ML18003B334
| ML18003B334 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/11/1986 |
| From: | Broughton K AFFILIATION NOT ASSIGNED |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8606160078 | |
| Download: ML18003B334 (3) | |
Text
REQU ORY INFORl'tATIQN DISTRIBU N SYSTEH (R IDS)
ACCESSIQN NBR: 8606160078 DOC. DATE: 86/06/1 1 NOTARIZED:
NO
., DOC)(ET 0 FACIL:50-400 Sheav on Harris Nuclear Power Plant.
Unit ii Cav olina 05000400 AUTH. NAl,1E AUTHOR AFFXLIATION BROUQHTONi N. N.
Affiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION DENTON> H.
Office of Nuclear Reactov Regulationi Direc tov'post 851125
SUBJECT:
Opposes util exemption from requiv ement of full pav'ticipation emev gencg plan test within 1 gr priov to g v an tin g ful 1 p over QL.
DISTRIBUTION CODE:
YEOSD COPIES RECEIVED: LTR I ENCL g SIZE: ~
TXTLE: Request fov NRR Action (e. g.
- 2. 206 Petitions)
Zc Related Cov respondenc NOTES:Application fov permit v enewal filed.
05000400
'E XPIENT XD CODE/NAHE PNR-A PD2 L*
BUCNLEY. B 01 INTERNAL: EDO/ACB ELD/RED COPIES LTTR E CL 1
RECIPIENT ID CODE/NAf'fE PMR-A PD2 PD ELD/HDS1 NRR DIR COP IES LTTR E CL EXTERNAL 24X NRC PDR 02 LPDR NSIC 03 05 TOTAL NUNBER OF COPIES REQUIRED:
LTTR 12 ENCL
I i II ~
J J
.,O.
J t.
a
'rp" Ij ',JJ'(y
~'C l': '~<i<iyl ~ >
f
~i)
J J'I J
I, I i
Ij
~j <',f) <<'1 )
'f'Si
') J)"'
all if '
V I"(I j <<') *',
I 0:., 0 f'-, pl ', ~:"
3 0
f'I q
I i,
I
~ ) J'I Ij, g
)
IIj&,
e <c
~
'jj) )
"I
~
j jjP
t ]
It
~,, " 'I; V "3g jj ', "l J<I.J P-
~+ PrJ q
gllJ
)ll.)>>
', l
..'.x r.>>
Ill>~IjjI.
j jl
~ 3 jj)'k j ~
(VII 3 i">> S -i"i">'-
p
'l> )
'J " jj'(Al,iP
>$ >P.ji l3 "1J K t Jl
"$ I a; Ij "~'.
j)r q j t~
",<<>*l
~ Ij )
JII '~'
4 g@jl,,
II II l,
~
Ij,,~ Q~
t, QyIJ
'J
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 (301) 492-7000
Subject:
Shearon Harris nuclear plant, Carolina Power
& Light, Emergency Plan
Dear Mr. Denton,
Carolina Power
& Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by
- federal regulation, 10 CPR Part 50.
This is most significant since Chatham
- County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
- Thus, no plan which could actually be implemented if the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
- Clearly, any such action would further complicate this-matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
full participation test within one year prior to the granting of any full power license should be considered or approved.
Sincerely, 8606160078 860611 PDR ADOCK 05000400 PDR pod
((p