ML17353A918

From kanterella
Jump to navigation Jump to search
Forwards Controlled Copy 1 of Final Rept of Plant Specific Seismic Adequacy Evaluation of Plant,Units 3 & 4,to Resolve USI A-46 & GL 87-02. App a to Rept 90C1585D Withheld
ML17353A918
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/15/1993
From: Bohlke W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17353A919 List:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, NUDOCS 9610090180
Download: ML17353A918 (4)


Text

CATEGORY 2 REGULAT<O INPQRMATIQN 'DIBTRIBUTIUNBTEM (RIDs)

ACCESSION NBR:9610090180 DOC.DATE: 93/07/15 NOTARIZED:

NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION BOHLKE,W.H.

Florida Power (('ight Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards controlled copy 1 of "Final Rept of Plant Specific Seismic Adequacy Evaluation of Plant, Units 3

& 4,to Resolve USI A-46 6

GL 87-02."

DISTRIBUTION CODE:

DF01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Direct Flow Distribution:

50 Docket (PDR Avail)

NOTES:

E RECIPIENT ID CODE/NAME INTERNAL:

E CENTER 1

EXTERNAL: NOAC COPIES LTTR ENCL

'1 1

1 1

RECIPIENT ID CODE/NAME COPIES LTTR ENCL NUDOCS-ABSTRACT 1

1 NRC PDR tNP 0

D 0

U E

NOTE TO ALL MRIDSM RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 4

ENCL 4

)

1 p

>P

Florida Powor & Light Company, P.O. Box 14000, Juno Boach, FL 33408-0420 JUL 15 )993 L-93-155 U.S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555 Re:

Turkey Point Units 3

& 4 Docket Nos.

50-250 and 50-251 St. Lucie Unit 1 Docket No. 50-335 Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI)

A-46 Generic Letter GL No. 87-02 Gentlemen:

Enclosed for your information is controlled copy No.

1 of "Final Report of Plant Specific Seismic Adequacy Evaluation of Turkey Point Units 3 and 4 to Resolve Unresolved Safety Issue (USI) A-46 and Generic Letter (GL) 87-02."

Contained in this Final Report is "Plant Specific Seismic Adequacy Implementation Procedure to Resolve Unresolved Safety Issue (USI)

A-46 and Generic Letter (GL) 87-02."

By NRC letter dated August 17, 1989 to FPL, this Implementation Procedure was accepted as proprietary to be withheld from public disclosure per 10 CFR 2.790.

This Implementation Procedure consists of 40 pages, each of which is marked PROPRIETARY and is Appendix A to this Final Report.

By Enclosure A to letter L-92-239 dated September 9,

1992, FPL submitted Piping and Instrument Diagrams and Equipment Lists for Turkey Point Units 3

& 4.

These diagrams and lists are to be used in conjunction with this Final Report.

Very truly yours, W.H.

Bo lke Vice President Nuclear Engineering and Licensing WHB/JRL/vmg Enclosure cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant Ogoog9 qhi0090i80 9307i5 PDR ADOCK 05000250 P

PDR 8

A/ld Slid

o fi,

/Pi".>

~

~

)IJ(

J f

l I

II 4'II J

1t ~