Requests That Issue of State & Local Govt Participation in Emergency Plan for Facility Be Fully Resolved Before Exemption from Requirement of Full Participation Test within 1 Yr of Granting Full Power OL Approved
ML18004A281
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/08/1986
From: Denise Wallace
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8607080096
Download: ML18004A281 (4)


Text

1 REC ORY INFORMATION DISTRIBU N SYSTEM (RIDS>

ACCESSION NBR: 8~0708009'6 'OC. DATE 86/07/08 NOTAR1ZED: NO Unit

'OCKET 0 FACIL: 50-400 Bhearon Harris Nuclear Power Plant> i> Carolina 05000400 AUTH. NANE AUTHOR AFFILIATION MALLACE>D. Affxliation Not Assigned RECXP. NANE RECXPXENT AFFILIATION DENTON> H. R. Office of Nuclear Reactor Regulation> Director (post 85ii25

SUBJECT:

Requests that issue of state h local govt participation in emergency plan for facility be fully resolved before exemption from requirement of full participation test within i gr of granting full power OL approved.

DISTRIBUTION CODE: YEOSD COPIES RECEIVED: LTR TITLE: Request for NRR Action (e. g. 2. 206 j ENCL 0 SIZE:

Petitions) Zc Related Correspondenc NOTES: App 1icati on for permit renewal f i l ed. 05000400 RECIPIENT COPXES RECIP I ENT COPIES XD CODE/NANE LTTR ENCL ID CODE/MANE LTTR ENCL PMR-A PD2 LA i P4lR-A PD2 PD 9UCKLEY> 8 Oi INTERNAL: ELD/HDBi ELD i i NRR DIR 04 i i EXTERNAL: LPDR 03 i NRC PDR 02 NBIC 05 i i

)0 TOTAL NUHBER OF. COPIES REQUIRED: LTTR Q ENCL

>>inc tete 6.~.L4 Ef Qgtk(,P f

)XCQfgOLJ f,Ol i g f r'f" ~ flan'tfntii~g );t>L lgf$ Q v)r 5'.s Pl) ( i 0 +~'qQp $ 6$ za x <'>Ua )

fyggglfLIf (,(~DE: gf.(> ~ '>'~ C<'" yFB b~CEIAED: f"LP " EK('.

og dpi'ug, uB (,ni 'i .a6<, < Of ebk.r.~in6ci t> crtzb a~' (j u<~,i.t Q)>xsrv>>; lif. es, gnat y b~~ ~ xr z,"~.f 4N<".(),. )f >i }i ) rig f ('k>> gc1r,c ~ xiii P 6 tn i T.II ~rii~i) F/s<.,<;

Pfu< tl"i'..3: Hrdn< i"~ 0'<'-'f '.~">>~ ~" -+'3+6 d T4<- f <<~'+ l

('l4: ~i >> r. 4 ls <

HL('<h<! tf> ~,'>!

~'"s f 1< Jl

~~"i l > l f0f$ l 't l S f J j) Qp~) Jt)QR jp ~

g

Mr. Harold Denton g Director, Office of Nuclear 5 Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (301) 492-7000

Subject:

Shearon Harris nuclear plant, Carolina Power 6 Fight, Emergency Plan

Dear Mr. Denton,

Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal x'egulation, 10 CFR Part 50.

This is most significant since Chatham County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan. Thus, no plan which could actually be implemented if the plant were to operate has been tested.

In addition, citizens and officials in other counties are considering withdrawing from the px'esent emergency plan.

Clearly, any such action would further complicate this matter.

At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a full'articipation test within one year prior to the granting of any full power license should be considered or approved.