Urges Denial of Util Request for Exemption from 10CFR50,App E to Conduct Full Participation Exercise of Emergency Response Plan within 1 Yr Before Commercial Operation. Exercise Should Be Conducted Before Plant Operates
ML18004A498
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/02/1986
From: Payne L
AFFILIATION NOT ASSIGNED
To: Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8609020040
Download: ML18004A498 (4)


Text

REQUL.=

RY INFORNATION DISTRIBUTI SYSTEl'1

( R IDS)

ACCESSION NOR: 8609020040 DOC. DATE: 86/09/02 NOTARIZED:

NO DOCKET I FACIL:50-400 Bhearon Harris Nuclear Power Plant>

Unit 1> Carolina 05000400 AUTH. NANE AUTHOR AFFILIATION PAYNE> L. H.

Affiliation Not Assigned BEG IP. NAi'iE REClPIENT AFFILIATION DENTON OFFice of Nuclear Reactor Regulation>

Director <post 851125

SUBJECT:

Urges denial of util request for exemption from 10CFR50>*pp E to conduct full participation exercise of emergency plan (within 1 gr before commercial operation. Exerci se should be conducted before plant oeprates.

DISTRIBUTION CODE:

YEOSD COPIEE RECEIVED: LTR I ENCL g SIZE:

TITLE: Regoest for NRR Action

<e. g.

2. 206 Petitions)

I< Related Co"respondenc NOTES: Application for permit renewal Filed.

05000400 RECIPIENT ID CODE/NAi'IE PNR-A PD2 LA 9UCKLEY> 9 01 INTERNAL: EDO/ACD ELD/RED 04 COP IEB LTTR ENCL RECIPIENT ID CODE/NANE PNR-A PD2 PD ELD/HDB1 NRR DIR COPIEB LTTR ENCL EXTERNAL: LPDR NBlC 03 05 NRC PDR 02 TOTAL NUi')HER Ol= COPIEB REQUIRED:

LTTR 11 ENCL

0 li 1

f e,

t H

I "I

PI I

A

',i <r

~'"

I'

~t

"\\

.t E

F Ps

)l

'v

SeoeOZ00ao 8S0eoZ PDR ADOCK 05000400 PDR I

I

  • ~g.c Dear Mr. "'Dent.on

$o- (ce I wish to urge.denia'1 of CPSL's request for exemption from the~ requirement, under 10 CFR 50, Appendix E, that".the

.Company conduct a full participation exercise of the Emergency

Response

Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, J