Forwards SE Approving Code Case N-416-1 as Alternative to Required Hydrostatic Pressure Test.Inel Technical Ltr Rept Also Encl
ML17353A592
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/11/1996
From: Croteau R
NRC (Affiliation Not Assigned)
To: Plunkett T
FLORIDA POWER & LIGHT CO.
Shared Package
ML17353A593 List:
References
TAC-M94326, TAC-M94327, NUDOCS 9603140426
Download: ML17353A592 (6)


Text

'RIBUTION attached sheet Use of Code Case N-416-1 is authorized pursuant to 10 CFR 50.55a(a)(3)(ii),

provided that

1) additional surface examinations are performed on the root (pass) layer of butt and socket welds on the pressure retaining boundary of Class 3 components when the surface examination method is used in accordance with ASHE Section III and
2) the system leakage test is performed in accordance with IWA-5000 of the 1992 Edition of Section XI, at nominal operating temperature and pressure.

The use of ASME Code Case N-416-1 is authorized until such time as this Code case is published in a future revision of U.S.

NRC Regulatory Guide

1. 147.

At that time, if you intend to continue to implement this Code case, you must follow all provisions in Code Case N-416-1, with limitations issued in Regulatory Guide 1. 147, if any.

The NRC staff's evaluation and conclusions are contained in the attached Safety Evaluation.

The INEL Technical Letter Report is also attached.

,. March'-:ll, 1996

..Hr. T, F,.

>Plunkett,'resident-Nuclear Divi'sio'n Flori'da Power"and -Ligh'tCompany P.O;--Box, 14000 Juiio B'each Flori'da.

33408-0420,

SUBJECT:

TURKEY. POINT UNITS 3 AND 4 - APPROVAL OF CODE CASE N-416-1 AS AN ALTERNATIVE/TO,THE REQUIRED,'HYDROSTATIC PRESSURE TEST (TAC NOS H94326 'AND H94327)',,

4

Dear,

Mr.. Plunkett:

,r<

On December 14, 1995, you requested relief from the provisions of the American Society of Mechanical Engineers'(ASHE)

Boiler and Pressure Vessel

Code,Section XI, "Rules for Inservice" Inspection of Nuclear Power Plant Components,"

in accordance

~with 10 CFR 50.55a(a)(3) for Turkey Point, Units 3

and 4.

Specifically, you"requested permission to use the alternative requirements of ASHE Code Case N-416-1 for the alternative pressure testing of welded repairs or installation of replacement items by welding'n addition, you indicated that this relief was also requested for the steam generator nozzle to reducer weld joints.

9b0314042b 9b03li f DR ADOCX 05000a50 P

PDR Sincerely, (Original Signed By)

Richard P. Croteau, Project Manager Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Docket Nos.

50-250 and 50-'251

Enclosures:

Safety Evaluation Technical L'etter Report cc w/enclosures:

See next page,.

Document.Nam'e:

G:TURKEY TP94326.REL 'see revious con rrence OFFICE LA:PD I I-'1 NAME "

,EDunnin ton*

,I J

RCroteau EHol.l'er*

PH:PDII-1 OGC D: PDI I-1 EImbro 1

DATE,."-'

l4'6, gg'j, 9

96'.>

'It 96 96 1

COPY "-'-',;.Yes/No'es/No Yes/No e /No

',,', 'FFICIALRECORD COPY

(

i X

r ll

\\

II J

(

ll l

lp ll iI 4'(

C f,J k

4

'I

<I v

f I

l I

w! l<AH c

) I' (ir y, g'l 'ti I

il

Mr. T.

F.. Plunkett Florida Power and Light Company Turkey Point Plant CC:

J.

R.

Newman, Esquire
Morgan, Lewis

& Bockius 1800 M Street, N.W.

Washington, DC 20036 I

Jack Shreve, Public',Counsel.

~'ffice of the Public Co'un'sel~

c/o The Florida Legislat'ure 111 West Madison Avenue, Room 812

" s Tallahassee, Florida'32399-'1400'~.,,,

J John T.Butler., Esquir'e,~

'teel,-Hector..;and Davis '

4000 Southeast Financial"Center '-

.-"~.~>>

Miami,,Florida~33131-2398 f, <-~.

Mr,.Robert:J., Hovey', Site Vice,',Presi,dent =,,

Turkey'Point'uclear,.Plant,"

Florida Power,~and,Light Company '~

P.O.

Box 029100'iami,,Flori,da'3,102

'J Armando Vidal '

County'anager Metropolitan Dade County ill NW 1'Street, 29tli,F1'oor Miami, Florida 33128 "

',)

Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission P.O.

Box 1448 Homestead, Florida 33090 Mr. Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Mr. Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta, Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P. 0.

Box 029100 Miami, Florida 33102 Mr. H.N. Paduano, Manager Licensing

& Special Programs Florida Power and Light Company P.O'.

Box 14000 Juno

Beach, Florida 33408-0420 Mr. Gary E. Hollinger Licensing Manager Turkey Point Nuclear Plant P.O.

Box 4332 Princeton, Florida 33023-4332 Mr. Kerry Landis U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323-0199

I I I',

fi

,;,, P I

)II II I

if t

,I Il

.j I

A

,jg fl

)I I

II II h

/I II II I

'it gl t

'1

Memorandum Dated

~03 11 96 Distribution

'Docket File PUBLIC PDII-I Reading S. Varga J. Zwolinski D. Hagan, T-4A-43 G. Hill; (4) T-5C-3 OGC ACRS G. Tracy K. Landis, R-II

~ I I

tl It lt U

t 1t, ih I

h hl lt It 1

ll 1

iw (I

I It, fl