ML18003B312
| ML18003B312 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/10/1986 |
| From: | Schorger M AFFILIATION NOT ASSIGNED |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8606130027 | |
| Download: ML18003B312 (4) | |
Text
r REQUL ORY INFORMATION DISTRIBUT SYSTEN {RIDS)
ACCESSlON NBR: 8606130027 DOC. DATE: 86/06/10 NOTARIZED:
NO DOCKET 0 FACIL:50-400 Shearon Harris Nuclear Power Plant~
Unit 1> Carolina 05000400 AUTH. NAltE AUTHOR AFFILIATION SCHORQER, ND.
AffiliationNot Assigned RECIP. NANE RECIPIENT AFFILIATION DENTONp H.
Office of Nuclear Reactor Regulation>
Director (post 851125
SUBJECT:
Opposes util exemption from requirement of full participation emergency plan test within 1 gr prior to OL i5 suan c e.
DISTRIBUTION CODE:
YEOSD COPIES RECEIVED: LTR Q ENCL g SIZE:
TITLE: Request for NRR Action (e. g.
- 2. 206 Petitions)
- 5. Related Correspondenc NOTES: Application for permit renewal filed.
o5aaoooo RECIPIENT ID CODE/NANE PNR-A PD2 LA BUCKLEY B 01 COPIES LTTR ENCL RECIPIENT ID CODE/NANE PWR-A PD2 PD COP IES LTTR ENCL.
INTERNAL: EDO/ACB ELD FIL EXTERNAL: 24X NRC PDR 04 ELD/HDSi NRR DIR LPDR NSIC 03 05 TOTAL NVNGER OF COPIES REQUIRED:
LTTR IR ENCL
t ~
<< f
> 'jt ~)
g
~ >P "f, f ) IJ>; <<
l ll r-
<< I><<
jt ~ <<"," <<
, <<tl -< <<-f yq ~f)
<<li
,"<<PAL "8
C<>j,'i f <<jj,kP
<<A>'jj'<<<<'c.-<<tE1P",J
>f>>ff$ '
j<<i'
<</i~
.~>
tt ',
'$C "I 4'~f,'<<'>
I j>jf<<',W$
i ftt'(
lP$
fl I I f III 7<<
')),> >tj
(,i,3-3
'=IR<<A
'<<<<f >
lt>
I,'<<
<<"., 1>i Vt <<5,,
g
)
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S.,Nuclear Regulatory Commission Washington, D.C.
20555 (301 ) 492-7000
Subject:
Shearon Harris nuclear plant, Carolina Power
& Light, Emergency Plan
Dear Mr. Denton,
I Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CFR Part 50.
This is most significant since Chatham
- County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
- Thus, no plan which could actually be implemented if the plant were to operate has been tested.
Xn addition, citizens and off'='als 'n other countie=.
are considering withdrawing from the present emergency plan.
- Clearly, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
full participation test within one year prior to the granting of any full power license should be considered or approved.
Sincerely,~Q Q. 5~&rge~
<o-goo 8gOb13o 05OOOPOO
'I 8gO/10
@DR PDQGH o
t 4
H y