Informs That Debris Screens on Purge Supply & Exhaust Valves Will Be Installed During Next Refueling Outage. Commitment Meets SRP Section 6.2.4,Rev 1 & Branch Technical Position Csb 6-4,Rev 1 Requirements
ML17354A225
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/01/1983
From: Varga S
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8302080106
Download: ML17354A225 (4)


Text

pate oi 1983 Docket Nos. 50-250 and 50-251 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Flor ida Power and Light Company Post Office Box 529100 t5iami, Flor ida 331,52 RIBUTION

~

~

D c ets NRC PCR L

PDF!

NSIC DEisenhut OELD JMTaylor ELJordan ACRS-10 CParrish DMcDonald Gray

Dear Dr. Uhrig:

SUBJECT:

LONG-TERM REVIEW CONTAINMENT PURGE Al'tD VENT VALVES On August 31, 1981, we issued the staff's Safety Evaluation for containment purging and venting during normal operation of'urkey Point,Plant, Units 3 and 4.

lte indicated that the Safety Evaluation was subject to additional assurance, such as debris screens, that the isolation valves will close.

Your sutmittal dated November 17, 1982, provides a commitment to install Pbbris screens on the purge supply and exhaust valves Adring the next refueling outage for each unit.

He have concluded, that'-'this commitment beets the staff's requirements to be in conformance to the Standard Revie~ Plan Section 6.2.4 Revision 1

and Branch Technical Position CSB 6-4 Revision l.

An>acceptable alter-native to installing the debris screens would, be to maintain the purge valves sealed-closed during Operating Modes 1 through 2.

The referenced Safety Evaluation provides the details of our revie.'or this portion of the vent and purge issue.

Sincerely,.

~i<<~Z simedbyc:

cc:

See next page Steven A. Yarga, Chief Operating Reactors Branch 01 Division of Licensing 8302080i06 83020i PDR ADOCK 05000250 P

PDR ORB ORB' OFFICE/

SURNAME/

~ \\ ~ 0 ~ ~ ~

~ ~ ~ ~ ~

DM D,:d

~ ~ ~

OO ~

~

~ ~ ~ ~ ~ 4 IO ~ ~ ~

~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~

- S--'a' 0 ~ 0 ~ ~I~I~ 0 ~ 000 ~ OIO ~ ~ 0 ~ 1

~I~ 0 ~ ~ 0 ~ ~ 10 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~

~ ~ ~ ~ ~ ~ 0 ~

~ ~ ~I ~ ~ ~ ~ ~t ~ 0 ~ 0 ~

OATE $

12/g 2

82

~ 0 ~ ~ ~ 0 ~ ~ 0 ~ 0 ~ ~ 0 ~ ~I~ 0

~ 00 ~

NRC FORM 318 (1 0-80) NRCM 0240 OFF ICIAL R ECOR D COPY USGPO1 19II1~

I IO tl

Robert E. Uhrig Florida Power and'ight Company

~

'C:

Harold F. Reis, Esquire Lowenstein, Newman, Reis and Axelrad 1025 Connecticut

Avenue, N.W.

Suite 1214 Washington, D. C.

20036

.Norman A. Coll, Esquire

Steel, Hector and Davis 1400 Southeast First National Bank Building Miami, Florida 33131 Mr. Henry Yaeger, Plant Manager Turkey Point Plant Florida Power and Light Company P. 0.

Box 013100 Miami, Florida 33101 Mr. Jack Shreve

..Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Administrator Department of Environmental Regulation Power Plant SitingSection State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Resident Inspector Turkey Point Nuclear Generating Station U. S. Nuclear Regulatory Commission Post Office Box 1207

, Homestead, Florida 33030 James P. O'Reilly Regional Administrator - Region, II U. S. Nuclear Regulatory Commission 101 Marietta Street - Suite 3100 Atlanta, Georgi'a 30303

Ck 0