ATTACHMENT 3 PROPOSED TECHNICAL SPECIFICATION Marked-up Technica1 Spec9.83.cabal.on Pages:
4 3/4 3-19 3/4 3-20 3/4 3-28 3/4 3-29 3/4 3-33a 9204240036 920421 PDR ADOCK 05000250 P
.L
~I
TABLE 3.3-2 Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEH INSTRUMENTATION FUNCTIONAL UNIT TOTAL NO.
OF CHANNELS CHANNELS TO TRIP HINIHUH CHANNELS OPERABLE APPLICABLE HODES ACTION 6.
Auxiliary FeedwaterNN (Continued) b.
Stm.
Gen. Mater Level 3/steam Low-Low generator 2/steam generator in any steam generator 2/steam generator 1, 2, 3
15
. c.
Safety Injection See Item 1.
above for all Safety Injection initiating functions and requirements.
d.
Bus Stripping 1/bus 1/bus 1/bus 1, 2, 3
23 e.
Trip of All Hain Feed-water Putaps Breakers 1/breaker 7.
Loss of Power (1/breaker)
(1/breaker) 1, 2
/operating
/operating pump pump 23 a.
- 4. 16 kV Busses A and B
2/bus (Loss of Voltage) 2/bus 2/bus 1, 2, 3, 4
18 b.
480 V Load Centers 2 per load 3A, 3B, 3C, 30 and center 4B 4C, 4D 2 on any load center 2 per load 1, 2, 3, 4 18 center egraded Voltage Coincident with:
Safety Injection See Item 1.
above for all Safety Injection initiating functions and requirements
TABLE 3. 3-2 Continued ENGINEERED SAFETY FEATURES ACTUATION SYSTEH INSTRUHENTATION FUNCTIONAL UNIT TOTAL NO.
OF CHANNELS CHANNELS TO TRIP HINIHUH CHANNELS OPERABLE APPLICABLE HODES ACTION 7.
Loss of Power (Continued)
- c. '80 V Load Centers 3A, 3B, 3C, 3D and A
4B 4
4D 2 per load 2 on any 2 per load 1, 2, 3, 4
18 center load center center o ta e
egra ed 8.
Engineered Safety Features Actuation Systee Interlocks a.
Pressurizer Pressure 3
1, 2, 3
1, 2, 3
19 b.
T Low Control Rooa Ventilation Isolation a.
Automatic Actuation Logic and Actuation Relays b.
Safety Injection 19 9.
1, 2, 3, 4,6*" 16 1, 2, 3, 4 6"" 16 Containaent Radio-2 activity--High Containment Isolation 2
Hanual Phase A or Hanual Phase B
C.
d.
1,2,3,4 17 See Item l. above for all Safety Injection initiating functions and requirewents.
1 1
e.
Control Room Air Intake Radiation Level Al l 24
7Cm Cl
~ FUNCTIONAL UNIT I
~7.
Loss of Power (Continued)
~b.
480V oad Centers Qe Degra e
o ge Load Center TABLE 3.3-3 (Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEH Z
S ALLO@ANCE TA TRIP SETPOINT ALLONBLE VALUES 3A 3B 3C 39 4A 4B 4C 4D Coincident with:
Safety Injection and
[
]
f
[
]
[
]
f ]
f
[ ]
[
see item 1
[ ][ ]
] f
]
[ ] [ ]
][
1
[1[ ]
[ ][ ]
[
] f
]
] f ]
430Vi5V (10 sec t 1 sec delay)[ ]
438Vi5V (10 sec t 1 sec delay)[ ]
434Vi5V (10 sec f 1 sec delay)[ ]
434V15V (10 sec i 1 sec delay)[ ]
435Vi5V (10 sec i 1 sec delay)[ ]
434VL5V (10 sec a 1 sec delay)[ ]
434V15V (10 sec t 1 sec delay)[ ]
430V%5V (10 sec t 1 sec delay)[ ]
See Item l. above for all Safety Injection Trip Setpoints and Allowable Values.
Diesel Generator Breaker Open N.A.
N.A.
TABLE 3.3-3 (Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEH Cl
~FUNCTIONAL UNIT I
~7.
Loss of Power (Continued) c.
8 V oad C nters egra e
ol a Load Center
,3A 3B 3C 3D 4C 4D Coincident with:
Diesel Generator Breaker Open ALLOWANCE TA N.A.
Z S
]f ]
f ]f ]
f ]f ]
f lf ]
[ ]f ]
[ ][ ]
[.] [
[ ]f ]
N.A. N.A TRIP SET POINT 424ViSV(60 sec delay) 427VXSV(60 sec delay) 437VXSV(60 sec delay) 435visv(60 sec delay) 430ViSV(60 sec delay) 436ViSV(60 sec delay) 434VxSV(60 sec delay) 434viSV(60 sec delay)
N.A.
ALLOWABLE VALUEi sec i30
[
]
[
]
sec i30
[
]
[
]
[
]
[
]
[ ]
[
]
TABLE 4.3-2 (Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEH INSTRUHENTATION HNS CHANNEL CHECK CHANNEL FUNCTIONAL UNIT 6.
Auxiliary Feedwater (Continued)
TRIP ANALOG ACTUATING NODES CHANNEL DEVICE FOR NICH CHANNEL OPERATIONAL OPERATIONAL ACTUATION SURVEILLANCE CALIBRATION TEST TEST LOGIC TESTS IS RE UIRED c.
Safety Injection See Itea l. above for all Safety Injection Surveillance Requireaents.
d.
Bus Stripping e.
Trip of hll Hain Feedwater Puap Breakers.
7.
Loss of Power a.
4.16 kV Busses A
and.B (Loss of Voltage) b.
480V Load Centers 3A,3B,3C,3D and
- '4A 4B 4C,40 Degra d
N.h.
N.h.
N.A.
N.h.
N.A.
N.A.
N.A.
N.A.
H(1)
N.A.
N.A.
N.A.
N.A.
1, 2, 3
1, 2
1, 2, 3, 4 1,2,3,,4 Coincident with:
Safety Injection c.
480V Load Centers 3A,3B,3C,3D and 4
4C D
Degra d
o age See Itea 1. above for all Safety Injection Surveillance Requireaents.
S R
N.A.
H(1)
N.A.
1, 2, 3, 4
.0