Requests Denial of Exemption for Util to Test Evacuation Plan Prior to 5% Testing of Plant Due to Growth of Population in Raleigh,Nc Area.No Evacuation Plan Seems Feasible Due to Insufficient Planning & Lack of Cooperation
ML18004A373
Person / Time
Site: Harris 
Issue date: 07/29/1986
From: Chestnut G, Chestnut W
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8608050069
Download: ML18004A373 (4)


Text

REQULAT

~ INFORNATION DISTRIBUTI0 YSTEi't

( R IDS)

ACCESSION NBR: 8608050069 DOC. DATE: 86/07/29'QTAR IZED:

NQ DOCNET FACIL: 50-400 Sheav'on Hav v'is Nuclear Power Plant>

Unit 1>

Cav olina 05000400 AUTH. NANE AUTHOR AFFILIATION CHESTNUT> N.

Affilxation Not Assigned CHESTNUT, ('.

Affiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION DENTON> H.

Qffice of Nucleav Reactor Regulation.

Div ec tov (post 851125

SUBJECT:

Requests denial of exemption fov util to test evacuation p lan pv'i ov to 5/ testing of p lant due to growth of population in Raleigh> NC area.

No evacuation plan seems feasible due to insufficient planning 8r lack of coopev'ation.

DISTRIBUTION CODE:

YEOSD COPIES RECEIVED: LTR t

ENCL 0 SIZE:

TITLE: Request fov NRR Action (e. g.

2. 206 Petitions) 8c Related Cov v espondenc NOTES: Application for permit reneual filed.

05000400 RECIPIENT ID CODE/NANE PMR-A PD2 LA BUCNLEY> 9 01 INTERNAL: EDO/ACB ELD/RED 04 COPIEB LTTR ENCL RECIPIENT ID CODE/NAi~lE PWR-A PD2 PD ELD/HDBi NRR DIR COPIES LTTR ENCL EXTERNAL: LPDR NBIC 03 05 NRC PDR 02 TOTAL NUNBER OF COPIEB REQUIRED:

LTTR 1 i ENCL

++'

,t

~"

'.i C

Nr.

Har old Denton Nuclear Regulator y Cornrni sion Washington, DC July 29, 1986

Dear Nr Dent or>,

It ha's coNe to oui a' tent 1 o'n that Cal ol i'na Powel 8

Light has r equested an exempt ion from a Federal r equir ernent as specified in 18 CFR, part 56, as it applies to its Shear'on Harr is nuclear power plant.

Ny understanding is that this requires that the utility (CP8L) participate in a

full-scale evacuation dr ill within one year of fuel-loading.

Since the last such test of the evacuation plan was per for rned in May,

1985, over one year has elapsed and the ut i 1 ity has st i 1 1 not begun even 5/

test ing of the Shear on Harr is plant.

As a r esident of Durham county, NC, we request that you deny this request for exemption based on this

fact, as well as a

recent newspaper article (Raleigh News and Obser ver, July 27, 1986 page F1) that states "Raleigh growth spreads to the southwest".

This is directly towar ds the Shear on Harr is plant.

Sirice the nuclear plant is estimated to be in operation for 38 years, the subsequent gr owth of Raleigh alone has riot been adequately taken into account by the utility. Insufficierit plannirig arid a lack of cooperation of local officials make it doubtful that any current evacuation plan is

feasible, and we ask that this request for exemption be deriied.

Sincer ely; William 8 Blenna Chestnut 3 Burbank Circle Dur harn, NC 27713 8608056069 Sb072'V PDR ADOCK 05000400 H