ML17355A320
| ML17355A320 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/05/1999 |
| From: | Peterson S NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML17355A321 | List: |
| References | |
| NUDOCS 9905110144 | |
| Download: ML17355A320 (11) | |
Text
t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHTCOMPANY DOCKET NO. 50-250 TURKEY POINT PLANT UNIT NO. 3 AMENDMENTTO FACILITYOPERATING LICENSE Amendment No. 200 License No. DPR-31 The Nuclear Regulatory Commission (the Commission) has found that:
The application for amendment by Florida Power and Light Company (the licensee) dated February 24, 1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facilitywilloperate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment willnot be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9905iiQi44 990505 PDR ADQCK 05000250 P
I l 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-31 is hereby amended to read as follows:
(B)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 200, are hereby incorporated in the license.
The Environmental Protection Plan contained in Appendix B is hereby incorporated into the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION Sheri R. Peterson, Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation y
Attachment:
Changes to the Technical Specifications Date of Issuance:
May 5, 1999
I
gp,g RfGy, e>
0 nO IVl O~
Op
~+*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 FLORIDA POWER AND LIGHTCOMPANY DOCKET NO. 50-251 TURKEYPOINT PLANT UNIT NO. 4 AMENDMENTTO FACILITYOPERATING LICENSE Amendment No. 194 I icense No. DPR-41 The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Florida Power and Light Company (the licensee) dated February 24, 1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facilitywilloperate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities willbe conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility
, Operating License No. DPR-41 is hereby amended to read as follows:
(B)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 194, are hereby incorporated in the license.
The Environmental Protection Plan contained in Appendix B is hereby incorporated into the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION Sheri R. Peterson, Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
Hay 5, 1999
ATTACHMENTTO LICENSE AMENDMENT AMENDMENTNO.200 FACILITYOPERATING LICENSE NO. DPR-31 AMENDMENTNO.194 FACILITYOPERATING LICENSE NO. DPR-41 DOCKET NOS. 50-250 AND 50-251
'Replace the following pages of the Appendix A Technical Specifications with the attached revised page.
The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove a es 3/4 7-15 3/4 7-15
PLANT SYSTEMS 3/4.7.4 ULTIHATE HEAT SINK LIHITING CONDITION FOR OPERATION 3.7.4 The ultimate heat sink shall be OPERABLE with an average supply water temperature less than or equal to 100'F.
APPLICABILITY:
HODES 1, 2. 3.
and 4.
ACTION:
With the requirements of the above specification not satisfied.
be in at least HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. This ACTION shall be applicable to both units simultaneously.
SURVEILLANCE RE UIREMENTS 4.7.4 The ultimate heat sink shall be determined OPERABLE at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the average supply water temperature" to be within its limit.
- Portable monitors may be used to measure the temperature.
TURKEY POINT - UNITS 3 5 4 3/4 7-15 AHENDHENT NOS.200AND 194
I