ML18003B319

From kanterella
Jump to navigation Jump to search
Opposes Util Exemption from Requirement of Full Participation Emergency Plan Test within 1 Yr Prior to Granting Full Power License
ML18003B319
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/13/1986
From:
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8606130166
Download: ML18003B319 (4)


Text

REQUL ORY INFORMATION DISTRIBU N BYSTEH (RIDB)

, 'C ACCESSION NBR: 8606130166 DOC. DATE: 86/06/i3 NOTARIZED:

NO DOCKET 4 FACIL:50-400 Shearon Harris Nuclear Power Planti Unit ii Carolina 05000400 AUTH. NANE AUTHOR AFFILIATION AffiliationNot Assigned REC IP. NAI'IE RECIPIENT AFFILIATION DENTONi H, Office of Nuclear Reactor Regulationi Direc tor (post 85ii25

SUBJECT:

Opposes util exemption from requirement of full participation emergenc'g p lan test Ulithin i Qr prior to granting ful 1 p otoer license.

DISTRIQUTION CODE:

YE03D COPIEB RECEIVED: LTR ENCL SIZE:

TITLE: Request for NRR Action (e. g.

2. 206 Petitions) 8c Related Correspondenc i

NOTES: Application for permit renewal Piled.

05000400 RECIPIENT ID CODE/NANE PWR-A PD2 LA BUCKLEY'S 3 Oi INTERNAL: EDO/ACB EtJ) 04 COPIES LTTR E CL REC IP IENT ID CODE/NANE PWR-A PD2 PD ELD/HDSi NRR DIR COP IEB LTTR E r L EXTERNAL: 24X NRC PDR 02 LPDR NSIC 03 05 TOTAL NUHBER OF COPIES REQUIRED:

LTTR i2 ENCL

li

~~

r

,',,";fsj ri ~

$,$ )'f;y,8 I

p "T f<(,,ll'] )

';'llew gll>> p

/,wC'4 $

1 f<

, r~

gp ','

E

,," ~j,/>> P It IP

~ I),;

'jc'

~';

f'>>

P J -Ip~)

~

~i'iE k ~

a

  • 4

)

1 X

"".,".$~)t'ai' V'q 3

'>'I

> j I,"Ac

",'i II

~

'(l

<4$ '<

c P.h>,,~

e,il ~),

r,~',v~f ~

'~ e~l I

>3 l

Cfl

,I lt i, 'p

,"/$

f(

t

Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 (301) 492-7000

Subject:

Shearon Harris nuclear plant, Carolina Power

& Light, Emergency Plan

Dear Mr. Denton,

I Carolina Power

& Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CFR Part 50.

This is most significant since Chatham

County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
Thus, no plan which could actually be implemented if the plant were to operate has been tested.

Zn addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.

Clearly, any such action would further complicate this matter.

At least until such time as state and local governmental partitipation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a

full participation test within one year prior to the granting of any full power license should be considered or approved.

Sincerely, 8b061301hh 860613 PDR ADOCK 05000400

'DR

0 0