L-91-171, Forwards Annual Update of Topical QA Rept (Tqar),Consisting of Changes to Tqar,Per 900612,marked-up Version of Tqar Last Submitted,Reflecting Changes Made & Current Tqar,Including Revs Issued Through Rev 25
| ML17348A932 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/10/1991 |
| From: | Geiger J FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17348A933 | List: |
| References | |
| L-91-171, NUDOCS 9106170066 | |
| Download: ML17348A932 (146) | |
Text
<<'VACCELERATED DISTRIBUTION DEMONSTPATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS).
ACCESSION NBR:9106170066 DOC-DATE: 91/06/10 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit. 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME
'UTHOR AFFILIATION GEIGER,J.'E.
Florida Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET 05000250 05000251 R
'I SUBJECT': 'Forwards annual update of topical QA rept (TQAR),consisting of changes to TQAR,per 900612,marked-up version of TQAR last submitted, reflecting changes made 6 current TQAR,including revs issued'hrough Rev 25 dtd 910605.
DISTRIBUTION CODE:
Q004D COPIES RECEIVED:LTR J ENCL i SIZE:
6 TITLE: QA Topical Report, Amendment, or Correspondence+Docket/Utz sty Speci NOTES A
RECIPIENT ID CODE/NAME PD2-2 LA INTERNAL: NRR DLPQ/LPEB10 EXTERNAL IHS COPIES LTTR ENCL 1
1 1
1 2
2 1
1 RECIPIENT ID CODE/NAME AULUCK,R OC/LFMB RGN2 FILE NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
D S
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISfS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
A D
D S
~ ~
0 1'
pp P.O.
o 14000,JunoBaach,FL 33408-0420 JUNE I 0 )99)
L-91-17 1 10 CFR 50.54(a) 10 CFR 50. 71 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 Gentlemen:
Re:
Turkey Point, Units 3 and 4
Docket Nos.
50-250 and 50-251 St. Lucie Units 1 and 2
Docket Nos.
50-335 and 50-389 To ical ualit Assurance Re ort FPLT AR 1-76A Pursuant to 10 CFR 50.54(a)(3),
attached is the annual update of the Florida Power 6 Light Company Topical Quality Assurance Report (TQAR).
Enclosure I includes a
summary of the changes made to the TQAR since June 12, 1990.
Enclosure II is a marked up version of the TQAR last submitted showing the changes that have been made.
Enclosure III is the current TQAR which includes all revisions issued through Revision 25 dated June 5, 1991.
All changes have been reviewed by the Quality Assurance Department and it has been concluded that these changes do not reduce the commitments in our program description which has been previously accepted by the NRC.
Should there be any questions, please contact us.
ry trul
- ours,
.E.
ei er Vice President Nuclear Assurance JEG/TCG/vmg Enclosure cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant 9106170066 910610 PDR ADOCK 05000250 R
~i ~
- 3. M
. MQ U c3 4 an FPL Group company
Florida Power
& Light Topical Quality Assurance Report Change Summary
- June, 1991 ENCLOSURE X
Summary of changes to the Florida Power and Light Topical Quality Assurance Report (FPLTQAR 1-76A) 1.
Table of Contents Each revision The Table of Contents has been revised at each revision of a portion of the TQAR to reflect the most recent revision of all documents within the TQAR.
2.
T R 1.0 Or anization Rev.
16 to Rev.
17 This revision changed the Company Nuclear Review Board's collection of
- plans, goals, and responsibilities from "charter" to "policy."
e 3.
T R 1.0 Or anization Rev.
17 to Rev.
19 A typographical error was made in this revision in that Revision 18 was skipped. Rather than cause confusion by having a Revision 18 issued after the issue of Revision 19, a letter to file was issued explaining that Revision 18 does not actually exist.
The responsibilities of the Director of Nuclear Engineering now include control over the. FPL Welding Program rather than a supporting role.
Nuclear Administrative Services are now under the control of a
Manager rather than a Director.
An operation's analysis responsibility has been added.
Personnel and human resource related responsibilities have been deleted.
4 ~
T R 1.0 Or anization Rev.
19 to Rev.
20 This revision reflects the extensive organization changes made throughout Florida Power
& Light Company.
The Chairman of the Board and Chief Executive Officer now has ultimate responsibility for the execution of the Quality Assurance Program.
Reference to the President Nuclear Division as the Executive Vice President or Senior Vice President have been removed to reflect Technical Specification changes.
Page 1 of 4,
V 4
J
The Director Nuclear Construction Services now reports to
. the Senior Vice President Nuclear Operations.
The responsibilities within this organization are the same as when it reported to the Vice President Nuclear Engineering and Licensing.
The Safety Engineering Groups at Turkey Point and St. Lucie now report to the Chairman of the Company Nuclear Review Board.
Director Nuclear Engineering, Manager Turkey Point Engineering, and Manager St.
Lucie Engineering are responsible for engineering aspects of FPL's nuclear power plant projects.
The Turkey Point Engineering Manager and the St.
Lucie Engineering Manager are responsible for on-site engineering support.
The Director Nuclear Engineering is responsible for engineering projects originating at the corporate offices.
Nuclear Engineering responsibilities have been revised to include the establishment of procurement standards; the review and approval of procurement documents for safety related materials and equipment; and nuclear fuel related activities.
Site Material Management. responsibilities have been reduced to include only Purchasing and Warehousing activities.
Procurement Engineering activities are now the responsibility of Nuclear Engineering.
Project Controls and Nuclear Information Management now report to the Vice President Nuclear Engineering and Licensing.
Project Controls responsibilities are primarily in the area of cost and scheduling.
Nuclear Information Management is responsible for Nuclear Division data processing information systems excluding process applications.
The statement that the Quality Manager Juno Beach is responsible for assuring the quality of safety related items and
- services, and their vendors has been deleted.
These responsibilities
- are, in
- fact, distributed among the organizations responsible for'tem and service procurements and receipt inspections.
Nuclear Administrative Services has been renamed Nuclear Analysis and Controls and reports to the President Nuclear Division. Its responsibilities include budget, cost control, and business planning.
The Environmental Affairs Department has been restructured to include a Manager Hazardous Substances Regulation; Manager New Construction Licensing and Planning; Air and Water Permitting and
- Programs, a
Chief Ecologist and an Environmental Page 2 of 4
5.
Toxicologist.
The Power Supply Department has been renamed Protection Control Systems and has assumed the responsibilities previously assigned to the System Protection Group and the Power Supply Technical Services Group.
It The Computer Operations Department has been combined with Client Services and Quality Management under the Vice President of Information Management to provide mainframe computer support.
T R 2.0 ualit Assurance Pro ram Rev.
9 to Rev.
10 Periodic audits of the Quality Assurance Department and Program are now conducted by an independent audit group under the direction of the Vice President of Nuclear Assurance rather than the direction. of the Chairman of the Company Nuclear Review Board.
6.
T R 11.0 Test Control Rev.
2 to Rev.
3 On June 12, 1990 the entire Topical Quality Assurance Report was reissued due to organizational changes that affected most TQR's.
TQR 11.0 was not affected by this revision.
- However, a
typographical error was made on its reissue that changed the title from "Test Control" to "Control of Measuring and Test
,Equipment."
Revision 3
changed the title back to "Test Control."
7 ~
A endix A Fi ure 1-1 Or anization of De artments Affectin Quualit r Rev.
16 to Rev.
17 8.
Page 1 of 1 was revised to reflect the changes described in TQR 1.0, Rev.
19, affecting the Nuclear Administrative Services Department.
A endix A Fi ure 1-1 Or anization of De artments Affectin ituualit r Rev.
17 to Rev.
18 Revised to reflect the new organizational structuredescribed in TQR 1.0, Revision 20.
v 9.
A endix A
Fi ure 1-2
Turke Point Nuclear Site Or anization Rev.
3 to Rev.
4 Revised to reflect the new organizational structure at Turkey Point Nuclear Plant as described in TQR 1.0, Revision 20.
10.
A endix A
Fi ure 1-3 St Lucie Plant Units 1
2 Site Or anization Rev.
4 to Rev.
5 Revised to reflect"'he new organizational structure "at St.
Page 3 of 4
0 0
Lucie Nuclear Plant as described in TQR 1.0, Revision 20.
~
~
~
11.
A endix C Baseline Document Matrix Rev.
8 to Rev 9
8 This revision corrected a typographical error that resulted in a
reference to Regulatory Guide 1.130 as the endorsing document for ANSI N45.2.4-1972, rather than Regulatory Guide 1.30. In addition,,paragraph 6.2.1 is now quoted rather than paraphrased.
0 Page 4 of 4
Florida Power
& Light Topical Quality Assurance Report Change Summary
- June, 1991 ENCLOSURE II Marked up version of portions of the last Florida Power and Light Topical Quality Assurance Report (FPLTQAR 1-76A) submitted showing changes that have been made.
0
TOPICAL'UALITYASSURANCE REPORT ORGANIZATION TQR 1.0 Ray NRC Mark-up Date 6/10/91 Page of The Florida Power & Light (FPL) organizational structure shall be defined such that the responsibilities for establishment and implementation of the Quality Assurance Program are clearly identified. The authority and duties ofindividuals and organizations performing quality assurance and quality control functions shall be described, and shall illustrate the organizational independence and authority necessary to identify problems; to initiate, recommend, or provide solutions; and to verify implementation of solutions. In addition, the description shall illustrate that persons or groups responsible for verifying the correct performance of an activity are independent of the person or groups responsible forperforming the activity.
PI F The FPL President Chairman of the Board and Chief Qpem4g Executive Officer is ultimately responsible for the execution of the Quality Assurance Program for FPL nuclear power plants. The authority for developing and verifying execution of the program is delegated to the President Nuclear Division,
, and the Vice President Nuclear Assurance, The reporting relationship ofeach department involved with the Quality Assurance Program is shown in Appendix A.
To provide for a review and evaluation ofQuality Assurance Program policies and activities, the PR President Nuclear Division has established the Company Nuclear Review Board (CNRB). This organization's responsibilities are defined in Section 1.2.1.3.a.
In addition, a Quality Assurance Program Review Committee (QAPRC) has been established to review changes to the Quality Assurance Program and to provide an interface forquality matters in each department affecting quality. The QAPRC is an interdepartmental organization with the responsibility to review and resolve recommended changes to the Quality Assurance Program.
