ML18003B340

From kanterella
Jump to navigation Jump to search
Opposes Util Exemption from Requirement of Full Participation Emergency Plan Test within 1 Yr Prior to OL Issuance
ML18003B340
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/11/1986
From: Carr G
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8606160139
Download: ML18003B340 (4)


Text

REQ ATORY INFQRNATION DISTRIB IQN SYSTEN {RIDS) j ACCESSION NBR: 8606160139 DOC. DATE: 86/06/11 NOTARIZED:

NO DOCKET FAC)L: 50-400 Sheav on Hav v is Nuclear Pouer Planti Unit ii Cav olina 05000400 AUQH. NANE AUTHOR AFFILIATION CARRY l'. W.

AffiliationNot Assigned RECIP. NANE RECIPIENT AFFILIATION DENTONp H.

Office of Nuclear Reactov Regulation>

Direc tov

<post 851 125j

SUBJECT:

Opposes exemption from v equirement of full pav ticipation emergency plan test within 1 gr pv'iov'o QL issuance.

DISTRIBUTION CODE:

YE03D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: Request

+or NRR Action (e. g.

2. 206 Petitions)- 5 Related Correspondenc NOTES: Application for permit v enewal filed.

05000400 RECIPIENT ID CODE/NANE PNR-A PD2 LA BUCKLEY.B 01 COPIES LTTR ENCL RECIPIENT ID CODE/NANE PNR-A PD2 PD COP IES LTTR ENCL INTERNAL: EDO/ACB ELD/RED EXTERNAL: 24X NRC PDR 04 02 ELD/HDSi NRR DIR LPDR NSI C 03 05 TOTAL NVNBER OF COPIEB REQUIRED:

LTTR 12 ENCL

II

~i>>

lt g 0

.. 'l-i'(i t",~.g!,c(,"t'ai', ()

y >']

i g),l y II

> cl '> i,"

".) '

5 ii

~

J,i~.

'tl il i'4 slc$

1

~

~

II

),g","$.'

g i)~ j gg" <

el>>

tl i, lt.,

"II

", II

'<~q~efl)<j<<'

I i'9

~

)

fj yl

< 'I Ls,ll"s

,gl' ski 0

>,I is o

ll II,)

I i)e~>

I g

4 II II li

(

"Cgl i.

C. );~

sp, A

> (;,

l

~ g I'

'~'

i, s~f f'F 'g

Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Nashington, D.C.

20555 (301) 492-7000

Subject:

Shearon Harris nuclear plant, Carolina Power 6 Light, Emergency Plan

Dear Mr. Denton,

I Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation,.10 CFR Part 50.

This is most significant since Chatham

County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
Thus, no plan which could actually be implemented if the plant were to operate has been tested.

In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.

Clearly, any such action would further complicate this matter.

At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a

full participation test within one year prior to the granting of any full power license should be considered or approved.

Sincerely,

( ~

8606160139 860611 PDR ADOCY;-05000400 H ':

'PDR

~pe

>/y

C a"

II