Final Status Survey Final Report Volume 3, Chapter 13, Survey Area Release Record for Land Survey Area 10, Survey Unit 02, Appendix P-6
ML17363A351
Person / Time
Site: 07000036
Issue date: 12/05/2017
From:
Westinghouse
To:
Office of Nuclear Material Safety and Safeguards
References
HEM-17-71
Download: ML17363A351 (1)


Text

Hematite Procedure: HDP-PR-FSS-701, Final Status Survey Plan Development Decommissioning Project Westinghouse Non-Proprietary Class 3 Revision: 4 Appendix P-6, Page I of I APPENDIX P-6 FSS FIELD LOG Survey Area:

LSA-10

==

Description:==

Burial Pit Open Land Area Survey Unit:

02

==

Description:==

West Central Survey Unit (North Burial Pit Area)

FSS Field Loi:;:

Date/Time:

Observation or Comment:

Technician 1/29/15 Prior to beginning GWS, a task-specific safety briefin~ was performed t the FSS J. Willams Supervisor. In the field, before GWS commenced FS crew confirmed & C

~

integrity. Background levels were measured at 9.5K- !OK (voss cpm. Entered int~

  • LSA 10-01 at 1530 and commenced GWS. Weather is party cloudy and J\\Yfcroximately 50° F. No anomalies or foreign debris noted. Exit area at 1710.

es created:

LSA 10 02 012915 B MC LSA 10 02 012915 JW C 1/30/15 Prior to beginning GWS, a task-criecific safety briefin~ was performed b(. the FSS J. Williams Supervisor. In the field, before WS commenced FS crew confirmed & C integrity. Dewatering performed b? ops to allow access to low lying and previousp-J~

waterlogfed areas. Entered into L A 10-02 at 1015 and GWS performed.. Exit area at I 15. Return to area at 1255 to continue GWS. Weather is partly cloudy and approximately 40° F. One of the pits was inaccessible due to extremely soft bottom, even after dewatering. Supervisor notified and corrective actions discussed. Exited area at 1715. Files created:

LSA_10_02_013015 _B _MC LSA_l0_02_013015 _B2_MC LSA 10 02 012915 C JW LSA 10 02 012915 C2 JW 02/02/15 Prior to beginning GWS, a task-criecific safety briefin§ was performed by the FSS J. Williams Supervisor. In the field, before WS commenced FS crew confirmed I & C integrity. Entered into LSA 10-02 at 0915 to begin filling holes in GWS coverage,ra. 4 includin~ the pit discussed on 1/30/15. Some areas remain inaccessible, but acces

,/~

to them as been discussed with operations. Exit area at 1205. After operations had made the area between the fences accessible, re-enter the area at 1300.

Weather is partly cloudy and approximately 30° F. The remainder of the 10-02 GWS area completed and exit area at 1400. Files created:

LSA 10 02 020215 C JW

  • note that due to the relatively small size, file C2 LSA_10_02_020215 _C2_JW was combined into C during post processing LSA 10 02 020215 C3 JW 02/03/15 Prior to beginning field work, a task-specific safety briefing was performed b.f the J. Williams FSS Supervisor. Prior to beginning soil sam,riling, the FSS crew confirmed I C

~

  • .zt;._..,

integrity. Weather is clear and in tlie mid 40 s. Systematic and Biased Samples r,;

  • collected. Exit area at 1655.

FSS Field Log _1 _of_l _

Quality Record