This committee is administered by the Quality Assurance Services group. Quality Assurance Program changes reviewed by the QAPRC are reviewed and signed by the department heads or individuals listed on each Quality Procedure.
t )
gl I
qP 0
TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 Ray NRC Mark-up Date 6/10/91 Page of A Quality Assurance Program Review Committee (QAPRC) Member shall be designated by the head of each department or organization.
The QAPRC Member is the prime interface for coordination of quality-related matters within the member's department, with the Quality Assurance Department, and with other departments.
The head ofeach department or organization performing quality-related activities is responsible for: a) identifying those activities within the organization which are quality-related as defined by the Quality Assurance Program; b) establishing and clearly defining the duties and responsibilities ofpersonnel within his organization who execute those quality-related activities; and c) planning, selecting, and training personnel to meet the requirements of the Quality Assurance Program.
The responsibility, authority, and organizational relationship for performing quality-related activities within each organization shall be established and delineated in organizational charts and written job or functional descriptions.
The organization charts in Appendix A illustrate the lines ofauthority and areas ofresponsibility for each of the organizations that are involved in quality-related activities. Below are listed the departments and organizations that have Quality Assurance responsibilities.
Specific organizational responsibilities for implementation of the Quality Assurance Program are described in the corresponding sections.
121 l
r i 122 r
r n
1.2.1.1 Nuclear Operations 1.2.1.2 Nuclear Engineering and Licensing 1.2.1.3 Nuclear Assurance 1.2.1.4 21 1
44 Seabees-Analysis and Controls 1.2.2.1 Corporate Secretary Corporate Records Documentary Files 1.2.2.2 Environmental Affairs 1.2.2.3 ~P R Control Systems 1.2.2.4 Information Management
a P
0
'4 I'
APL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 Rey NRC Mark-up Date 6/10/91 Page 3
of 1.2.1 Throughout plant life, the Nuclear Division maintains control of and responsibility for nuclear power plant design, preoperational and start-up testing, operation, maintenance, refueling, and modification ofthe plant in accordance with written and approved procedures.
The President Nuclear Division has overall responsibility for the Nuclear Divisions's activities.
.Reporting to the President Nuclear Division are: the Senior Vice President Nuclear Operations, Vice President Nuclear Assurance, Vice President Nuclear Engineering and Licensing, and the XAreeter.
Manager Nuclear
. Analysis and Controls.
1.2.1.1 Nuclear Operations The Senior Vice President Nuclear Operations is responsible for nuclear power production.
Reporting to the Senior Vice President Nuclear Operations are the Vice President-Turkey Point Plant, Vice President-St. Lucie Plant, Manager Nuclear Security, Manager Nuclear Training, and Manager Nuclear Racy~ Services and Director - Nuclear Construction Services.
a.
The Vice President-St. Lucie Plant and Vice President-Turkey Point Plant are accountable for the operation, maintenance, and modification of their respective nuclear plant, as well as the selection, development and direction of the assigned staff. They willact as liaison between the plants and corporate headquarters, and are accountable for ensuring that company policies and procedures are properly implemented and continued at the nuclear site.
Reporting to the Plant Vice President are the Plant Manager, the Services Manager, the Hg*Mg,gggg'g-Pl gi ig~
Also, the Plant Vice President has functional responsibility over the Site Construction Services Manager, aalu the Site Engineering PajeetManager, and the Site Materials Management Superintendent providing work direction to those groups.
'g 1
I 0
0
TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 Ray.
NRC Mark-up Date 6/10/91 Page 4
of The Plant Manager - PSL and Plant Manager - PTN, through the respective Plant Vice President, are responsible for the operation ofthe nuclear plant.
The Plant Nuclear Safety Committee (PNSC) at Turkey Point Plant and the Facility Review Group (FRG) at the St. Lucie Plant are comprised ofkey plant management and staff personnel as described in the plant Technical Specifications.
The PNSC/FRG serves the plant manager in a technical advisory capacity for the review of all safety-related procedures and activities that impact plant safety and the facilityoperating license.
b.
The Manager Nuclear Training prepares policy documents regarding nuclear training and provides support to secure the necessary resources to ensure that Nuclear Division personnel are adequately trained. They must have adequate technical and job-related skills to provide safe and efficient operation while complying withNRC requirements.
c.
The Manager Nuclear Security is responsible for coordinating the overall development and implementation ofthe FPL nuclear security program d.
The Manager Nuclear @aery Services is accountable for technical staff support to the Nuclear Operations Department and certain centralized special functions.
This group consists of section supervisors and technical specialists, with functions including Health Physics, Chemistry, Radiological Waste, and Emergency Planning.
e.
The Director - Nuclear Construction Services is responsible for directing and administering effective management of the department to ensure compliance to the corporate
- policies, practices and procedures; and providing qualified construction support personnel to the Site Construction Services Managers.
A l1 0
0
TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 pay.
NRC Mark-up Date 6/10/91 paga 5
Of 30 Reporting to the Director - Nuclear Construction Services are the Manager Construction Control and the Site Construction Services Managers.
The Manager Construction Control is responsible for:
monitoring budget performance against planned engineering activities as budgeted by the Construction Services organization; monitoring the efficient utilization of resources expended against Construction Services budgeted activities; and ensuring economic utilization of capital construction equipment at all Construction Services locations.
The Site Nuclear Construction Services Manager is responsible for:
o completing the assigned project in compliance with technical and other project specifications, and for the application of the provisions of the Quality Assurance Manual during the project; o
obtaining corrective action (along with Nuclear Materials Management) from contra'ctor's management and, when necessary, exercising the authority to stop work on project activities adverse to quality.
Reporting to the Site Construction Services Manager are the Lead Construction Supervisors.
The Lead Construction Supervisor is responsible for conformance of project construction activities to the requirements of specifications,
- codes, regulations and site procedures.
The Lead Construction Supervisor supervises the construction personnel assigned to the project, and coordinates construction activities, including the assignment of construction personnel.
pe II II 0
0 0
FPL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION P
TQR 1.0 Ray NRC Mark-up Date 6/10/91 page 6
pf 30 The overall responsibility for Plant Changes and Modifications to operating plants is defined in each plant's Technical Specifications.
The work of installation and administration of Plant Changes and Modifications can be assigned to Nuclear Construction Services.
The Site Construction Services Manager will report to the Director
- Nuclear Construction Services; however, the appropriate Plant Vice President has functional responsibility over the Site Construction Services Manager by providing work direction.
Project Team Members are appointed by their home department heads as the departmental representative on the respective project, when requested by the Site Construction Services Manager.
Team Members, other than Quality Assurance, report functionally to the Site Construction Services
- Manager, but continue to receive administrative support and technical direction from their home department.
Team members are responsible to the Site Construction Services Manager for home department support to the project.
Activities affecting quality may be performed by FPL or contracted.
Should any of these functions be contracted, the contractor may perform the activities under his own Quality Assurance Program, which must have prior approval 'by FPL Quality Assurance, or the contractor may directly adopt the requirements of the FPL Quality Assurance Manual. If the
, contractor implements the Quality Control function directly to the FPL Quality Assurance Manual requirements, the contractor's Quality Control Supervisor shall have the authority and freedom to administer the Quality Control program.
I 4
0 lJ i4 yl 0
TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 Ray NRC Mark-up Date 6/10/91 Page 7
of Nuclear Engineering and Licensing The Vice President Nuclear Engineering and Licensing is responsible for nuclear plant
- design,
', materials management and maintaining the operating licenses.
Reporting to the Vice President Nuclear Engineering and Licensing are the Director -,
Nuclear Engineering, Manager
- Turkey Point Engineering, Manager
- St.
Lucie Engineering, Director - Nuclear Licensing, Director - Nuclear Materials Management, Manager
- Information Management and Manager - Project Controls.
a.
Nuclear Engineering Department The Nuclear Engineering Department includes personnel located at both nuclear sites and at the corporate office.
Nuclear Engineering performs design-related activities and delegates design-related activities to qualified contractors.
For activities performed by Nuclear Engineering, the work is governed by FPL's Quality Assurance Program, and Nuclear Engineering is responsible for approval of the design output.
Delegated activities are performed in accordance with an FPL approved Quality Assurance Program and the contractor is responsible for approval of design output. Nuclear Engineering is responsible fordefining the scope ofdelegated activities and the responsibilities of the contractor.
Prior to the release of design outputs by contractor organizations, Nuclear Engineering ensures that the contractor is technically qualified to perform the design-related activity.
TheDirector-NuclearEngineering, Manager - Turkey Point Engineering and the Manager - St. Lucie Engineering directe theengineering aspects ofallFPL nuclear power plant projects during construction and operation to assure efficient, economical and reliable power plant design, conformance with engineering schedules
It H
,r (1
~ $
0 seC I\\
@PL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 Bey NRC Mark-up pate 6/10/91 Page of and budgets and compliance with regulatory requirements.
The Manager - Turkey Point Engineering and Manager
- St. Lucie Engineering are responsible for on-site engineering support to the nuclear units.
The Director-Nuclear Engineering is responsible for engineering projects and support at the Corporate Nuclear Engineering Office.
Project Managers are assigned to provide overall management and control of designated projects as required by the Vice President
- Engineering and Licensing.
The Nuclear Engineering Department is responsible for:
power plant design-related aspects of the FPL Quality Assurance Program throughout all phases of plant life. This responsibility extends from initial engineering evaluations of plant design-related site characteristics, through preliminary and detailed design, construction, operation and decommissioning; development and maintenance of the design control program governing design-related activities performed by Nuclear Engineering and for providing technical support to the Quality Assurance Department for assessing the adequacy, implementation and effectiveness ofcontractor design control programs; the preparation, revision, approval and distribution ofplant design records that are identified to be maintained as "as constructed" drawings during plant operation; the development, control, and performance of certain aspects of items and services procurement, including establishment of procurement standards, the technical evaluation, equivalency evaluation, and commercial grade dedication ofreplacement parts/components for nuclear plants. This also includes review and approval of procurement documents for safety related materials and equipment, as well as configuration control activities forcontrolled design documentation associated with the procurement of items;
N g
C
'wr e4 0
@PL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 Bey.
