UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 VA U T ON Y T OFF C
OF NUCL CTOR REGULATION N
SOC D
U S
S FO S
C IONPRO PAN F
DA OW R
ND L G
Y U
Y PO U
T OS.
4 DOCKET NOS.
50-250 ND 50-1 1.1 JIIIOOU 1 I
The Technical Specifications for Turkey Point Nuclear Power Plant, Units 3 and 4, state that the inservice inspection of the American Society of Hechanical Engineers (ASHE) Code Class 1, 2, and 3 components shall be performed in accordance with Section XI of the ASHE Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50.55a(g),
except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i).
10 CFR 50.55a(a)(3) states that alternatives to the requirements of paragraph (g) may be used, when authorized by the NRC, if (i) the proposed alternatives would provide an acceptable level of quality and safety or (ii) compliance with the specified requirements would result in hardship or unusual difficulties without a compensating increase in the level of quality and safety.
Pursuant to 10 CFR 50.55a(g)(4),
ASHE Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASHE
- Code,Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components,"
to the extent practical within the limitations of design,
- geometry, and materials of construction of the components.
The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASHE Code incorporated by reference in 10 CFR 50.55a(b) on the date 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein.
The applicable edition of Section XI of the ASHE Code for the Turkey Point Nuclear Power Plant, Units 3 and 4, Third 10-year inservice inspection (ISI) interval is the 1989 Edition.
The components (including supports) may meet the requirements set forth in subsequent editions and addenda of the ASHE Code incorporated by reference in 10 CFR 50.55a(b) subject to the limitations and modifications listed therein and subject to Commission approval.
9soeoeoove 9sose~
pDR ADQGK 05000250 8
I g
k r
I i0 i~
Ilk V-4 4y yE V
~ %
Pursuant to 10 CFR 50.55a(g)(5), if the licensee determines that conformance with an examination requirement of Section XI of the ASME Code is not practical for its facility, information shall be submitted to the Commission in support of that determination and a request made for relief from the ASHE Code requirement.
After evaluation of the determination, pursuant to 10 CFR 50.55a(g}(6)(i}, the Commission may grant relief and may impose alternative requirements that are determined to be authorized by law, will not endanger life, pr dperty, or the common defense and security, and are otherwise in the public interest, giving due consideration to the burden upon-the licensee that could result if the requirements were imposed.
In a letter dated September 9,
1993, Florida Power and Light Company submitted to the NRC its Third Ten-Year ISI Program Plan and associated requests for relief for the Turkey Point Nuclear Power Point, Units 3 and 4.
Additional information was provided by the licensee in its letter dated May 31, 1994.
2.0 EVALUATION AND CONCLUSIONS The staff, with technical assistance from its contractor, the Idaho National Engineering Laboratory (INEL), has evaluated the information provided by the licensee in support of its Third Ten-Year Interval Inservice Inspection (ISI)
Program Plan and associated Requests for Relief for Turkey Point Nuclear Power Plant, Units 3 and 4.
Based on the information submitted, the staff adopts the contractor's conclusions and recommendations presented in the Technical Evaluation Report (TER) with the exception of Requests for Relief Nos.
RR-02, RR-09, and RR-10.
With respect to RR-02, the contractor's TER recommends authorization of the licensee's proposed alternative provided the licensee demonstrate that the ultrasonic technique is capable of detecting circumferentially oriented outside surface flaws.
As an additional condition for the staff to authorize the licensee's alternative of performing an inside surface ultrasonic examination in lieu of an outside surface examination, the ultrasonic technique must be capable of detecting and sizing 'circumferentially and axially oriented surface connected flaws such that no flaw accepted for continued service could exceed the Code allowable crack dimension before the next scheduled examination.
NRC approval of this demonstration is not
- required, but the demonstration may be subject to inspection.
The licensee has committed to provide additional information regarding Requests for Relief Nos.
09 and 10.
The two requests will be evaluated in a separate report.
Based on the contractor's review of the subject ISI program, no deviations from regulatory requirements or commitments were identified in the Turkey Point Nuclear Power Plant, Units 3 and 4, Third Ten-Year Interva/ ISI Program Plan.
Requests for Relief Nos.
RR-OI, RR-03 (with the exception of the of the terminal ends of piping at the inlets and outlets of RHX assembly),
and RR-l3 are granted pursuant to 10 CFR 50.55a(g)(6)(i).
The alternative contained in Request for Relief No.
RR-07 (Parts I and 2), is authorized pursuant to 10 CFR 50.55a(a)(3)(i).
Request for Relief No.
RR-6 is denied and RR-04 will be evaluated by others in a separate report.
The alternatives contained in Requests for Relief Nos.
RR-02, RR-05, RR-OB, RR-ll, and RR-12 are authorized pursuant to 10 CFR 50.55a(a)(3)(i) with conditions.
The proposed alternative contained in RR-02 is authorized with the additional condition noted above.
The proposed alternative contained in RR-05 is authorized provided that the Category 8-D reactor pressure vessel nozzles examinations are no more than 10 years (as defined in paragraph IMA-2430) between exaginations.
The proposed alternative in RR-08 is authorized provided that a lOX sample of integral attachments in each Code Class is scheduled for examination.
The proposed alternative contained in RR-11 is authorized provided the licensee remove at least one bolt, closest to the source of leakage, and perform a VT-I visual examination as part of the evaluation.
The proposed alternative contained in RR-12 is authorized provided that the licensee meets the requirements of IMA-5260 for any pressure tests performed at pressures or temperatures exceeding nominal operating pressure.
Pricipal Contributor:
T. HcLellan Date:
March 31, 1995
C
/PI
'1