ML18003B337

From kanterella
Jump to navigation Jump to search
Opposes Util Request for Exemption from Requirement to Conduct Full Participation Test within 1 Yr Prior to Granting OL
ML18003B337
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/11/1986
From: Thorn E
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8606160086
Download: ML18003B337 (3)


Text

REQUL ORY INFORNATION DISTRIBUT N SYSTEH

{RXDB)

ACCESSION NBR: 86061600S6 DOC. DATE: 86/06/ii NOTARIZED:

NO DOCKET FACIL: 50-400 Sheav on Hav v is Nucleav Power Plant>

Unit i.

Cav olina 05000400

~

AUTH. NANE AUTHOR AFFXLIATION THORN> E.

AffiliationNot Assigned RECIP. NANE RECIPIENT AFFILIATION DENTON> H.

Office of Nuclear Reactor Regulation.

Div ectov'post 85ii25

SUBJECT:

Opposes util v equest for exemption from requirement to conduct full pav'ticipation test (within i gr pv'iov'o granting OL.

DISTRIBUTION CODE:

YE03D COPXEB RECEIVED: LTR ENCL SIZE:

TXTLE: Request

+or NRR Action (e. g.

2. 206 Petitions) 8c Related Cev v espondenc NOTES: Application for pevmit v eneeal filed.

05000400 RECIPIENT ID CODE/MANE PWR-A PD2 LA BUCKLEY,8 oi INTERNAL: EDO/ACB 04 COPXEB LTTR ENCL RECIPIENT ID'CODE/MANE PMR-A PD2 PD ELD/HDSi NRR DIR COP IES LTTR ENCL EXTERNAL: 24X NRC PDR LPDR NBIC 03 05 TOTAL NUMBER OF COP XEB REQUIRED:

LTTR i2 ENCL i

.0 "O'

>>',J1.~

I g

R

~'>'l J, 3 1-1>>

~$

"1

> II;fli t,-,'

1

~'

,'Q f "/~i j

'gl S"

~ t,i f

f$ '

0 1, l R>vy 1

f l)

<<fs

~

I

~ r" 9 91 )

>lI 0 i"r) 'T ~:

f 4t.l( g

'-.-'!333 li ]l;

@RE>

$ 1 1$ d f'.~()/ 'li r.',.3 ld ~3 g

ll

, (

h

'R tl '

I (,l'y!S '

{

'I ~ 1' tf I R

1 ~

y. '()

"hg 1

'c T) lI',$ <I 1

0 Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 (301) 492-7000

Subject:

Shearon Harris nuclear plant, Carolina Power

& Light, Emergency Plan

Dear Mr. Denton,

I Carolina Power 6 Light Company has not conducted a full participation test o'f the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CFR Part 50.

This is most significant since Chatham

County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
Thus, no plan which could actually be implemented if the plant were to operate has been tested.

In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.

Clearly, any such action would further complicate this matter.

At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a

full participation test within one year prior to the granting of any full power license should be considered or approved.

Sincerely, PDR 0086 860611 ADOCK 05000400 PDR