NRC Mark-up Date 6/10/91 page 9
of forecasting FPL's nuclear fuel requirements and the availability of nuclear fuel; determining sources of supply, evaluating alternatives, and negotiating and establishing arrangements with suppliers for acquisition, processing and delivery of nuclear fuel and related services for the nuclear fuel cycle; assuring that technical and quality requirements (including inputs from other FPL departments) are incorporated in fuel contracts and letters of authorization, and that these documents have the necessary approvals; administering and managing contracts for nuclear fuel and related services to assure that technical and quality obligations are met, and serving as FPL liaison in all matters of nuclear fuel and fuel-related contracts; administering and managing spent fuel disposal contracts with Department of Energy and serving as FPL liaison in matters of nuclear fuel and high level waste disposal; performing the project management function with respect to fuel
, management,
- design, licensing, delivery and other technical aspects of nuclear fuel; fer-all fuel related design, analyses, reviews, and technical assistance necessary to ensure the safe, reliable, and economic operation of the nuclear plants; the optimization of nuclear fuel cycle economics within nuclear safety and operating constraints, as well as providing fuel related information, such as forecasts of nuclear fuel requirements to support licensing and regulatory requirements;
I E
lf'l 4 ~
14/
0 U
H 0
TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 Bey NRC Mark-up Date 6/10/91 page 10 of the development and/or review offuel and nuclear physics design; implementing and maintaining the FPL corporate nuclear material accountability program as outlined in the FPL Special Nuclear Material Control Manual; providing support to the Quality Assurance Department for their auditing of nuclear fuel design and fuel assembly manufacturing; performing audits and coordinating accountability reporting on all nuclear fuel; developing and providing, to appropriate FPL groups, information necessary to determine FPL's fuel-related costs and to finance fuel-related expenditures.
providing technical support of activities associated with component reliability, materials evaluations, inspections, corrosion protection, non-destructive examination, and ASME Section XI implementation/problem resolution for nuclear plant components; providing specific component expertise, metallurgical support, and non-destructive examination and inspections; o
establishing the FPL Welding Program to meet the requirements of the Quality Assurance Program and applicable codes and standards;
'I h
N I
ps
FPL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 Rey.
NRC Mark-up Date 6/10/91 page 11 0f developing, maintaining, and controlling the FPL Welding Control Manual to implement the FPL Welding Program; originating and qualifying welding procedure specifications; and providing technical direction to personnel within the FPL Welding Program.
- b. Nuclear Licensing Department The Nuclear Licensing Department is responsible for:
o Nuclear Division corporate interface with the NRC; o
Nuclear Division corporate administrative point ofcontact with INPO; o
Managing NRC safety and regulatory issues and developing effective strategies to resolve them; o
Advising senior Nuclear Division management on a regular basis of important developments in licensing areas which could significantly affect the Nuclear Division; o
Providing Nuclear Division licensing hearing and legal services; o
Providing corporate licensing support and guidance to onsite licensing organizations; o
Administering the Nuclear Problem Reporting System; o
Administering the Commitment Tracking System; o
Administering the Operating Experience and Feedback System.
c.
Nuclear Materials Management Department Tp N
\\
M M
p Dp i
p apl* p procurement, negotiation, and administration of contracts (except nuclear fuel),
purchase and control of materials, and the administrative duties required to support these functions.
Reporting to the Director Nuclear Materials Management are the Manager Nuclear Contracts, and the Superintendents Site Material Management (Turkey Point and St. Lucie).,
H Y
P
FPL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 pey.
NRC Mark-up Date 6/10/91 p,g, 12 Og 30 1)
Nuclear Contracts Depmmeat
%nuclear Contracts Pep muscat. is responsible for generation, negotiation and issuance of contracts and purchase orders for services associated with repairs, constructors, construction managers, Architect Engineer (A/E) and consulting services, and material and equipment as required to support Nuclear Division support staff. Nuclear Contracts is also responsible for assuring that technical and quality requirements developed by others are incorporated into the procurement documents which it authorizes and that these documents have the required approvals.
Services for nuclear safety-related applications are secured only from approved suppliers, or commercial grade, as applicable. Nuclear Contracts R is responsible for maintaining traceability of procurement document records until transmitted to an approved storage facility.
2)
Site Material Management The Site Superintendents Material Management (Turkey Point and St. Lucie) are responsible for the procurement and control of FP~Nuclear Division's materials and equipment.
Site Material Management consists of Purchasing and Warehousing.
Purchasing is responsible for the procurement of materials and equipment by FPL for its nuclear power plants with the exception of Nuclear Fuels; Materials and equipment for nuclear safety-related application are secured only from approved suppliers, or as commercial grade, as applicable.
Purchasing is responsible for assuring that technical and quality requirements developed by others are incorporated in the procurement document which itauthorizes, and that these documents have the required approvals. Itis responsible for maintaining traceability of procurement document records until transmitted to an approved storage facility.
N h,,t4 t."
~
0 0
TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 Rev.
NRC Mark-up Date 6/10/91 page 13 of 0
Warehousing is responsible for the receipt, handling, storage, shipping and issue of materials and equipment received at the plant site for control by Site Material Management.
This responsibility encompasses
- material, parts and components for plant equipment through all phases of plant life. During operations, Warehousing also performs additional quality-related activities such as handling and segregation for nonconforming items received for material control.
e Ol pI DL 5
8 IA C0Z Ol Ol E
0IL
9 'f' A
'1 1
i I
f~t
FPL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 Rev.
NRC Mark-up Date 6/10/91 Page 14 Df 30 Ol CO L'
Vl COz Olpl N
EI0 U
H P
~
t f
0
TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 ftay.
NRC Mark-up Date 6/10/91 page 15 pf 30 CO D
5 Vl C0Z Cl CV C
0L
II sr a
I, V ega P'
~t' 0
TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 pey.
NRC Mark-up Date 6/10/91 page 16 pf 30 Ch CO 0z Cl CV E
0 LL.
r
~f'I~
'4 I
~
~
1 Qg%
0 0
FPL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0
- Rey, NRC Mark-up Date 6/10/91 page 17 of
- d. Project Controls Department The Project Controls Department is, responsible for:
Coordinating the establishment of scope baseline for the Nuclear Engineering, Nuclear Materials Management, and Nuclear Licensing Departments.
Developing estimates for the
- scope, and annually establishing budgets for the work to be performed.
Monitoring cost and schedule performance.
Reforecasting costs and schedule based on performance history and emergent trends.
Providing management with corrective action recommendations, and implement same into revised
- scope, cost, and schedule baselines.
- e. Nuclear Information Management Department CO OC 5
C0Z Cl N
C 0IL The Nuclear Information Management Department is responsible for the identification,
- design, development, implementation, on-going maintenance, and control of all Nuclear Division data processing information systems excluding process applications.
This encompasses the following accountabilities:
Et
~
II eu
)
t r$
0
FPL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 pey.
NRC Mark-up Date 6/10/91 page 18 of 30 0
direct the development, implementation, and on-going maintenance of information management systems; coordinate and direct the computer hardware and telecommunication planning and control within the Nuclear Division; ensure that the Nuclear Division's Information Management Program is in full compliance with software quality assurance regulations and guidelines; administer and control system access; execute software production release and change control activities; administer physical databases and provide on-going technical support.
1.2.1.3 Nuclear Assurance Department The Vice President Nuclear Assurance is responsible for the selection, technical direction, administrative control (e.g. performance appraisal, salary review, hire/fire, position assignment) staffing, training and development of personnel required for supervisory and operating continuity of the Quality Assurance Department, Nuclear Safety Speakout Group and CNRB administrative support. The Vice President Nuclear Assurance also initiates QA Program policy changes when necessary.
In addition, the Vice President Nuclear Assurance is responsible for selecting a team independent of the Quality Assurance Department to perform periodic audits of the Quality Assurance Department.
The results of these audits are presented to the Vice President, Nuclear Assurance and the CNRB.
Reporting to the Vice President Nuclear Assurance are the Manager Nuclear Safety Speakout, the Site Quality Manager - Turkey Point, the Site Quality Manager - St. Lucie, the Quality Manager - Juno Beach, and for administrative support, the CNRB Chairman.
a.
Company Nuclear Review Board (CNRB) gg C
p yN y
R y
B
- ddCNRBy, p
yg P~P id Nuclear Division, is comprised of executive level members of management with
E
~
4 pà i
~
FPL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 Rey.
NRC Mark-up Date 6/10/91 page 19 of responsibilities for the execution of the Quality Assurance Program. The CNRB reviews, or directs the performance ofreviews of, activities concerning the technical aspects of the operating nuclear power plant insofar as they impact on plant safety, the health and safety of the public, and laws, regulations and licensing commitments.
In addition, audits of these areas are performed under the cognizance of the CNRB.
The CNRB composition is described in Section 6.0 of each facility's Technical Specifications and in its current 4~er-policy.
Subjects within the purview of the CNRB are listed in the appropriate plant Technical Specifications.
The CNRB has the authority to carry out its responsibilities by way ofwritten action letters, verbal directions, meeting minutes or appointed subcommittees.
Where necessary, the CNRB may use consulting services to perform required reviews.
The CNRB is responsible for reviewing and evaluating Quality Assurance Program policies and activities. Quality Assurance Program status reports shall be periodically prepared by the Quality Assurance Department and routed to the members of the CNRB for review.
CNRB meetings shall be held by the Chairman to keep members apprised ofconditions including significant problems that require management attention. Periodic audits of the Quality Assurance Department shall be performed by a team independent of the Quality Assurance Department.
The results of this audit are presented to the Vice President Nuclear Assurance and the CNRB.
The Chairmen of the Independent Safety Engineering Groups, at Turkey Point and St. Lucie, report to the Chairman of the CNRB.
,P IL 0
II
FPL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 pay NRC Mark-up Date 6/10/91 page 20 of b.
Quality Assurance Department The Quality Assurance Department shall be responsible for administering the FPL Quality Assurance Program, This includes developing and verifying implementation of corporate policies, plans, requirements, and procedures affecting quality. This is accomplished through the Quality Assurance Department.
The Quality Assurance Department retains responsibility for delegated portions of the Quality Assurance Program by performing initial evaluation and subsequent periodic audits of the contractors'uality Assurance Programs.
The Quality Assurance Program responsibility further extends to the performance of audits within the Company to assure management that the established requirements and procedures are being implemented, and that the Program complies with the baseline document requirements.
The organizational freedom of the Quality Assurance function is accomplished through the corporate structure, illustrated in Appendix A, which provides independence from those departments responsible for design, procurement, engineering, construction and operation.
