Monthly Operating Rept for May 1988 for Harris Nuclear Plant Unit 1.W/880610 Ltr
ML18005A450
Person / Time
Site: Harris, Farley  Southern Nuclear icon.png
Issue date: 05/31/1988
From: Hale M, Watson R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CIVP-S-048, CIVP-S-48, HO-880119-(O), NUDOCS 8806130315
Download: ML18005A450 (9)


Text

"ACCELERATED DISTRIBUTION DEMONSTRGION SYSTEM I

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8806130315 DOC.DATE: 88/05/31 NOTARIZED: NO DOCKET g FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION HALE,M. Carolina Power & Light Co.

WATSON,R.A. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1988 for Harris Nuclear Plant R Unit 1.W/880610 ltr. I DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400 8 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A PD2-1 LA 1 0 PD2-1 PD 5 5 BUCKLEY,B 1 0 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 ARM TECH ADV 2 2 NRR/DLPQ/PEB 11 1 1 NRR/DOEA/EAB 11 1 1 NRR/DREP/RPB 10 1 1 NUDOCS-ABSTRACT 1 1 REG'I~ 01 1 1 RGN2 1 1 EXTERNAL: EG&G WILLIAMS,S 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 S'I D:'

~

D'OTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 29

DOCKET NO.: 050-400 UNIT: Harris Unit 1 DATE: May 1988 COMPLETED BY: Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a 100 percent Availability Factor for the month of April with a 101.14 percent capacity factor. There were two load reductions. Details are provided on the Unit Shutdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor and 0 spent fuel bundles in the Harris Unit 1 spent fuel pool and 52 new fuel assemblies in the new fuel pool.

t 8806130315>> 880531 --

PDR ADOCVi 05000400 R DCD MEM/DATAREPa/1/OSl

CPbL CQ AHT PERFORMANCE DATA SYS PAGE

,'ON DATE 06/01/88 OPERATING DATA REPORT RPD36-000 RUN, TINE 13: 26: 44 HARRIS UNIT 1 DOCKET NQ. 050-400 l COMPLETED BY NARK M. HAI E

'OPERATING STATUS TELEPHONE (919)362-2944 UNIT NAME: HARRIS UNIT NOTES I 2, REPORTING PERIOD: NAY 88 There are 157 fuel elements in the) 3~ LICENSED THERMAL POWER (NMT): 2775 Reactor Vessel, 0 elements in the I NAMEPLATE RATING <GROSS NWE): 950.9 Spent Fuel Pools and 52 new fuel

5. DESIGN ELECTRICAL RAT IHG < NET MME >: 900. 0 I assemblies in the new fuel pool.
6. NAX DEPENDABLE CAPACITY <GROSS NWE): 920.0 I 74 NAX DEPENDABLE CAPAClTY <NET MWE): 860.0
8. IF CHANGES OCCUR IH CAPACITY R*TXHGS ( ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: N/A POWER LEVEL TO WHICH RESTRICTED IF AHY <HET MME):gomE
10. REASONS FOR RESTRICTION IF ANY: N/A THIS YR TO CUNUL MONTH DATE ATIVE HOURS IN REPOR TING PERIOD 744.00 3647.00 9504.00 12 NUMBER OF HOURS REACTOR CRITICAL 744.00 3457.22 7907.11
13. REACTOR RESERVE SHUTDOWH HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 744.00 3445.42 7769.02
15. UNIT .RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEH. <NMH> 2056561.38 9468075.78 20618221..14
17. GROSS ELEC. ENERGY GEN. (NWH) 688531.00 3195147.00 6860365.00
18. HET ELEC. ENERGY GENERATED (MWH) 647117.00 2993539.00 6372368.00
19. UNIT SERVICE FACTOR 100.00 94.47 81.74
20. UHXT AVAII ABILITY FACTOR 100.00 94.47 81.74 21 UNIT CAP. FACTOR (USING NDC HET) 101.14 95.44 77.96

'2 UHIT CAP. FACTOR (USING DER NET) 96.64 91.20 74.50

'3.

UNIT FORCED OUTAGE RATE .00 5.53 8.32 24, SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACI-I ):

Refueling Outage July 16, 1988 8 weeks 25 IF SHUTDOWN AT END QF REPQRT PERIOD, ESTXNATED DATE OF START UP:

UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION>: FORECAST ACHIEVED INITIAL CRITICALITY INITlAL ELECTRICITY COMMERCIAL OPERATION 1.16 9 MEM/DATAREPa/2/OS1

k l,

II y

h k

'U I

CPA L CO ANT PERFORHANCE DATA SYS PAGE

'ON DATE 06/01/88 APPENDIX B AVERAGE DAILY POWE LEVEL RPD39-000 RUN TIHE 13:26:43 HARRIS UNIT DOCKET NO. e5e-40e COHPLETED BY HARK W. HALE TELEPHONE (919)362-2944 HAY DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (HWE-NET) ( HWg-NET )

881 872 882 880 20 870 868 879 871 860 870 24 872 .) 7 872 878 870 29 814 865 869 865 867 MEM/DATAREPa/3/0S1

UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO: 050 "400 UNIT NAME:. Herr I s DATE: 6/3/88 COMPLETED BY: M. W. Hale TELEPHONE: (919) 362-2944 REPORT MONTH: MAY 1988 R2 Method No Date Duration of Licensee System Component Cause Ii, Corrective (Hours) Shutting Event Code 4 Code 5 Action to Down Report S Prevent Recurrence Reactor 88-010 880524 N/A RC ZZZZZZ Load reduced to 97$ to perform core flux mapping. Flux mapping was completed and the unit was returned to full power, F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data 8-Maintenance or Tes. 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training lI, License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain ) Exhibit I - Same Source H-Other (Explain)

MEM/DATAREPa/4/OSI

UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO,: 050-400 UNIT NAME: Harris DATE: 6/3/88 COMPLETED BY: M.,W. Hale TELEPHONE: (919) 362-2944 REPORT MONTH: MAY 1988 Tl R Method Date Duration of Licensee System Component Cause (I, Corrective No. Y P (Hours) Shutting Event Code 4 Code 5 Action to e Down Report If Prevent Recurrence Reactor 88-011 880529 00 N/A HA VALVEX Load reduced to 70$ to perform turbine valve testing. The required tests were completed and the unit was returned to full power.

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training II License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)

ME M/DATAREPa/5/OS I

Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0. Box 165 New Hill, North Carolina 27562 Juw 10 1988 File Number'. SHF/10-15505 Letter Number: HO-880119 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF"63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specifications 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1988.

Yours very truly, R. A. Watson Vice President Harris Nuclear Project MWH:acm Enclosure cc'Dr. J. Nelson Grace (NRC)

Messrs. J. M. Taylor (NRC)

G. F. Maxwell (NRC-SHNPP)

R. G. Oehl (DOE)

MEM/MoOperRep/1/OS1

g, ll 4