REQULAT INFORNATION DISTRIBUTION ~YSTEN (RIDS)
ACCESSION NBR: 8606200165 DOC. DATE: 86/06/17 NOTARIZED:
NO DOCKET ¹ FACIL: 50-400 Shearon Harris Nuclear PoIaer Plant>
Unit li Car olina 05000400 AUTH. NAl'1E AUTHOR AFFILIATION JANE4lAYp B.
Affiliation Not Assigned NABASAN>D. C.
Affi 1 iation Not Assigned KELENENi S.
Affiliation Not Assigned RECIP. NANE
-RECIPIENT AFFILIATION DENTONp H. R.
Office of Nuclear Reactor Regulationi Director (post 851125
SUBJECT:
Requests that no applicant exemption from requirement o+
emergency plan full participant test within 1 gr prior to granting full potoer OL should be considered until state local govt participation fully resolved.
DIBTRIDUTION CODE:
YEOBD COPIEB RECEIVED: LTR l
ENCL 0 BIZE:,
TITLE: Request for NRR Action (e. g.
- 2. 206 Petitions) 8r Related Correspondenc NOTES: Application for permit renewal 0iled.
05000400 RECIPIENT ID CODE/NANE Pb)R-A PD2 LA BUCKLEY B Ol INTERNAL:
ELD/RED 04 COPIES LTTR ENCL RECIP I ENT ID CODE/NANE PMR-A PD2 PD ELD/HDSi NRR DIR COPIEB LTTR ENCL EXTERNAL: LPDR NSIC 03 05 NRC PDR 02 Q
TOTAL NUNBER OP COPIEB REQUIRED:
LTTR ~
ENCL
+I
\\ =
V>~
t I
'V
$ 0 Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 (301) 492-7000
Subject:
Shearon Harris nuclear plant, Carolina Power
& Tight, Emergency Plan
Dear Mr. Denton,
Carolina Power
& Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CPR Part 50.
This is most significant since Chatham
- County, by formal action of the. Board of Commissioners, has withdrawn from the emergency plan.
- Thus, no plan which could actually be implemented if the plant were to operate has been tested.
Zn addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
- Clearly, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
full participation test within one year prior to the granting of any full power license should be considered or approved.
Sincerely, 8606200165 860617'DR
- DOCK 05000400 H
PDR J
6 5am 3,
'Pit[@~~
Ac 273I2
DIPLOMATE AhlERICAN BOARD OF INTERNALMEDICINE DENNIS C. KABASAN,M. D.
INTERNALMEDICINE 1951 SouTH HORNER BLVD.
SANFORD, N. C. 27330 OFFICE (919) 774-4123 June 15, 1986 Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Re:
Shearon Harris nuclear plant Carolina Power
& Light Emergency Plan
Dear Mr. Denton:
Carolina Power
& Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation 10 CFR Part 50.
This is most significant since Chatham County by formal action of the Board of Commissioners has withdrawn from the emergency plan.
Thus no plan which could actually be implemented if the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
- Clearly, any such action would further, complicate this matter.
We of Lee County are very concerned about this present situation.
From my perspective as a physician in Sanford and Lee County, the lack of a functioning, well thought out emergency plan in the event of a nuclear plant accident is the epitome of irresponsible behavior.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemptions from the requirement of a full participation test within one year prior to the granting of any full power license should be considered or approved.
Most sincerely, Dennis C. Kabasan, M.D.
4=
c t
r g
U
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation
.U.S. Nuclear Regulatory Commission Washington, D.C.
20555 (301) 492-7000
Subject:
Shearon Harris nuclear plant, Carolina Power 6 Light, Emergency Plan
Dear Mr. Denton,
Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CFR Part 50.
This is most significant since Chatham
- County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
- Thus, no plan which could actually be implemented if the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
- Clearly, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
full participation test within one year prior to the granting of any full power license should be considered or approved.
Sincerely,
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comm1ssion Washington, D.C.
20555 (301) 492-7000
Subject:
Shearon Harr1s nuclear plant, Carolina Power
& Light, Emergency Plan
Dear Mr. Denton,
Carolina Power
& Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CFR Part 50.
This is most s1gnificant since Chatham
- County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
- Thus, no plan which could actually be implemented if the plant were to operate has been tested.
Zn addition, citizens and officials in other counties are 4 M~<<4
~.
4 JtiD
. 4<<r C<<
4 1
<<ss
~
4
<<~<<re<<
<<1~ ~
Uoiivadii.siig hw s iiui.onJiig
- i. a Qm i he pi. cau~ni
~wavi. ysi1vy yi ii ~
- Clearly, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
full participation test within one year prior to the granting of any full power license should be considered or approved.
Sincerely,