With quality assurance as its sole function the Quality Assurance Department, both on-site and off-site, is completely free from the cost and scheduling pressures ofdesign, procurement, construction and operation. The Quality Assurance Department has the freedom and authority to: a) identify quality problems; b) initiate, recommend or provide corrective action; c) verify implementation of the corrective action; and d) recommend the stoppage of work or operations adverse to quality, when necessary.
The Quality Manager - Juno Beach, the Site Quality Manager - St.
Lucie and the Site Quality Manager - Turkey Point report administratively and functionally to the Vice President Nuclear Assurance.
These reporting relationships assure that the Quality Assurance Department has direct access to the levels of management necessary to assure effective implementation of the Quality Assurance Program.
F H
H Il JaI Wash h'I l'
FPL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 pay.
NRC Mark-up Date 6/10/91 Page of The Quality Manager - Juno Beach directs and administers the Corporate Quality Assurance Program, including developing and verifying implementation ofpolicies, plans, requirements, procedures and audits which assure compliance with the baseline documents listed in Appendix C of this Topical Quality Assurance Report.
The duties, responsibilities, and authorities of each Quality Assurance group are described in the sections which follow.
1)
Quality Assurance Services Group Quality Assurance Services, reporting to the Quality Manager - Juno Beach, consists of the Quality Assurance Systems and Audits Group, the Quality Assurance Procurement Group, and the NDE Level III.
Quality Assurance Systems and Audits is responsible for the development and maintenance of the overall Quality Assurance Program, including the following:
o develop and maintain the Quality Assurance Department Quality Instructions, Quality Assurance Department Training & Organization Manual, and the corporate Quality Assurance Manual; including the administration of the Quality Assurance Program Review Committee (QAPRC) o assist other departments in the development of Quality Instructions by review and comment and through interpretation of corporate Quality Assurance requirements; o
develop and implement a Quality Assurance indoctrination program forFPL personnel, and a training program for the Quality Assurance Department; o
prepare reports on Quality Assurance Program activities for review by the Company Nuclear Review Board;
L I
TOPICAL QUALITYASSURANCE REPORT TQR 1.0 ORGANIZATION Rev.
NRC Mark-up Date 6/10/91 Page 22 0f 30 o
maintain a file system for documentation of quality assurance activities performed by the Quality Assurance Department; o
review Regulatory Guides, Codes, SAR Document Commitments and Standards for impact on the Quality Assurance Program and recommend appropriate program changes; o
review documents submitted to the Company Nuclear Review Board (CNRB) as requested by the Quality Assurance Department CNRB member, o
plan, coordinate and implement a comprehensive system ofperiodic internal audits with support from the other Quality Assurance groups, when necessary; o
review FPL originated design specifications for inclusion of appropriate quality requirements.
Quality Assurance Procurement is responsible for assuring the quality of safety-related items and services, and their vendors, including the following:
o assist in the development and implementation of policies,
- plans, requirements and procedures for the requisition and purchase of materials, equipment and services related to nuclear power plants and to the acceptance and storage ofequipment and material; o
perform appropriate surveillance ofhardware during manufacture; o
develop and implement a program for auditing of supplier Quality Assurance/Quality Control programs including architect/engineer/ Nuclear Steam Supply System Suppliers; o
assure design-related activities performed by the Architect Engineer meet the quality aspects ofthe contract; o
review and approve FPL procurement documents and changes to these documents to assure that the necessary quality requirements are imposed; o
assist other FPL departments in the identification of quality problems associated with procurement and storage; initiate, recommend, or provide solution; and verify implementation of solutions;
N 1
4 p1
FPL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 fey.
NRC Mark-up Date
'6/10/91 page 23 Of 30 o
review, approve and periodically audit the execution of FPL contractor quality assurance programs; o
maintain a file system for documentation of quality assurance activities performed by the Quality Assurance Procurement group; o
evaluate the Quality Assurance capability of suppliers requested by the Nuclear Materials Management Department and maintain the Quality Assurance Department "Approved Suppliers List".
The responsibility ofthis group, in terms ofphases ofprocurement, begins with h
p p
h f h p
d d
d gh~
contract.
receipt of shipment or performance of This group, through audits and surveillances, assures that the contractors'rganizations performing Quality Assurance functions have sufficient authority and organizational freedom to implement effective Quality Assurance programs.
The NDE Level IIIis responsible for technical direction and monitoring the NDE activities performed by Quality Control at the plant sites (PTN and PSL). He is responsible for preparation, revision and implementation of NDE procedures, and the training, testing and qualification of NDE personnel performing these activities, He is also responsible for providing the programs and direction for performance of NDE activities meeting the ASME, AWS and other NDE code requirements.
2)
Site Quality Assurance Groups - Turkey Point Nuclear (PTN) and St. Lucie (PSL) 2 Ol CV C
0L
It 4"
t 0
0 0
TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 frey.
NRC Mark-up Date 6/10/91 Page 24 of Quality Assurance activities at the plant sites (PTN and PSL) are accomplished by the respective site Quality Assurance Groups, reporting to the Site Quality Manager. The Site Quality Manager has responsibility for on-site development and implementation of the Quality Assurance Program, including the following:
o coordinate 4 the development and implementation of policies, plans, requirements, and procedures for portions of the quality assurance program related to the operation and modification of nuclear power plants at the plant site; o
perform audits, assessments and other observations. as specified in procedures and instructions to verify compliance with Quality Assurance Program commitments, identify quality problems and'ensure timely corrective actions are taken in the areas ofplant operation, system turnover, modification and maintenance; including such areas as refueling, inservice inspection and testing, procurement of spare/replacement parts, material storage, health physics, chemistry, plant security and fire protection; o
identify requirements, ensure inclusion of commitments in documents and verify implementation of the Quality Assurance Program during construction activities at the plant site thiough audits ofFPL and contractor organizations; o
recommend stoppage of work or operations adverse to quality at the plant site in accordance with the appropriate Quality Procedures; o
review and comment on Quality Instructions or equivalent quality-related administrative procedures prior to issue, with respect to the requirements of the FPL Quality Assurance Program, the applicable Final Safety Analysis Report, and the applicable Technical Specifications; o
assure that the status is tracked for all open items identified by the Site Quality Assurance group, and inform appropriate management when there is an indication that a commitment willnot be met on time; o
maintain a file system for documentation of quality assurance activities performed by the Site Quality Assurance group; o
review backfit procedures with respect to the FPL Quality Assurance Program (for procedure review requirements see TQR 5.0);
I' f
4 h
aq(
0 pl, 0
@PL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 Rey.
NRC Mark-up Date 6/10/91 Page 25 of o
review site generated FPL procurement documents and changes to procurement documents in accordance with the appropriate Quality Procedures; o
perform audits of the architect engineer and Nuclear Steam Supply System suppliers both on-site and off-site, in conjunction with the Quality Assurance Procurement group.
The interface with the Quality Assurance Procurement group ends with the receipt of a shipment ofnuclear safety-related equipment at the plant site. The Quality Assurance program for the shipment is then within the purview of the Site Quality Assurance group.
The Quality Manager - Turkey Point and Quality Manager - St. Lucie are additionally responsible for the establishment and implementation of quality control aspects of the Quality Assurance Program at the plant site.
Reporting directly to the Site Quality Manager is the Quality Control Superintendent who has the authority and freedom to administer the Quality Control program and, when necessary, to stop activities adverse to quality.
The Quality Control Superintendent, his staff, and personnel performing Quality Control inspection functions are required to be independent of groups or persons performing activities that they may be required to verifyor inspect. Quality Control efforts include preparation and review ofplant procedures, PCMs, and quality-related instructions
- Quality Control personnel are also responsible for inspection, monitoring, surveillance, and review of plant activities to verify compliance with the provision of the facilityoperating license and the Quality Assurance Manual. Inspections are also performed to assure that backfit activities meet the requirements of engineering drawings, specifications, codes and standards.
This responsibility extends from receipt inspections of material on-site to acceptance of the installed items prior to turnover to the Plant.
It also includes verification ofconformance of an item or activity accomplished during this period to quality requirements (e.g., records review, NDE, inspections).
The Quality Control Superintendent shall take corrective action for
l il l
I x i 0
0 TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 ngy NRC Mark-up Date 6/10/91 p,g, 26 Di 30 deficiencies identified, where applicable, and shall followup on corrective action taken by other organizations until close out.
Off-site interfaces for the resolution ofquality-related problems and NRC items are with Nuclear Corporate Staff, FPL support departments as indicated in this Topical Quality Assurance Report, the architect engineer and the Nuclear Steam Supply System (NSSS) Quality Assurance Department.
The Site Quality Assurance group interfaces with the Plant Vice President and his staff on-site by assisting in the resolution ofquality-related problems.
c.
Nuclear Safety Speakout The Manager Nuclear Safety Speakout has responsibility for the management and implementation of the Nuclear Safety Speakout Program. 'Speakout provides a forum for employees and contractors to communicate their concerns to FPL. Concerns are documented, investigated and corrective actions are taken when necessary.
The program offers confidentiality. Reporting to the Manager Nuclear Safety Speakout are the Turkey Point and St. Lucie Speakout Supervisors.
1.2.1.4 Nuclear Analysis and Controls The Direeter-Manager Nuclear Analysis and Controls, reporting to the President Nuclear Division, is responsible for coordinating the budget, rate, and cost control support to the plants and staff organizations; and coordinating Division business planning, target setting and monitoring of key performance indicators, and operations analysis activities.;
W 4'
C l"
0
APL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0
- Ray, NRC Mark-up Date 6/10/91 page 27 of 30 1.2.2 Providing support activities for the Nuclear Division are the Corporate Secretary, Environmental Afff,~P <<f g
g gy dtf f Mg.h*p fg ff hfpf h
department is described in the followingsections and is shown in Appendix A.
1.2.2.1 Corporate Secretary Reporting to the Corporate Secretary are the Manager Corporate Records Services and the Supervisor Documentary Files.
a.
Corporate Records Services The Manager Corporate Records Services is responsible for: ensuring the Quality Assurance records program activities are managed in accordance with applicable laws and regulations; assisting with the development and implementation of effective and compatible records and micrographics programs; developing, approving and maintaining record retention schedules; establishing parameters for indexing in the corporate records'omputerized Record Management System (RMS); locating acceptable record storage areas when requested; storage, retrieval and control ofrecords/documents as requested by other departments; leading the evaluation of specially designated "Quality Assurance approved" storage facilities and maintaining the records ofthis evaluation.
b.
