ML18004A445

From kanterella
Jump to navigation Jump to search
Opposes Util Request for Exemption from full-scale Evacuation Plan Drill
ML18004A445
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/02/1986
From: Blanton P
AFFILIATION NOT ASSIGNED
To: Harold Denton
NRC
References
NUDOCS 8608130106
Download: ML18004A445 (4)


Text

REQUL RY INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSIQN NBR: 8608130i06 DOC. DATE: 86/08/02 NOTARIZED:

NO FACIL:50-400 Sheav on Hav v is Nuc1eav Power Planti Unit i.

Cav olina AUTH, NANE AUTHOR AFFILIATION BLANTON,P. J.

AffiliationNot Assigned REC IP. NANE RECIPIENT AFFILIATIQN DENTQN> H.

NRC No Detailed AffiliationGiven DOCKET 0 05000400

SUBJECT:

Opposes util v equest fov exemption fv om Pull-scale evacuation p lan dv'i 1 l.

DISTRIBUTION CODE YE03D COPIES RECEIVED: LTR ENCL SI ZE:

TITLE: Request fov NRR Action (e. g.

2. 206 Petitions) h Related Corv espondenc NOTES: Application fov permit v enewal fi 1 ed.

05000400 RECIPIENT ID CODE/NANE PNR-A PD2 LA BUCNLEY, B Oi COPIES LTTR ENCL RECIPIENT ID CODE/NAI'fE PWR-* PD2 PD COPIES LTTR ENCL INTERNAL: EDO/ACB ELDLBED L

EXTERNAL: LPDR NSIC 04 03 05 ELD/HDSi NRR DIR NRC PDR 02 TOTAL NUBBER OF COPIES REQUIRED:

LTTR ii ENCL

I <<,

l-

~ 'L

'4 I

I

)I

<<,it.i l I

f I

W ~

i

~ I I

,I I,<<

k) I I

I f'

<<<<Qt I "',;)

lg,")

4$

),I

)

gk, ft'I/ I 'g P

t 4l:",." J g w Wtl I ) P I

",'~t/

l i I'$jl" '

II yf<<

4 ',4 Iif Q; l tl k tffiqf t

,4 I " )f f J&fW

'I',4 I

I l"'j,~ff i,'.i >'>

I.

ig Qf t

I

$ /4,

/It I't "k

I II ~II tt ~

'5 "

Y'(

v (;

fI

~

I 4

I f

Harold Denton U.S. Nuclear Regulatory Commission 1717 H Street NN Nashington, DC 20555

Dear Nr. Denton:

8/2/1986 CPa8L has sent a request to the Nuclear Regulatory Commission asking that they be exempted from a full-scale evacuation plan drill, which is normally required before a

nuclear power plant may open.

They have asked that a

decision be made by August 10.

I feel that at. the very

least, CP8cL should be required to test the emergency evacuation plan they have been assuring us is adequate, especially in light of the many questions raised by citizens of Chatham and the surrounding counties concerning the plan.

In particular, the descriptions of the test run of the plan, as reported by those who participated in it, strongly contradict the evaluation that

CPZcL, among others, have placed upon it.

I urge that you fulfillthe spirit as well as the letter of your mandate, and require that CP5L have a ful1 participation drill for the Shearon Harris emergency evacuation plan.

Thank you.

Sincerely, Patricia D. Blanton PO Box 545 Pittsboro, NC 27312 8608130106 860802 PDR ADOCK 05000400 H

)PDR

"C