Monthly Operating Rept for May 1988 for Harris Nuclear Plant Unit 1
ML18005A450
Person / Time
Site: Harris, Farley  
Issue date: 05/31/1988
From: Hale M, Watson R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CIVP-S-048, CIVP-S-48, HO-880119-(O), NUDOCS 8806130315
Download: ML18005A450 (9)


Text

"ACCELERATED DISTRIBUTION DEMONSTRGION SYSTEM I

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8806130315 DOC.DATE: 88/05/31 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.

Carolina Power

& Light Co.

WATSON,R.A.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET g

05000400

SUBJECT:

Monthly operating rept for May 1988 for Harris Nuclear Plant Unit 1.W/880610 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

R I

NOTES:Application for permit renewal filed.

05000400 8 RECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY,B INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR/DREP/RPB 10 REG'I~

01 EXTERNAL: EG&G WILLIAMS,S NRC PDR COPIES LTTR ENCL 1

0 1

0 10 10 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 LPDR NSIC COPIES LTTR ENCL 5

5 1

1 2

2 1

1 1

1 1

1 1

1 1

1 A

S'I

~

D:'

D'OTAL NUMBER OF COPIES REQUIRED:

LTTR 31 ENCL 29

DOCKET NO.:

050-400 UNIT:

Harris Unit 1

DATE:

May 1988 COMPLETED BY:

Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a

100 percent Availability Factor for the month of April with a 101.14 percent capacity factor.

There were two load reductions.

Details are provided on the Unit Shutdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor and 0 spent fuel bundles in the Harris Unit 1 spent fuel pool and 52 new fuel assemblies in the new fuel pool.

t 8806130315>> 880531 --

PDR ADOCVi 05000400 R

DCD MEM/DATAREPa/1/OSl

CPbL CQ

,'ON DATE 06/01/88 RUN, TINE 13: 26: 44 AHT PERFORMANCE DATA SYS OPERATING DATA REPORT HARRIS UNIT 1

PAGE RPD36-000 l

'OPERATING STATUS DOCKET NQ. 050-400 COMPLETED BY NARK M.

HAI E TELEPHONE (919)362-2944 2,

3 ~

5.

6.

7 4 8.

UNIT NAME:

HARRIS UNIT NOTES I

REPORTING PERIOD:

NAY 88 There are 157 fuel elements in the)

LICENSED THERMAL POWER (NMT): 2775 Reactor Vessel, 0 elements in the I

NAMEPLATE RATING

<GROSS NWE): 950.9 Spent Fuel Pools and 52 new fuel DESIGN ELECTRICAL RATIHG

< NET MME>: 900. 0 I assemblies in the new fuel pool.

NAX DEPENDABLE CAPACITY <GROSS NWE): 920.0 I

NAX DEPENDABLE CAPAClTY <NET MWE): 860.0 IF CHANGES OCCUR IH CAPACITY R*TXHGS

( ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS: N/A 10.

POWER LEVEL TO WHICH RESTRICTED IF AHY <HET MME):gomE REASONS FOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUNUL ATIVE 12 13.

14.

15.

16.

17.

18.

19.

20.

21

'2

'3.

24, HOURS IN REPOR TING PERIOD NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWH HRS HOURS GENERATOR ON LINE UNIT.RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GEH.

<NMH>

GROSS ELEC.

ENERGY GEN.

(NWH)

HET ELEC.

ENERGY GENERATED (MWH)

UNIT SERVICE FACTOR UHXT AVAIIABILITY FACTOR UNIT CAP.

FACTOR (USING NDC HET)

UHIT CAP.

FACTOR (USING DER NET)

UNIT FORCED OUTAGE RATE SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS 744.00 744.00

.00 744.00

.00 2056561.38 688531.00 647117.00 100.00 100.00 101.14 96.64

.00 (TYPE,

DATE, 3647.00 3457.22

.00 3445.42

.00 9468075.78 3195147.00 2993539.00 94.47 94.47 95.44 91.20 5.53 AND DURATION 9504.00 7907.11

.00 7769.02

.00 20618221..14 6860365.00 6372368.00 81.74 81.74 77.96 74.50 8.32 OF EACI-I):

Refueling Outage July 16, 1988 8 weeks 25 IF SHUTDOWN AT END QF REPQRT

PERIOD, ESTXNATED DATE OF START UP:

UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION>:

FORECAST ACHIEVED INITIAL CRITICALITY INITlAL ELECTRICITY COMMERCIAL OPERATION MEM/DATAREPa/2/OS1 1.16 9

k l,

II y h

k

'U I

CPA L CO ANT PERFORHANCE DATA SYS

'ON DATE 06/01/88 APPENDIX B AVERAGE DAILY POWE LEVEL RUN TIHE 13:26:43 HARRIS UNIT PAGE RPD39-000 HAY DAY AVG. DAILY POWER LEVEL (HWE-NET) 881 882 880 DOCKET NO. e5e-40e COHPLETED BY HARK W.

HALE TELEPHONE (919)362-2944 DAY AVG. DAILY POWER LEVEL

( HWg-NET )

872 879 871 870 20 24 870 868 860 872 872 870 869 867

.)7 29 878 814 865 865 MEM/DATAREPa/3/0S1

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: MAY 1988 DOCKET NO:

050 "400 UNIT NAME:.

Herr I s DATE:

6/3/88 COMPLETED BY: M. W. Hale TELEPHONE:

(919) 362-2944 No Date Duration (Hours)

R2 Method of Shutting Down Reactor Licensee Event Report S

System Code 4

Component Code 5

Cause Ii, Corrective Action to Prevent Recurrence 88-010 880524 N/A RC ZZZZZZ Load reduced to 97$ to perform core flux mapping.

Flux mapping was completed and the unit was returned to full power, F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain) 8-Maintenance or Tes.

C-Refueling D-Regulatory Restriction E-Operator Training lI, License Examination F-Administrative G-Operational Error (Explain

)

H-Other (Explain)

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Source MEM/DATAREPa/4/OSI

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: MAY 1988 DOCKET NO,:

050-400 UNIT NAME:

Harris DATE:

6/3/88 COMPLETED BY: M.,W. Hale TELEPHONE:

(919) 362-2944 No.

Date Tl Y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report If System Code 4

Component Code 5

Cause (I, Corrective Action to Prevent Recurrence 88-011 880529 00 N/A HA VALVEX Load reduced to 70$ to perform turbine valve testing.

The required tests were completed and the unit was returned to full power.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training II License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Source MEM/DATAREPa/5/OS I

Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0.

Box 165 New Hill, North Carolina 27562 Juw 10 1988 File Number'.

SHF/10-15505 Letter Number:

HO-880119 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, D.C.

20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF"63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specifications 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1988.

Yours very truly, R. A. Watson Vice President Harris Nuclear Project MWH:acm Enclosure cc'Dr. J. Nelson Grace (NRC)