Documentary Files The Supervisor Documentary Files is responsible for receiving, maintaining, retrieving and storing the Quality Assurance records in connection with licenses and contracts received from other departments.
'I
,I 0
ty
0 TOPICAL QUALITYASSURANCE REPOR ORGANIZATION TQR 1.0 goy NRC Mark-up 0~to 6/10/91 Pa e
of 1.2.2.2 Environmental Affairs Environmental Affairs is responsible for obtaining the federal and state environmental permits required for FPL facilities and operations.
Environmental Affairs is responsible for overall coordination of non-radiological environmental monitoring (federal and state) programs at the nuclear power plant sites.
The Manager Hazardous Substances Regulation, the Manager New Construction Licensing and P
d g~g*M g ~di dWg g
ling dg g, g
Chief Ecologist, and the Environmental Toxicologist report to the Director Environmental Affairs. The Director Environmental Affairs has overall responsibility for implementation of the Environmental Protection Plans at nuclear power plant sites and reports to the Senior Vice President of External Affairs.
The Environmental AffairsDepartment through its management of the Company Environmental Review Group (CERG) is responsible for overall coordination of environmental monitoring programs and requirements related to the Environmental Protection Plans. The CERG provides review of proposed changes to the Environmental Protection Plans, review of any violations of monitoring and/or limitation requirements of federal and state permits and Environmental Protection Plans and review of plant activities as described in those Environmental Affairs Department Environmental Procedures subject to QA requirements.
The CERG provides information to the Director Environmental Affairs and the CNRB Chairman on environmental matters for which requirements are included in Environmental Protection Plans.
1.2.2.3 Protection R Control Systems
I v
It tt 4
4 t(
TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 Req.
NRC Mark-up Date 6/10/91 page 29 Of 30 Sy@ein Protection & Control Systems is responsible for test, calibration and maintenance of certain high voltage electrical protective relays for safety-related systems of the nuclear plant.
Activities of System Protection & Control Systems include final wiring connection checks, preoperational check-out and test of system protection devices and providing inspection of
- dip
- d Pi di
.Addi i
p iqiii i
d providing certain setpoint and checkpoint values for protective devices.
The Director of Protection & Control Systems reports to the Vice President of Power Delivery.
i i i
M d
Information Management consists of Computer Operations, Client Services, and Quality Management reporting to the Vice President of Information Management.
The Computer Operations Department is responsible for the installation and maintenance of the operating system software and the operation'of the computer hardware for FPL's corporate computer systems.
The application programs used by the nuclear departments executes on these corporate computers.
The Manager Computer Center, the Manager Operations Support Services, and the Manager Technical Systems report to the Wire@er-Manager Computer Operations.~~eye
i Eg
TOPICAL QUALITYASSURANCE REPORT ORGANIZATION TQR 1.0 Rey.
NRC Mark-up Date 6/10/91 page 30 of Client Services is responsible for software libraries on FPL s in-house time-sharing Computer System (CMS) that are under its control.
Quality Management provides support to the Nuclear Division in their development and maintenance of computer applications in the area of software library controls.
il
~
A k
AV4 0
TOPICAL QUALITYASSURANCE REPORT TQR 2.0 Rev.
10 QUALITYASSURANCE PROGRAM 11/27/90 Page 1
of 7
2.1 Florida Power &Light Company has established a Quality Assurance Program which complies with the criteria of 10 CFR 50 Appendix B, and meets the requirements of Regulatory Guides and Industry Standards referenced in Appendix C of this report.
The Topical Quality Requirements and attached Policy Statement, together with the Quality Procedures and Quality Instructions document the Program and the FPL policy with regard to Quality Assurance.
This Program shall be instituted for each plant site in a schedule consistent with accomplishing the required activity and shall be carried out throughout the lifeofFPL nuclear plants.
The requirements of the FPL Quality Assurance Program shall only apply to nuclear safety-related structures, systems, and components as identified in the Safety Analysis Report for each nuclear unit. Additionally, the requirements of the FPL Quality Assurance Program shall apply to all FPL, contractor, or consultant organizations performing activities affecting the quality of safety-related structures, systems, and components ofFPL nuclear power plants.
Documented procedures shall require and define indoctrination and training of personnel performing activities affecting quality as necessary to assure that suitable proficiency is achieved and maintained.
Periodic program reviews of the status and adequacy of the FPL Quality Assurance Program shall be accomplished by the independent audit team described in.Section 1.2.1.3.a and by Quality Assurance Department audits.
0!
L0Z N
E 0
1 Management of organizations outside Florida Power &Light Company participating in the Program shall be required to regularly review the status and adequacy of that part of the FPL Quality Assurance Program which they are executing. The FPL Quality Assurance Department 4
shall review and concur in the Quality Assurance Program of contractors.
W
TOPICAL QUALITYASSURANCE REPORT TQR 2.0 Rev.
10 QUALITYASSURANCE PROGRAM Date 1]g7/90 Page 2
of 7
2.2 2.2.1 Goals and Objectives As stated in the Policy Statement of the President ofFlorida Power &Light Company, the goal of the FPL Quality Assurance Program is to maintain quality levels in an effective and efficient manner, and to assure the high degree of functional integrity and reliabilityof nuclear safety-related structures, systems, and components.
To meet this goal, the followingobjectives of the FPL Quality Assurance Program have been defined:
ao b.
C.
d.
e.
Define through documented procedures and instructions the quality activities that apply to the design, fabrication, procurement, modification, testing, operation, refueling, maintenance, and repair of nuclear power plants; Establish, assign, and document the responsibilities for those activities affecting quality of safety-related structures, systems, and components; Establish confidence that the design, fabrication, modification, and operation of nuclear power generation facilities are performed in a manner consistent with FPL policies by assuring quality-related activities are performed by responsible personnel; Apprise management of unresolved problems and trends which could have a significant effect on nuclear power plant safety; and Prevent schedule delays and high cost due to poor quality.
2.2.2 Program Documentation The Topical Quality Assurance Report, which defines the policy, goals, and objectives regarding the Quality Assurance Program, shall be contained in the FPL Quality Assurance Manual, and used as guidance for the development of corporate level Quality Procedures which are also contained in the Quality Assurance Manual. Revisions to the Topical Quality Assurance Report will be made, as needed, to reflect current FPL program requirements and descriptions of activities. These revisions shall be made in accordance with a Quality Procedure. Ifa program
~ I.
0
TOPICAL QUALITYASSURANCE REPORT TQR 2.0 Rev.
10 QUALITYASSURANCE PROGRAM Date 11/27/90 Page 3
of 7
2.2.2 (Continued) reflects a reduction of the commitments from the baseline documents contained in Appendix C, the revision shall be submitted to and approved by the NRC prior to implementation.
In all other cases, amendments to the Topical Quality Assurance Report willbe submitted to the NRC to reflect implemented program revisions on an annual or more frequent basis.
Quality Procedures shall be written by the department with major responsibilities for an activity, or by the Quality Assurance Department when requested.
These procedures shall be reviewed by all the departments with responsibility for some portion of that procedure, and shall be approved by the major implementing departments with co-approval by the Vice President Nuclear Assurance. Alisting ofcorporate level Quality Procedures is contained in Appendix E.
Each Quality Procedure shall be written to further address criteria contained in the Topical Quality Requirements and to further define the FPL Quality Assurance policies, plans, and program where action is required by more than one department.
Each department head shall have the responsibility for implementation ofthe Quality Assurance Program, which includes compliance with procedute requirements applicable to his department.
In addition, he shall be responsible for the preparation, approval, and distribution of Quality Instructions, operating procedures, testing procedures, or other instructions where further guidance is necessary forimplementation of the Quality Assurance Program requirements within his department.
Quality Instructions shall be reviewed by the Quality Assurance Department at each revision.
A( I r
0
TOPICAL QUALITYASSURANCE REPORT QUALITYASSURANCE PROGRAM TQR 2.0 Rev.
10 Date 11/27/90 Page 4
of 7
2.2.3 Structures, Systems, and Components The requirements of the FPL Quality Assurance Program shall apply to nuclear safety-related structures,
- systems, and components, as defined in the SAR.
Safety-related structures,
- systems, and components are listed as those necessary to assure the integrity of the reactor coolant boundary, the capability to shutdown the reactor and maintain it in a safe shutdown condition, or the capability to prevent or mitigate the consequences of accidents which could result in off-site exposures comparable to the guideline exposures of 10 CFR 100.
Control over activities affecting the quality of safety-related structures,
- systems, and components shall be to the extent consistent with their importance to safety. Such control shall include use of appropriate equipment, establishment of suitable environmental conditions, and assurance that all prerequisites for a given activity have been satisfied.
The Program shall provide for controls over special processes and skills necessary to attain the required quality, and the need for verification ofquality by inspection and test.
Advance planning is required, for the control of management and technical interfaces between FPL and contractors, during the phase-out ofdesign and construction and during preoperational testing and plant turnover.
This is achieved through periodic meetings of concerned organizations and the development of procedures which define responsibilities and interfaces, and control the testing and turnover ofplant systems to FPL.
2.2.4 Participating Organizations The FPL organizations with responsibilities for activities affecting quality of nuclear safety-related structures,
- systems, and components are identified in TQR 1.0, which also briefly describes their assigned responsibilities.
Florida Power & Light Company may delegate activities to contractor organizations and equipment vendors. Delegated activities are subject to the external organization's FPL approved Quality Assurance Program or the FPL Quality Assurance Program, or some FPL approved
0 0
TOPICAL QUALITYASSURANCE REPORT QUALITYASSURANCE PROGRAM TQR 2.0 Rev.
10 Date 11/27/90 Page 5
ot 7
combination thereof.
2.2.4 (Continued)
However, FPL shall retain overall responsibilities for the Quality -Assurance Program.
Procurement documents shall define the scope of delegated activities, as well as Quality Assurance Program requirements that shall govern these activities.
The Quality Assurance Department shall review and approve the Quality Assurance Program governing contracted activities prior to award of contract except for activities for which the output is of a conceptual and/or prototype nature.
In all cases, final approval shall occur at a point in the process to ensure that the output complies with the requirements of the FPL approved Quality Assurance Program.
