Notification of Significant Licensee Meeting 90-65 W/Util on 900524 to Discuss Nonconservative Main Steam Line High Flow Setpoints & Incorrect Emergency Gas Turbine Generator Testing
ML17348B490
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/18/1990
From: Haverkamp D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
EA-90-084, EA-90-84, NUDOCS 9005290250
Download: ML17348B490 (3)


Text

MAY i 8.1990 U.S.

NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING No. 90-65 EA No. 90-84 Licensee:

Faci 1 ity:

Docket No:

Time and Date:

Location:

Purpose:

NRC Attendees:

Northeast Nuclear Energy Company Millstone Nuclear Power Station Unit 1

50-245 1:00 p.m.,

May 24, 1990 USNRC Region I, King of Prussia, Pennsylvania Division of Reactor Projects (DRP) Conference Room Enforcement Conference regarding Nonconservative Main Steam Line High Flow Setpoints and Incorrect Emergency Gas Turbine Generator Testing (50-245/90-05)

J. Wiggins, Director, Division of Reactor Projects, DRP E. Wenzinger, Chief, Projects Branch No. 4, DRP J.

Dure, Chief, Engineering Branch, Division of Reactor

Safety, DRS N. Blumberg, Chief, Operational. Programs
Section, DRS S. Stewart, Acting Chief, Reactor Projects Section 4A, ORP A. Vegel, Reactor
Engineer, Reactor Projects Section 4A, ORP W.
Raymond, Senior Resident Inspector, Millstone Station, ORP D. Dempsey, Resident Inspector, Millstone Unit 1, ORP A. Wang, Project Manager, PDI-4, NRR Licensee Attendees:

W. Romberg, Vice President Nuclear Operations, Northeast Utilities Service Company (NUSCo)

S.

Scace, Nuclear Station Director, Millstone J. Stetz, Nuclear Unit Director, Millstone Unit 1

P. Przekop, Instrumentation and Controls Manager, Millstone Unit 1

P. Blasioli, Licensing Supervisor,'USCo P. Miner, Licensing Engineer, NUSCo J.

Festa, Instrumentation and Controls Supervisor, NUSCo Note: This meeting is closed to the public due to the subject matter.

Attendance by NRC personnel at this meeting should be made known by May 23, 1990, via telephone call to S. Stewart, Region I, at FTS 8-346"5227.

Prepared by:

onald R.

averkamp, C

ef PS 4A /4

~(~)5

2 Distribution:

J.

M. Taylor, Executive Director for Operations J.

Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

H.

Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)

B.

K. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J.

Lieberman, Director, Office of Enforcement T.

E. Murley, Director, Office of Nuclear Reactor Regulation W. T. Russell, Associate Director for Inspection and Technical Assessment, NRR B. Boger, Assistant Director for Region I Reactors, NRR J. Caldwell, Regional Coordinator, EDO M. Boyle, Millstone 1 Project Manager, NRR J. Stolz, Director, Project Directorate I-4, NRR G. Vissing, Millstone 2 Project Manager, PD-I4, NRR W. Bateman, NRR Public Document Room (PDR)

Local Public Document Room (LPDR)

State of Connecticut