Final Status Survey Final Report Volume 3, Chapter 13, Survey Area Release Record for Land Survey Area 10, Survey Unit 01, Appendix P-6
ML17363A350
Person / Time
Site: 07000036
Issue date: 12/05/2017
From:
Westinghouse
To:
Office of Nuclear Material Safety and Safeguards
References
HEM-17-71
Download: ML17363A350 (1)


Text

Hematite Procedure: HDP-PR-FSS-70 I, Final Status Survey Plan Development Decommissioning Project Westinghouse Non-Proprietary Class 3 Revision: 4 Appendix P-6, Page I of I APPENDIX P-6 FSS FIELD LOG Survey Area:

LSA-10

==

Description:==

Burial Pit Open Land Area Survey Uuit:

01

==

Description:==

West Central Survey Unit (North Burial Pit Area)

FSS Field Log:

Date/Time:

Observation or Comment:

Technician 1/22/15 Prior to beginning GWS, a task-specific safety briefin~ was performed by the FSS J. Willams Supervisor. In the field, before GWS commenced FS crew confirmed I & C

~

intTit Back~ound levels were measured at 1 OK - 11 K gross cpm. Entered into r-..,a * *

  • LS 1 -01 at 1 15 and commenced GWS. Weather is sunny and mid 30's. No anomalies or foreign debris noted. Exit area at 1700. Files created:

LSA_l 0_01_012215_B_MC LSA_10_01_012215 _C_JW 1/27/15 Prior to beginning GWS, a task-specific safety briefin~ was performed t the FSS M.

Supervisor. In the field, before GWS commenced FS crew confirmed & C Cushman in~ity. Entered into LSA 10-02 and resumed GWS from 1100 - 1230. Resume

'L G

from 1330- 1630. Temps are in the upper 40's. Note: significant time spent today on side walls. GWS substantially complete with a 22k hotspot discovered.

Files created:

LSA_10_01_012715_C_JW LSA_10_01_012715_C2_JW LSA_l0_01_012715 _ C3 _JW LSA_10_03_012715_B_MC

  • Note that file names were corrected to 10_01 during LSA 10 03 012715 B MC Post processing on both MC files today 1/28115 Prior to beginning GWS, a task-specific safety briefin§ was ¥erformed by the FSS M.

Supervisor. Prior to b':finning soil samgling and GW, the SS crew confirmed Cushman I&C integrity. Enterte LSA 10-01 at 1 45. A waist hig!l background GWS study L was perfonned ofLSA 10-01,02, and 03. Systematic soils samplinf was performed, collectin§ sam~les L 10-01-0 l -B-S-S-00 thro~h L 10-0 B-S-S-OO and L 10-01-09-B-S- -00 t ough LI0-01-17-B-E-S-OO.

eather is sunny and approximately 50° F. Exit area at 1745.

1/29115 Prior to beginning GWS, a task-specific safety briefin§ was ¥erformed by the FSS J. Willams Supervisor. Prior to beginning soil samplincF and GW, the SS crew confirmed l&C integrity. Weather is partly cloudy an approximately 50° F. Entered area ar--7'~

0900 to collect the remaining systematic soil samples. Performed GWS of remediated 22k hotsfot, creating file LSA 10 01 01291 REMEDIATION C JW. Performed Z Score analysis and collectecf a b1ased sample: LI 0-01-18-8--::E::-B-OO. LSA-10-0 I field activities complete.

FSS Field Log __ !_ of_!_

Quality Record