The object of this review shall be to verify that the program is in compliance with the applicable requirements ofAppendix B, 10CFR50, and ANSI N45.2. Audits shall be conducted periodically to verify the acceptable implementation of the contractor's FPL approved Quality Assurance Program governing delegated activities.
The Quality Assurance Department is responsible for conducting these audits. The initialreview and periodic audits shall be performed by qualified Quality Assurance Department personnel, and as appropriate, by technical specialists from other FPL departments and contractor organizations.
2.2.5 Indoctrination and Training A program shall be established and maintained for quality assurance indoctrination, and for training which assures that the required level ofpersonnel competence and skillis achieved and maintained in the performance ofquality related activities. Quality Procedures shall delineate the requirements for an indoctrination program to assure that personnel responsible for performing quality activities are instructed in the purpose, scope, and implementation of the quality related manuals, instructions, and procedures and that compliance to these documents is a mandatory requirement.
Oi Quality Procedures shall also require the head of each department (including the Quality Assurance Department) to be responsible for a training plan which assures that personnel performing quality related activities are trained in the principles and techniques ofthe activity
0
TOPICAL QUALITYASSURANCE REPORT Rev.
TQR 2.0 10 QUAI ITY ASSURANCE PROGRAM 11/27/90 Page 6
of 7
2.2.5 (Continued) being performed.
This,training shall maintain the proficiency of personnel in the skills necessary for the quality related activities through retraining, requalification or reexamination, as appropriate. When personnel are assigned to perform their functions under the direction of personnel from other than their home department, the department head of the organization providing direction is responsible for the indoctrinaton and training of personnel who perform quality-related activities under his direction. Quality Procedures shall specify the requirements for documenting indoctrination and training sessions, including a course description, attendance, location, and date.
2.2.6 Management Participation In addition to the involvement of department heads in implementing the Quality Assurance Program within their departments and the involvement of the Vice President Nuclear Assurance and the Quality Manager - Juno Beach in the development, coordination, and review of the Program, the Company Nuclear Review Board (CNRB) shall be apprised of the status and adequacy of the Quality Assurance Program on a periodic basis. The following actions shall be instituted to assure that the CNRB remains informed and meets its Program responsibilities:
ao b.
C.
The CNRB shall review a summary of the results of management level Quality Assurance audits ofFPL Departments.
The Quality Assurance Department shall circulate monthly reports of quality-related activities to members of the CNRB and affected department heads.
The monthly reports may include such items as the status of audits, a summary of audit findings, the status of development
- projects, and descriptions of policy matters or problems requiring management attention, The CNRB shall review the status of the Quality Assurance Program on a semiannual basis.
The review will include assessment of the Program goals, objectives, and accomplishments.
TOPICAL QUALITYASSURANCE REPORT TQR 2.0 Rev.
10 QUALITYASSURANCE PROGRAM 11/27/90 Page 7
of 7
2.2.6 (Continued) d.
Periodic audits of the Quality Assurance Department and Program shall be conducted by an independent audit group under the direction of the Vice President Nuclear Assurance.
This audit group shall employ FPL audit procedures and shall distribute the audit report to the Vice President Nuclear Assurance, and to the CNRB forreview offindings and correcnve action. Auditorcertifications ofindependent audit teams willbe retained by the Quality Assurance Department.
The programs of contractor organizations that perform quality related activities shall be reviewed by Quality Assurance to assure that their management regularly reviews the status and adequacy of that part of the FPL Quality Assurance Program which they are
'xecuting.
TOPICAL QUALITYASSURANCE REPORT TQR 11.0 FPL TEST CONTROL Rev.
pate 11/20/90 Page of A test program shall be established to assure that testing required to demonstrate that structures, systems and components willperform satisfactorily in service is identified, accomplished, and documented in accordance with written procedures.
The test program shall include, as appropriate, proof tests, prior to installation, preoperational tests, start-up tests, and operational tests, and retest followingrepairs, replacements or modifications.
Test Program Testing requirements shall be identified in the engineering/design documents, SAR documents, procedures, or procurement documents, as appropriate.
Retest following repairs, replacements, or modifications shall be performed in accordance with the original design and test requirements or acceptable alternatives.
Retest shall be performed when the original test results are invalidated.
Quality Procedures and Quality Instructions shall be written which delineate the methods and responsibilities for controlling, accomplishing, and documenting testing.
FPL may delegate the implementation of all or any part of the test program to other organizations but shall retain ultimate responsibility for the program.
The contractor shall be required to control, perform and evaluate tests in accordance with written procedures and shall be required to prepare a written test program detailing the testing required.
~ E
)li 0
0
TOPICAL QUALITYASSURANCE REPORT TQR 11.0 TEST CONTROL Rev.
Date 11/20/90 FPL page 2
of Test Procedure Preparation and Test Performance Testing shall be accomplished in accordance with written approved test procedures which incorporate or reference the requirements and acceptance limits in the applicable design and procurement documents.
The test procedure or test program documents shall include the following as a minimum:
ao Instructions for the testing method used; b.
Required test equipment and instrumentation; c.
Test requirements and acceptance criteria; d.
Hold, witness, inspection and data collection points; e.
Test prerequisites such as: calibrated instrumentation; trained, qualified, and licensed or certified personnel; preparation, condition and completeness ofitem to be tested; suitable and controlled environmental conditions.
f.
Methods for documenting or recording test data and results; g.
Test records shall identify:
1)
Inspector or data recorder, 2)
Method or type ofobservations; 3).
Test or inspection results; 4)
Statement ofacceptability; 5)
Date ofobservation; and
f 0
TOPICAL QUALITYASSURANCE REPORT TQR 11.0 FPL Rev.
TEST CONTROL Daie 11/20/90 page 3
of Test Procedure and Test Performance (Cont'd) 6)
Deficiencies and nonconformances, and the action taken in connection with these deficient conditions, either by inclusion or by reference to other documents.
Evaluation ofTest Results The documented test results shall be evaluated against the predetermined acceptance criteria by a group or individual having appropriate qualifications.
The acceptance status ofthe test shall be documented.
Deficiencies noted during the evaluation shall be documented and dispositioned in accordance with approved Quality Procedures or Quality Instructions.
The evaluation of the test results may be delegated to other organizations; however, FPL shall retain the responsibility for the evaluation. The evaluating organization shall be required to use qualified personnel, evaluate the data against predetermined criteria, and document the results of the evaluation and acceptance status of the test.
i h
'CIKNIP VICE PAESKENT RIPCANATNN MANACEMENT VICEPRESOBIT POWER DELIVERY SEE FKKIRE
'11 PAGEROFR SEE FME 11 PAGER Cf R SEE FKKIRE 1.1 PACERCF R SEE RGURE 11 PAGEROFR SBCCA VICEPRESDBIT.
IRICLFAAOPERATKNS OIAECT44IWIACER IAKLFAR ACMSaSSRATI4i
~ANALYMS S CONTROL SPECEIC STE CAGANZATlON TIAG. 14 SPECEIC SITE OAGAfARATKN TIFKL14 MANACEA ST. LUCIS DIONEERSIC DKIECTOR IKKLEAAMATERALS MANAGEMENT ST. LOCK TOPICALQUALITYASSURANCE REPORT ORGAMZATIONOF DEPARTMENTS AFFECTING QUALITY FIGLSE 1.1 APPENDIXA NUCLEARDMSION OEFICY91 PAGES OF 2
OSECfOI
~AOtPtV INTEClXN5 CONT%X. 5TATOAI 4COIAAAQCII IlAAACAA CVOTT 5NV455 TOPICALQUAUTYASSURANCE REPORT NRC MARKUP
~t88555 AIW5 WATgl 55AWTTWC 110CAAWI ORGANIZATION OF DEPARTMENTS AFFECTING QUAUTY RGURET'I APPENDIXA SUPPORT DEPARTMENTS PAGE2OF2
'lg Q
STE CONST AUCTNN SNVCES IIANAGER I
T I
STE NATEAJALS IIANACGIENT sfsERHTEJEJENT FRE PAOTECTJCH SUPGlV5OR ~
LEADAAZARDOJS WASTE COORO MTOAP IUNT JAJCLFAR SAFETY Ccuu ffTEE OPNATJCHS SJPNHTINDQIT IAJCLFAR'SSESSIIENTI ODNPLIANCE sfrfldfffDCIPIICPt TECHWCAL SJPGl HTENDENT (TEOINCAL DEPARTNBIT su EAY5ofrt PAS ASST.
SUPERHTEND BIT ASSSIANI OPNAMNS SUPERHTQIDENT ASS5IAN TEOHCALDEPARTNQIT SUPERVISOR OUTAGE NANAGER OPS I VAHT COCRD MTCR HTEGRATED SOKSLE PROD RAN MANGER REACTOfl ENGHIERS SVSTBIS QAIANCBIENT CCCAD HATCH ASSSTANT PUNT SUPGMSN IAJCLEAA SVSIIN PEAFOANANCE S%'NVSCR DESIGN CCHTHOLSJPGiv50fl TAAHHG EUPEAJNTTNDQIT ASSSTANT SUPER HTEMJENT HSTSAIQIT ANDCONTRCL IHSTIIJNQIT ANDCONTRCL su FNY5ofr)
ASMTANT SJPERHTBIDQIT NCCHAJDCJL NAJNTENANCE SUPERHTINDBIT ELECTRJCJL WJNTENANCE RAN COORDMTOR ENNGQICY PUJPIHG TEOI DATA~G OPNATOR SVSTQIS
ANALYSTS IAJCLEARWA'fCH ENDNEER IAJCLFAR CONTROL CQIIEAOPERATOR (AOJ UJAJCINSTD OPERATORS WATER TREATNENT fLANTCOORDHATOR TAAHHGSUPPORT SUP GlvlSOR NAJNTISPEC TRAHHGSUPERVSOA ASSSTANT SUPERHTENDQIT PlhfelED NNTENANCE
'- Indicates poslion wlh acocfaftabittbs hf Technical Specificatbra Where mul'pb titbs occur, the fifstpositioni5ted shel act in the capacty DI the other isted titbs.
