ML18003A799

From kanterella
Jump to navigation Jump to search
Requests Confirmation Whether Proposed 500 Kv Transmission Line Route for Facilities Represents Change in Sys Transmission Requirements from Requirements Addressed in Fes.Reasons for Changes Required
ML18003A799
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 01/09/1980
From: Lear G
Office of Nuclear Reactor Regulation
To: Sells D
Office of Nuclear Reactor Regulation
References
NUDOCS 8001240007
Download: ML18003A799 (2)


Text

4 Docket Nos. 50-400, 50-401 50-'40), 50-)43 HBIORANDUi1 FOR:

Donald'E. Sells, Acting Chief Environmental Projects Branch 2, DSE FROW:

SUBJECT:

George Lear, Chief Environmental Specialists

Branch, DSE REVIEH OF SHEARON HARRIS TRANSMISSION LINE ROUTE

>le have reviewed the report submitted by Carolina Power and Light Company (CPRL) identifying the major, environmental features of the Harris-Harnett 500 kV transmission line associated with Shearon Harris Nuclear Power Plant.

The report was submitted in response to a Construction Permit Licensing Condition for the above facility.

A preliminary review of the CP&L report indicates that there is sufficient data to begin a review of the proposed line.

tie will,

however, need to -visit the site area to investigate the proposed route (and alternatives) and seek.additional information and data before we can complete our environmental assessment of the proposed Harris-Harnett 500 kV transmission line.

Our preliminary investigation of the Shearon Harris Final Environmental Statement (CP) did not find any assessments'f the proposed line.

Pie would like to know if the proposed-route represents a change in system transmission requirements from those addressed in the Final Environmental Statement and reasons for those changes, if any.

G. Gears of this section will undertake this review.

Original signed by George l.ear George Lear, Chief Environmental Specialists Branch Division of Site Safety and Environmental Analysis cc:

1l. Regan G. Lear S.

Keblusek G. Gears DISTRIBUTION:-

Dockets EPT Rdg TEPA JRKline NRR Pdg PP OrnCB~

BURNAMC~

llATC~

DSE:EPT;ESB

.GEGaa.

.w..

.1/2/8 E

PT, g.

1.j.

DSE EPT:ESB RRC rlORM 518 (9-76) NRCbf 0240 0 VaD OOVCllNMCNTflllNTINOOff lCCl l ~

' 0 00 ~

TDD

0

'I

~,

11 nq' V

~

I

'I n,n P

I

~

P I

If P

In n

e r=

I P

'I P

a'M n