Forwards SE as Closeout Rept for Ampacity Derating Issues Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Per Util 980626 & 30 Responses to NRC 980423 Rai.No Outstanding Ampacity Derating Issues as Identified in GL for Plants
ML17355A276
Person / Time
Site: Turkey Point, Saint Lucie  
Issue date: 03/26/1999
From: Thomas C
NRC (Affiliation Not Assigned)
To: Plunkett T
FLORIDA POWER & LIGHT CO.
Shared Package
ML17355A277 List:
References
GL-92-08, GL-92-8, TAC-MA3366, TAC-MA3367, TAC-MA3383, TAC-MA3384, NUDOCS 9904020172
Download: ML17355A276 (6)


Text

March 26, 1999 Mr. Thomas F. Plunkett President - Nuclear Division Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

CLOSEOUT REPORT FOR THE AMPACITYDERATING ISSUES RELATED TO GENERIC LETTER 92-08, "THERMO-L'AG330-1 FIRE BARRIERS" - ST. LUCIE PLANT, UNITS 1 AND 2, AND TURKEY POINT PLANT, UNITS 3 AND 4 (TAC NOS. MA3366, MA3367,, MA3383 AND MA3384)

/

Dear Mr. Plunkett:

By letters dated June 26, 1998, and June 30, 1998, Florida Power and Light Company (FPL) submitted responses to the U.S. Nuclear Regulatory Commission (NRC) Request for Additional Information (RAI) dated April 23, 1998, related to the ampacity derating issues for St. Lucie Plant (SLP), Units 1 and 2, and Turkey Point Plant (TPP), Units 3 and 4, respectively.

The NRC staff in conjunction with its contractor, Sandia National Laboratories (SNL), has completed its review of FPL's analytical approach for the ampacity derating determination.

The review findings are documented in the enclosed Safety Evaluation (Enclosure 1) and SNL Technical Letter, "ATechnical Evaluation of the Florida Power and Light Fire Barrier Ampacity Derating Assessments for St. Lucie and Turkey Point," dated September 30, 1998 (Enclosure 2).

The staff concludes that there are no outstanding ampacity derating issues as identified in Generic Letter 92-08 for SLP and TPP.

During the course of the review, the staff has identified some open items in TPP calculations which could impact future design changes to the plant as well as some plant life extension issues (i.e., cable aging). Although no further action is necessary at this time, the staff plans to use the enclosed safety evaluation in any followup inspection.

9904020172 99032b PDR AOOCK 05000250 P

PDR Docket Nos. 50-335, 50-389 50-250 and 50-251

Enclosures:

As stated Sincerely, (MqpmQ. signed. by:

Cecil O. Thomas, Director Project Directorate II-3 Division of Licensing Project Management cc w/enclosures: See next page DISTRIBUTIONw/enclosures:

PUBLIC Docket Files St. Lucie r/f Turkey Point r/f BClayton ACRS LWert, Rll JZwolinski/SBlack AJKugler WGleaves KJabbour DOCUMENT NAME: GPTURKENMA3383 To receive co, indicate: "C" = Co w/o attachment; "A"= Co w/attachment; 'N" = None. NO MARK= NO COPYt OFFICE PDII-3/PM C

PDII-3/PM

/I PDII-3/LA PDII- /D NAME KJabbour WGleavee LlX~

BCla on DATE 03///99 03 99 03/ot99 0

9 ALRECORD COPY 0'y ~~

C h

bl Bl C

C

'f 4

gp,R RKog

~4 "o

Cy Cl

~o~

+a*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&0001 March 26, 1999 Mr. Thomas F. Plunkett President - Nuclear Division Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

CLOSEOUT REPORT FOR THE AMPACITYDERATING ISSUES RELATEDTO

. GENERIC LETTER 92-08, "THERMO-LAG330-1 FIRE BARRIERS" - ST. LUCIE PLANT, UNITS 1 AND 2, AND TURKEYPOINT PLANT, UNITS 3 AND4 (TAC NOS. MA3366, MA3367, MA3383 AND MA3384)

Dear Mr. Plunkett:

By letters dated June 26, 1998, and June 30, 1998, Florida Power and Light Company (FPL) submitted responses to the.U.S. Nuclear Regulatory Commission (NRC) Request for Additional Information (RAI) dated April23, 1998, related to the ampacity derating issues for St. Lucie Plant (SLP), Units 1 and 2, and Turkey Point Plant (TPP), Units 3 and 4, respectively.

The NRC staff in conjunction with its contractor, Sandia National Laboratories (SNL), has completed its review of FPL's analytical approach for the ampacity derating determination.

The review findings are documented in the enclosed Safety Evaluation (Enclosure 1) and SNL Technical Letter, "ATechnical Evaluation of the Florida Power and Light Fire Barrier Ampacity Derating Assessments for St, Lucie and Turkey Point," dated September 30, 1998 (Enclosure 2).

The staff concludes that there are no outstanding ampacity derating issues as identified in Generic Letter 92-08 for SLP and TPP. During the course of the review, the staff has identified some open items in TPP calculations which could impact future design changes to the plant as well as some plant life extension issues (i.e., cable aging). Although no further action is necessary at this time, the staff plans to use the enclosed safety evaluation in any followup inspection.

Sincerely, Docket Nos. 50-335, 50-389 50-250 and 50-251

Enclosures:

As stated cc w/

Enclosures:

See next page Cecil O. Thomas, Director Project Directorate II-3 Division of Licensing Project Management

Mr.T. F. Plunkett Florida Power and Light Company CC:

Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, Florida 34957 Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 M. S. Ross, Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Robert J. Hovey, Site

'ice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, Florida 34982 Mr. R. G. West Plant General Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957 Mr. Gary E. Hollinger Licensing Manager Turkey Point Nuclear Plant 9760 SW. 344th Street Florida City, FL 33035 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin ¹C21 Tallahassee, Florida 32399-1741 ST. LUCIE PLANT TURKEY POINT PLANT J. A. Stall, Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Senior Resident Inspector-Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 1448 Homestead, Florida 33090 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 County Manager Miami-Dade County 111 NW 1 Street, 29th Floor Miami, Florida 33128 E. J. Weinkam Licensing Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957 Mr. John Gianfrancesco Manager, Administrative Support and Special Projects P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. J. Kammel Radiological Emergency Planning Administrator Department of Public Safety 6000 SE. Tower Drive Stuart, Florida 34997

0 I