0 Temporarily re ports to Licensing Superintendent when the Services Manager Nuclear positions vacant.
TOPICALGUAUTYASSURANCE REPORT TURKEYPOINT NUCLEAR STE ORGANIZATION 8GURE1 2 APPENCIX A NRCMARKUP PAGETOF I
t 0
O SIIEENCNEIRNC QTECQNSTRUCRON IAAIANRESQURCES PIMIT MANACEA swow'ITIC'EIIT afIIACCS MANACER SERYDESMINACER MANAGER WClEAfl'ONTRACT QDQET a ccsT ADMNSIRATEH FftPIOTECTKaf S SAIETY PRQCBXNKS S CRAPISCS sUpERvrscR OPERATORS QSERNTENXNT'DMNSIRATIYE COCIONATCR SUPERvrscR
%ACTCA ENCNEER OPERATICNS TRANNCPICCRAM SUPERVISOR MANTISPECNLTY TRANNCPRXRAM SUPERVISOR PIANT TEST QNERVDQA ASQSTANT SUPOWKIDENT NST%KNT AI8CONTfKL INSTISIMENTa CCNTAX QSEFIYADITI ASQSTANT SUPER NTEIAXNf MEOIAICCAL MANTENANIE'ECONQIAEsr ENYICtnKIRAL a ADMNISTRATIVE QPEfMSOR OQNTRQL CENTER OFERATCR ECI APPENOX II CCUNTNCRXAII WASTE~
ISEICENSEO OPERATORS WTPISfP TOUSHER SIPERYECA oUALITYASSURANCE REPORT ST. LUCIE PLANT(UNITS 14 2 SITE ORGANIZATION RGURE 14 APPENDIXA 06/IIVSI PAGE 1 OF 1
'- Indicates positon with accountabittesin Techrical Speciicatons.
Where lrarhpte tttesocorr, the trsl peNon tsted shat actin the capacity of Ihe other fated ides.
1, IJ 0
P I
'l 0
PICAL QUALITYASSURANCE REPORT APPENDIX C FPL BASELINE DOCUMENT MATRIX Rev.
Date Page of This topical report contains the program requirements for Florida Power & Light Company's Quality Assurance Program.
The Quality Assurance Program is described in detail in the Florida Power &Light Company Quality Assurance Manual.
The Regulatory Guides, codes, and standards specifically listed in the matrix of this appendix (on page 2) represent the baseline documents used in the preparation of FPL's QA Manual and this topical report.
These documents, therefore, provide the basis for the FPL QA Program, but they are not considered to be part of the QA Program unless specifically addressed in the applicable SAR, technical specifications, etc.
The FPL Quality Assurance Pmgram meets the requirements of the documents referenced in this appendix. Any alternatives or clarifications made to the requirements contained in these documents are stated on pages subsequent to the second page ofthis appendix.
I
'C 0
OPICAL QUALITYASSURANCE REPORT APPENDIX C
@PL BASELINE DOCUMENT MATRIX Rev.
Page 12/14/90 2
23 of lldZJJ2 REFERENCE INDUSTRY DRAFT REV.
10 CFR PART 50, APPENDIX B 10 CFR PART 50.55a 2/19/75 ANSI-N45.2 1971 ASME B&PVCode Specified in the Section III&
SAR document of XI the respective plant Regulatory Guide 1.8 Rev.
1 Regulatory Guide 1.28 Regulatory Guide 1.30 Regulatory Guide 1.33 Rev. 2 Regulatory Guide 1.37 Regulatory Guide 1.38 Rev. 2 Regulatory Guide 1.39 Rev. 2 Regulatory Guide 1.58 Rev.
1 Regulatory Guide 1.64 Rev. 2 Regulatory Guide 1.74 Regulatory Guide 1.88 Rev. 2 Regulatory Guide 1.94 Rev.
1 Regulatory Guide 1.116 Regulatory Guide 1.123 Rev.
1
'egulatory Guide 1.144 Rev.
1 Regulatory Guide 1.146 9/75 6/7/72 8/1 1/72 3/16/73 5/77 9/77 9/80 6n6 10n6 4n6 6n6 7/77 9/80 8/80 ANSI-N18.1 ANSI'/ANS 3.1 ANSI-N45.2 ANSI-N45.2.4 ANSI-N18.7 ANSI-N45.2.1 ANSI-N45.2.2 ANSI-N45.2.3 ANSI-N45.2.6 ANSI-N45.2.11 ANSI-N45.2.10 ANSI-N45.2.9
'NSI-N45.2.5 ANSI-N45.2.8 ANSI-N45.2.13 ANSI-N45.2.12 ANSI-N45.2.23 1971 1978 1971 1972 1976 1973 1972 1973 1978 1974 1973 1974 1974 1975 1976 1977 1978 0!
v
,yE V
gt
OPICAL QUALITYASSURANCE REPORT APPENDIX C APL BASELINE DOCUMENT MATRIX Rev.
Page 12/1 3
23 of Florida Power 8c Light Company position regarding conflicting guidance and exceptions:
T ARA n'x N
The Regulatory Guides and industry standards listed in Appendix C to the Topical Quality Assurance Report take precedence over any Regulatory Guide or industry standard which may be referenced in any one ofthese documents.
R I
i 1
Rv1ANIN1
-1 AN AN 1 PL-2 ANSI N18.1 describes the training and education requirements for plant staff positions and is endorsed by Reg. Guide 1.8 with an exception.
That exception is the requirements for the Supervisor - Radiation Protection.
ANSI N18.1 is invoked by Technical Specifications (Appendix A of the Facility Operating License) at the Turkey Point plants and PSL-1, ANSI/ANS 3.1-1978 is invoked by Technical Specification at PSL-2.
Reg. Guide 1.8 is also invoked by Technical Specifications at our St. Lucie plant and a license amendment has been approved for our Turkey Point plant to specify the Health Physics Supervisor qualifications addressed in Reg. Guide 1.8.
To avoid duplication of requirements, FPL willaddress Plant Staff Qualifications in only the Technical Specifications.
R l
4 24-ANSI N45.2.4-1972, Paragraph 2.3 addresses installation specifications and requires the inclusion of inspection and test objectives. FPL maintains that test values and inspection scope are inherently contained in the applicable procedures.
ANSI N45.2.4-1972, Paragraph 6.1.2 requires that the inspection of installed equipment verify that "good and proper workmanship" has prevailed.
FPL maintains that acceptable parameter compliance with codes and standards along with company preference is the verification of "good and proper workmanship".
d N
.S.'>>
A, P%
OPICAL QUALITYASSURANCE REPORT APPENDIX C FPL BASELINE DOCUMENT MATRIX Rev.
pate 12/14/90 Page of ANSI N45.2.4-1972, Paragraph 6.2.1 ~requires that
" "Items requiring calibration shall be tagged or labeled on completion indicating date of calibration and identity of person that performed the calibration." In lieu of tagging or labeling marking equipment, FPL has chosen to control calibration of installed instrumentation and control equipment by maintaining records for each piece of equipment by instrument tag number (or equivalent) to show that established schedules and procedures for calibration have been followed.
R I
i 1
Rv2AN IN1
-1 FPL's method of addressing Paragraphs 4.0, 5.2.2, 5.2.15 and 5.3 of ANSI 18.7 - 1976 as modified by Regulatory Guide 1.33, Rev. 2 is covered in Section 6 of each individual plant's Technical Specifications.
ANSI N18.7-1976, Section 4.3, requires that personnel performing the independent review and audit be specified in number and technical discipline. This standard is invoked by the Technical Specifications (Appendix Aof the Facility Operating Licenses) which have been approved forthe FPL nuclear plants at St. Lucie and Turkey Point. Specifically this function is performed by the Company Nuclear Review Board (CNRB) identified in Section 6.5.2 of the Technical Specifications.
To avoid duplication of requirements, FPL will address the personnel and functions of this independent review and audit only in the Technical Specifications.
FPL's method of addressing Section 5.2 of ANSI N18.7-1976, as modified by Regulatory Guide 1.33, Rev. 2, is by administratively controlling licensed operator hours on shift and by our Duty Call Supervisor system, Further, FPL has developed a response to NUREG 0654 which provides staffing availability.
FPL's method of addressing Paragraph 5.2.8 of ANSI N18,7-1976, as modified by Regulatory Guide 1.33, Rev. 2, is covered in Section 4 of each plant's Technical Specifications.
2l C I-1 gh ag
, C+
~ 4'J
OPICAL QUALITYASSURANCE REPORT APPENDIX C FPL BASELINE DOCUMENT MATRIX Rev.
Oate Page of FPL's method of addressing Paragraph 5.2.9 of ANSI N18.7-1976, as modified by Regulatory Guide 1.33, Rev. 2, is covered in 10 CFR 73 and each plant's Security Plan, and as such is not included in the Quality Assurance Program.
Chemical cleaning is not presently controlled as a special process per se; however, the requirements of ANSI N45.2.1-1973 and Regulatory Guide 1.37 dated 3/16/73 are part of the FPL QA Program and are met in our program.
FPL proposes these requirements to be an alternative to the requirements of ANSI N18.7-1976, Paragraph 5.2.18.
Further, TQR 9.0, Paragraph 9.2 explains the review ofpotential special ptocesses and determination oftheir status as special processes, e
FPL meets the intent of Section 5.2.19.3 ofANSI N18.7-1976 as modified by Regulatory Guide 1.33, Rev. 2, as applied to significant changes to operating procedures, by the technical review of the procedure change by knowledgeable plant professionals, by the safety review of the procedure change by the on-site facilityreview group, by the regulatory and QA review of the procedure by plant Quality Control, by training the licensed operators in the change through the training report system, and by trained, licensed operators using the revised operating procedure and observing the proper result. In addition, procedure changes willbe reviewed to assure 10 CFR 50.59 requirements are met.
Paragraph 5.3.5(4) - Clarification - When FPL uses vendor manuals and drawings which provide adequate instructions for maintenance, these documents are attached or referenced with Plant Work Orders which are reviewed and approved by Supervisory and Quality Control personnel and are considered to be adequate procedures in themselves.
These vendor manuals and drawings, when mceived at site, are controlled documents and changes to the applicable sections and instructions of these documents require the same level of review and approval as the operating procedures.
Appendix A of Regulatory Guide 1.33 lists "typical safety related activities which should be, covered by written procedures".
Regulatory Guide 1.33 is invoked by the Technical Specifications at FPL Nuclear Plants.
j'p C,'~
4J (M
P~
1$
v1' ec,'
OPICAL QUALITYASSURANCE REPORT APPENDIX C FPL BASELINE DOCUMENT MATRIX Rev.
