ML18004A499

From kanterella
Jump to navigation Jump to search
Requests Denial of Util Request for Exemption from Requirement Under 10CFR50,App E to Conduct Full Participation Exercise of Emergency Response Plan within 1 Yr Before Beginning Commercial Operation
ML18004A499
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/27/1986
From: Gatton J, Standford R, Trevathan D
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8609020064
Download: ML18004A499 (10)


Text

REQUL QRY INFORMATION DISTRIBUTl A SYSTEN (R IDS)

ACCESSION NBR: 8609020064 DOC. DATE: 86/08/27 NOTARIZED:

NQ DOCKET FACIL:50-400 Sheav on Hav v'is Nuc leav Power Plant.

Unit 1.

Cav olina 05000400 AUTH. NANE AUTHOR AFFILIATION TREVATHAN>D.

Affiliation Not Assigned QAl TQN, J.

Affiliation Not Assigned STANDFORDi R.

Affiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION DENTONi H. R.

Office of Nucleav Reactor Regulation.

Directov (post 851125

SUBJECT:

Requests denial of util request fov exemption from v equirement undev 10CFR50i App E to conduct full pav'tie ipation exev'ci se of emergency v'esponse plan within 1

gr befov e beginning commev cial opev'ation.

DISTRIBUTION CODE:

YE03D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: Request fov NRR Action (e. g.

2. 206 Petitions) 4 Related Corv espondenc NOTES: Application for permit v enewal +iled.

05000400 RECIPIENT ID CODE/NANE PNR-A PD2 LA BUCKLEY, B 01 COPIES LTTR ENCL RECIPIENT ID CODE/NANE PWR-A PD2 PD COP IES LTTR ENCL INTERNAL: EDO/ACB ELD/RED ELD/HDS1 NRR DIR EXTERNAL: LPDR NSI C 03 05 NRC PDR 02 TOTAL NUNBER OF COPIES REQUIRED:

LTTR 1

ENCL 11

, ~

jli j

i 1

.,a.

1't j

t'i j

3 Dear Mr. Denton..-.

I, I wish to urge denial of CPSL's request for exemption from the requirement~.ader 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency

Response

Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

V Sincerely, 8609020064 860827 PDR ADOCK 05000400 PDR

'I

~

0 ~ P

~

~

~ ')

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, A

endix E, that the Company conduct a full Appen xx Res onse par i rticipation exercise of the Emergency e

p Pl for its Shearon Harris nuclear power plant an within one year before beginning commerci'al operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, c

Q~(

t

s(gr/g,

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50;"

Appendix E, that the Company conduct a full participation exercise of the 'Emergency

Response

Plan for its Shearon Harris nuclear power plant

<)

within one year before beginning commercial operation of the plant or before'operating at greater than"five percent of rated power.

Because of the need for changes in the evacua-.

tion plan, I believe this exercise should be-conducted before the plant is permitted to operate at all.

P:

s/a~/gq

Dear Mr. Denton:

I wish to urge denial of CPS.L's request for exemption from the requirement, under

)0 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency

Response

Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

I.

la lg M

II'

'b 4

p Deyr Mr. Denton:

~7 I wish to urge denial of CPBL's request for exemption from the requirement, urtder 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency

Response

Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

~

Sincerely, 4

Deyr Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency

Response

Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,