L-95-268, Forwards ISI of Four SGs Conducted on 941014-17.Informs of No SG Tubes Plugged as Result of Insp
| ML17353A392 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/06/1995 |
| From: | Plunkett T FLORIDA POWER & LIGHT CO. |
| To: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML17353A393 | List: |
| References | |
| L-95-268, NUDOCS 9510110118 | |
| Download: ML17353A392 (4) | |
Text
PRXOR1TY 1 (ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9510110118 DOC.DATE: 95/10/06 NOTARIZED: NO DOCKET g FACIL:50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 P
AUTH.NAME
-AUTHOR AFFILIATION PLUNKETT,T.F; Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION R
EBNETER,S.D.
Region 2 (Post 820201)
SUBJECT:
Forwards ISI of four SGs conducted on 941014-17.Informs of no SG'.tubes plugged as result of insp.
DISTRIBUTION. CODE:
A047D COPIES RECEIVED:LTR i ENCL
/
SIZE: kf 7 TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code GL-89-04 NOTES RECIPIENT ID CODE/NAME PD2-1 LA CROTEAU,R INTERNAL: AEOD/SPD/RAB NRR/DE/EMCB NUDOCS-ABSTRACT RES/DSIR/EIB COPIES LTTR ENCL 1
1 1
1 1
1 ~ILE CONTE 0 1 1
1 NRR/DE/EMEB 1
1 OGC/HDS 3 1
1 COPIES LTTR ENCL 1
1 1
1 1
1 1
0 EXTERNAL: LITCO ANDERSON NRC PDR 1
1 1
1 NOAC 1
1 D
M N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL
- DESK, ROOM OWFN 5DS (415-2083)
TO ELIMINATE YOUR NAME 'FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 13 ENCL 12
0 I+I
~
II I
4
I=PL OCT 0 6 1995 L-95-268 10 CFR 50.36 Stewart D. Ebneter Regional Administrator U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323
Dear Mr. Ebneter:
Re:
Turkey Point Unit 4
Docket No. 50-251 Steam Generator Tube Plugging Inservice Ins ection Re ort The Turkey Point Unit 4 steam generators were inspected from October 14, 1994 through October 17, 1994.
There were no steam generator tubes plugged as a result of this inspection.
In accordance with. Technical Specification 4.4.5.5, the attached report summarizes the results of the steam generator tube inservice inspection.
Should there be any questions, please contact us.
Very truly yours, T. F. Plunkett Vice President Turkey Point Plant OIH cc:
- USNRC, Document Control Desk, Washington, D.C.
T. P. Johnson, Senior Resident Inspector,
PDR,.ADOCK 05000251.
9 PDR I
4i
<Qi
\\