ML18003B321
| ML18003B321 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/03/1986 |
| From: | Stozier S AFFILIATION NOT ASSIGNED |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8606130197 | |
| Download: ML18003B321 (3) | |
Text
~
'EQ ORY INFORM')ATION DISTR IB N SYSTEM (R IDS)
DOCKET 0
SUBJECT:
Opposes exemption from requirement of full participation emergency plan test within 1 gr prior to OL issuance.
DISTRIBUTION CODE:
YE03D COPIES RECEIVED: LTR ENCL SI ZE:
TITLE: Request
+or NRR Action (e. g.
- 2. 206 Petitions) 0 Related Correspondenc ACCESSION NBR: 8606130197 DOC. DATE: 86/06/03 NOTARIZED:
NO FACIL: 50-400 Shearon Harris Nuclear Power Plant>
Unit ii Carolina AUTH. NAl"fE AUTHOR AFFILIATION STOZIER~ S. H.
AffiliationNot Assigned RECIP. NANE RECIPIENT AFFILIATION DENTONp H.
Office of Nuclear Reactor Regulations Director (post 851125 NOTES: Application for permit renewal filed.
05000400 RECIPIENT ID CODE/NAI'IE PNR-A PD2 LA BUCKLEY B 01 INTERNAl: EDO/ACB
('
COPIES LTTR ENCL RECIPIENT ID CODE/NANE PWR-A PD2 PD ELD/HDS1 NRR DIR COPIES LTTR ENCL EXTERNAL: 24X NRC PDR 02 LPDR NSIC 03 05 TOTAL NUj~fBER OF COPIES REQUIRED:
LTTR 12 ENCL
4+I 5>>j>>
Cr tt)i~'>>r
)<<>>
')'. L}f.'"j
", ",} P
)0
)
'l 5
'P.
II 5
3 tl 5,5>>
i I
rjl l
~ 5 l j
\\
- r r
f IU
)I'
" g ri 5 5
5) 5<<55 f 3 ~') ') )
!5))I}$ r
'! )rr>>
)
5>>5'(
5")
)5$ ]
I 4
Il
)5 5
t>>S r
>>'l Ij, 5 r,
)ol~A
)X) )55
>>5>>,
, 5
5 ger@ t'49
/~p~, ~ z.rum
~m 9) Le~
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 (301) 492-7000
Subject:
Shearon Harris nuclear plant, Carolina Power A Light, Emergency Plan
Dear Mr. Denton,
Carolina Power 8 Light Company has not conducted a full parti'cipation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CPR Part 50.
. This is most significant since Chatham
- County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
- Thus, no plan which could actually be implemented if the plant were to operate has been tested, In addition, citizens and off1cials in other c'ounties are considering w1thdrawing from the present emergency plan.
- Clearly, any such act1on would further complicate this matter.
At 1eas t until such time as state and local-governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
full participation test within one year prior to the granting of any full power license should be considered or approved.
Sincerely,
~e. Z~
'g06130197 Sb0603 PDR ADOCK 05000400 H