ML18004A281
| ML18004A281 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 07/08/1986 |
| From: | Denise Wallace AFFILIATION NOT ASSIGNED |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8607080096 | |
| Download: ML18004A281 (4) | |
Text
1 REC ORY INFORMATION DISTRIBU N SYSTEM (RIDS>
ACCESSION NBR: 8~0708009'6 'OC. DATE 86/07/08 NOTAR1ZED:
NO 'OCKET 0 FACIL:50-400 Bhearon Harris Nuclear Power Plant>
Unit i> Carolina 05000400 AUTH. NANE AUTHOR AFFILIATION MALLACE>D.
Affxliation Not Assigned RECXP. NANE RECXPXENT AFFILIATION DENTON> H. R.
Office of Nuclear Reactor Regulation>
Director (post 85ii25
SUBJECT:
Requests that issue of state h local govt participation in emergency plan for facility be fully resolved before exemption from requirement of full participation test within i gr of granting full power OL approved.
DISTRIBUTION CODE:
YEOSD COPIES RECEIVED: LTR j ENCL 0 SIZE:
TITLE: Request for NRR Action (e. g.
- 2. 206 Petitions)
Zc Related Correspondenc NOTES: App 1icati on for permit renewal filed.
05000400 RECIPIENT XD CODE/NANE PMR-A PD2 LA 9UCKLEY> 8 Oi COPXES LTTR ENCL i
RECIP IENT ID CODE/MANE P4lR-A PD2 PD COPIES LTTR ENCL INTERNAL:
ELD EXTERNAL: LPDR NBIC 04 03 05 i
i i
i ii i
)0 TOTAL NUHBER OF. COPIES REQUIRED:
LTTR Q
ENCL
>>inc tete 6.~.L4 Ef Qgtk(,P f
)XCQfgOLJ f,Ol i g f r'f" ~
flan'tfntii~g
);t>L lgf$Q v)r 5'.s Pl)
( i 0
+~'qQp $ 6$ za x <'>Ua )
fyggglfLIf (,(~DE:
gf.(>
~'>'~
C<'" yFB b~CEIAED: f"LP EK('.
og dpi'ug, uB
(,ni
'i.a6<,
Of ebk.r.~in6ci t> crtzb a~'
(j u<~,i.t Q)>xsrv>>; lif. es, gnat y b~~
~ xr z,"~.f 4N<".(),. )f >i
}i) rig f ('k>>
gc1r,c ~ xiii P 6 tn i T.II ~rii~i) F/s<.,<;
Pfu< tl"i'..3:
Hrdn< i"~
0'<'-'f '.~">>~
~"
-+'3+6 d T4<- f <<~'+
l
('l4: ~i
>> r. 4 ls <
HL('<h<! tf>
~,'>!
f 1< Jl
~'"s
~~"i l > l f0f$ l 't l S f J j)Qp~) Jt)QR g
jp
~
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 (301) 492-7000 5
g
Subject:
Shearon Harris nuclear plant, Carolina Power 6 Fight, Emergency Plan
Dear Mr. Denton,
Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal x'egulation, 10 CFR Part 50.
This is most significant since Chatham
- County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
- Thus, no plan which could actually be implemented if the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawing from the px'esent emergency plan.
- Clearly, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
full'articipation test within one year prior to the granting of any full power license should be considered or approved.
Sincerely, 86070800'Pb 86'D7'D>
PDR ADOCK 05000400 H
PDR"
4
~