881118 to Conduct Enforcement Conference on Security Problems as Facility
ML18005A697
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/01/1988
From: Fredrickson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8811100004
Download: ML18005A697 (3)


Text

ACCELERATED D FXKBUTION DEMON ATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8811100004 DOC.DATE: 88/11/01 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION FREDRICKSON,P.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION Region 2, Ofc of the Director DOCKET 05000400 R

8 05000400'i h

NOTES:Application for permit renewal filed.:

COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-1 LA RECIPIENT ID CODE/NAME BUCKLEY,B COPIES LTTR ENCL D

'D 8

~ INTERNAL: AEOD/DOA DEDRO

'RR/DREP/EPB 10 NU~P-~STRACT G

02 GN2 FILE Ol AEOD/DSP/TPAB NRR/DLPQ/QAB 10 NRR/PMAS/ILRB12 OGC/ROED RES/DSIR/EIB SUEGECT: Revised notification of significant meeting in Region II ofc on 881118 for encforcement conference re security problems.

1 DISTRIBUTION CODE:

IE45D COPIES RECEIVED:LTR 2 ENCL 8 SIZE:

TITLE: Summary of Significant Meeting with Licensee (Part 50)

EXTERNAL: LPDR NSIC NRC PDR D

S MHK 'IO ALL 'RIES" RZCIPIENIS'LEASE HELP US 1Q REDUCE HASTE.'GNZLCZ 9HE DOCUMEÃZ COWZROL DESK, RDCN Pl-37 (EZT. 20079)

KO ELTMZHATE YOUR KLME PRCH DIPI%KBUTIGN LIST8 B3R DO(XBKRZB mU DONPT MKDf TOTAL NUMBER OF COPIES REQUIRED:

LTTR 16 ENCL

~3

REVISED NOTICE OF SIGNIFICANT MEETING Name of Licensee:

Carolina Power and Light Company Name of Facility:

Shearon Harris Docket No.:

50-400 Date and Time of Meeting:

November 18,

1988, 10:00 a.m. - Rescheduled Location of Meeting:

NRC Region II Office, Atlanta, GA h

Purpose of Meeting:

Enforcement Conference to discuss a security problem at the Harris facility.

This meeting was previously scheduled for November 3, 1988.

NRC Attendees:

J.

P. Stohr, Acting Deputy Regional Administrator L. A. Reyes, Director, Division of Reactor Projects (DRP)

D.

M. Collins, Acting Director, Division of Radiation Safety and Safeguards (DRSS)

D.

M. Verrelli, Chief, Reactor Projects Branch 1, DRP W.

E. Cline, Chief, Nuclear Materials Safety and Safeguards

Branch, (NMSS),

DRSS D.

R. McGuire, Chief, Physical Security Section, NMSS G.

R. Jenkins, Director, Enforcement and Investigation Coordination Staff P.

E. Fredrickson, Chief, Projects Section lA, DRP Licensee Attendees:

R. A.

C.

S.

J.

W.

D. A.

Watson, Vice President, Harris Nuclear Plant Hinnant, Plant General Manager McCay, Manager, Engineering Support Braund, Supervisor, Plant Security Note:

Attendance by NRC Personnel at this NRC/Licensee meeting should be made known by 2:00 'p.m.,

November 10,

1988, via telephone call to P. Fredrickson FTS 242-5649.

Approved By:

. Fredric son, Section Chief Division of Reactor Projects Distribution:

J. Taylor, Deputy Executive Director for Regional Operations J.

Lieberman, Director, Office of Enforcement W.

M. Troskoski, Regional Coordinator, EDO E.

G. Adensam, Director, Directorate II-1 G.

C. Lainas, Asst. Director for Region II Reactors, NRR bcc:

(See page 2)

SSiii00004 SSiiOi PDR ADOCK 05000400 9

PDC

Notice of Significant Meeting NOV os t988 bcc:

C. Barth, OGC NRC Resident Inspector A. Upchurch, Chairman, Triangle J

Council of Governments DRS, Technical Assistant Document Control Desk RII RII RII RII RII RII Rl OCarroll:ser PFr ri kaon OV I relli

~Collins yes GJen ins J

ohr 10/gJ/88 10+op /88 10/I /88 10/gd88 Og(/88 10/8 [/88 / /) /88