Date 1
Page of 23 In order to avoid duplication of requirements invoked in our licensing documents, the FPL Quality Assurance Program does not list those required operating procedures specified in Appendix A.
4 2
ANSI N45.2.1-1973, Paragraph 5 states in part that, "Fitted and tackwelded joints (which will not be immediately sealed by welding) shall be wrapped with polyethylene or other non-halogenated plastic filmuntil the welds can be completed".
The FPL QA Manual shall require that the weld be covered to prevent entry of moisture and contaminants but willnot specify the material to be employed.
Materials employed to cover openings shall meet the requirements ofRegulatory Guide 1.37, Position 4.
ANSI N45,2.1-1973, Paragraph 7.1 states in part, "provisions shall be made to collect leakage and protect insulation from being wetted". FPL Quality Assurance Program includes the above requirements.
However, FPL's program allows the wetting of metallic type insulations which are not adversely affected by wetting.
ANSI N45.2.1-1973, Paragraphs 7.2,2, 7.2.3, and 7.3 address specific cleaning methods (Alkaline, Chelate, Acid) and make recommendations associated with several types ofcleaning methods.
FPL's QA manual does not specifically delineate these paragraphs.
However, the procedure developed per Paragraph 2,2 of ANSI N45.2.1 willensure that any specific cleaning method chosen willbe properly considered and controlled.
R I
4 2-2 0!
FPL willmeet the requirements of Reg. Guide 1.38, Rev. 2, Position 2C, D and E for safety related applications during preoperational and operational activities. Restrictions imposed for tapes to be color constrasting willonly be applied to the extent that these colors are dissimilar or otherwise distinguishable.
This does not preclude using other tapes when precuations are taken to ensure these tapes do not come in contact with austentic stainless steel or nickel alloy materials.
'M
'h I
'i)
OPICAL QUALITYASSURANCE REPORT APPENDIX C FPL BASELINE DOCUMENT MATRIX Rev.
Date Page of Vapor barrier material (other than metal) shall be colored to contrast with or be otherwise distinguishable fmm safety related systems to prevent undisclosed entry into the system.
These requirements do not apply to components in storage which would require removal of such tapes and barriers to effect installation.
ANSI N45.2.2-1972 Section 2.7 requires that items governed by this standard be classified into one of four levels by the buyer or the contractor.
FPL intends to consider what care is appropriate for each item individually rather than generically classifying the material into protection levels and providing care required of that level. The following shall be considered when determining the handling, storage, and shipping requirements:
1.
The vendor's recommended handling, shipping, and storage standards.
2.
Environmental requirements which may include such requirements as inert gas atmosphere, humidity limits, temperature limits, chemical requirements, acceleration (g force) requirements.
3.
Special tools or equipment which are provided and controlled as necessary to ensure safe and adequate handling. These tools or equipment shall be inspected and tested at specified times to verify that they are adequately maintained.
4.
Packaging, covering or coatings required to meet environmental requirements such as barrier and wrap material, desiccants, pipe caps, plugs, contact preservatives, etc.
5.
Container, crating, skids ofsufficient strength to support the item (including stacking).
~ i 6.
Cushioning, blocking, bracing, and anchoring to prevent movement during shipment or handling.
7.
Special handling or storage procedures for unique situations.
Pv Xr'11$
0' f7 4
n
OPICAL QUALITYASSURANCE REPORT APPENDIX C BASELINE DOCUMENT MATRIX Rev.
12/14/90 APL 8.
Marking and identification of the item and its packaging.
9.
Anticipated "shelf life"ofthe item.
Page 8
23 of FPL considers this to be a more effective approach since the quantity of spare and replacement material, parts and components governed by this standard will be afforded protection commensurate with the recommendations of Section 2.7 of this standard.
ANSI N45.2.2-1972 Sections 3.0, 4.0, and the Appendix address all the requirements applicable to the packaging and shipping of material.
FPL in general does not package or ship material governed by this standard.
Suppliers of material are required by purchase order to provide adequate packaging and shipping protection. Isolated cases ofmaterial packaging or shipping are treated on a case-by-case basis and receive protection comparable to that required by the manufacturer of that material. Loading, rigging and handling precautions identified in Section 4.3 are applied to material unloaded by FPL from a transport vehicle.
ANSI N45,2.2-1972 Section 5.2 requires that specific attributes of material and components received by FPL be inspected.
For plants with operating licenses FPL verifies conformance to procurement documents during receipt inspections.
Any of these attributes identified in these procurement documents are verified during this inspection.
ANSI N45,2.2-1972 Section 5.2, paragraph 5.2,1, requires certain preliminary inspections to be done "priorto unloading" ofmaterial which is received. We believe that the sequence specified in the standard is to facilitate commercial claims, and should these preliminary inspections occur "after unloading" that control ofmaterials quality would not be degraded.
Accordingly, required shipping damage inspections may be performed after unloading.
The requirements of ANSI N45.2.2, Paragraph 7.2 for items that require special handling instructions is clarified by FPL to be limited to those items covered in the scope of NUREG 0612, entitled "Control ofHeavy Loads at Nuclear Power Plants".
ANSI N45.2,2-1972, Paragraph 7.4 requires that an inspection program be established for handling equipment and rigging, including methods for identifying acceptable and
~
1
\\
C 1
1
OPICAL QUALITYASSURANCE REPORT APPENDIX C BASELINE DOCUMENT MATRIX Rev.
12/14/90 CPL 9
23 Page of nonconforming items.
In lieu of having a program of periodic, documented inspections of rigging and handling equipment, FPL's practice is to have the individual user determine the equipment's acceptability prior to each use. This prior-to-use inspection is exactly the same as that required during periodic inspections, and uses criteria identified in ANSI N45.2.2-1972, paragraph 7.4. This practice also precludes the need for a system to indicate the acceptability of rigging and handling equipment.
Implementation of this prior-to-use inspection willbe assured through periodic surveillances and audits performed by Quality Assurance and Quality Control.
Cranes are inspected on a periodic basis and willnot be subjected to this prior-to-use inspection.
Certain mechanical components of the PSL-2 nuclear unit have been designed for a service environment of the site area because portions of the plant are exposed to the temperature, humidity, and ocean salt spray during operations.
Extreme air temperature variations, snow or slush are not encountered during operations or in the out-of-doors storage environment.
As an alternative to the rigid requirements of storage levels B and C in paragraph 6.1 of ANSI N45.2.2-1972, FPL proposes to store these particular mechanical components outdoors, but within controlled areas, with sufficient periodic surveillances and inspections to minimize the possibility of damage or lowering of quality due to corrosion, contamination, deterioration, or physical damage.
In cases where special environmental conditions are present (i.e. hurricanes, paint sprays, concrete pours, etc.) precautions or additional steps willbe taken to further protect the items.
R I
v AN 42-1 For FPL's operating nuclear plants, alternative methods are followed to achieve equivalent objectives for the below listed sections ofANSI N45.2.3-1973:
The zone designations of Section 2.1 ofN45.2.3 and the requirements associated with each zone are not consistent with the FPL Housekeeping requirements at our operating nuclear units. In lieu of the zone designation, cleanliness is maintained at a level consistent with the work being performed, so as to prevent the entry of foreign material into safety related systems.
Documented cleanliness inspections am performed immediately prior to system closure. Control ofpersonnel, tools, equipment, and supplies is established with approved procedures when the safety function
0 A ~
Xz'h
~t4
~l
OPICAL QUALITYASSURANCE REPORT APPENDIX C APL BASELINE DOCUMENT MATRIX Rev.
Date Page of of a system, component, or item may be jeopardized and also while the reactor system is opened for inspection, maintenance, or repair.
R I
4 2
ANSI N45.2.6-1978, Paragraphs 1.1, 3.1, 3,2.2(a) and 4 (Table-1) identify requirements which apply to personnel who perform inspections, tests or nondestructive examinations or who participate in the approval of procedures, the handling of data or test results, or the control of reports and records.
FPL proposes an alternative to capability requirements for those who participate in: (1) the approval of procedures, (2) the handling ofdata or test results and (3) the control of reports and records.
FPL accomplishes this by having personnel determined to be qualified and competent by management though consideration ofeducation, training, and experience.
The Florida Power 8c Light Company position on the scope of ANSI N45.2.6-1978 is that personnel participating in testing who take data or make observations, where special training is not requited to perform this function, need not be qualified in accordance with ANSI N45.2.6 but need only be trained to the extent necessary to perform the assigned function.
For leak testing conducted as part of the preoperational and operational testing programs, FPL considers that the qualification requirements of Regulatory Guide 1.8 (ANSI N18.1-1971) and ANSI N45.2.6-1978, Paragraph 3.0 to be an acceptable alternative to SNT-TC-1A-1975 requirements for leak testing, except for leak testing defined in and performed under Section GI of the ASME Code, where in such cases, the Code shall govern.
For preoperational and operational inspection, examination and testing by Quality Control Inspectors, FPL considers that Position C.1 of Regulatory Guide 1.58, Revision 1 and ANSI N45.2.6-1978, Paragraph 3.0 are acceptable requirements for training and qualification, except for inspections, tests and examinations defined in and performed under Section IIIof the ASME Code, where in such cases, the Code shall govern.
<ng I'I s0 P t
t/q "1t IV
OPICAL QUALITYASSURANCE REPORT APPENDIX C FPL BASELINE DOCUMENT MATRIX Rev.
Date Page of For all other preoperational and operational inspection, examination and testing performed by operating plant and support personnel, FPL considers that training and qualification to the requirement ofANSI N18.1-1971 and Regulatory Guide 1.8 are sufficient for the type and scope of activities performed and that qualifications to ANSI N45.2.6-1978 is unnecessary and redundant.
These preoperational and operational inspection, examination tests shall be supervised or directed by personnel qualified to Position C.l of Regulatory Guide 1.58, Revision 1.
FPL shall comply with Position C.10 of Regulatory Guide 1.58, Revision 1, effective with Revision 4 of the Topical Quality Assurance Report, in that all new certifications issued for personnel shall meet the education and experience requirements or shall document objective evidence demonstrating that the individual indeed does have comparable or equivalent competence to that which would be gained from having the required education and experience.
FPL's position on ANSI N45.2.6-1978, Paragraph 2.3 is that an initial and periodic review (not to exceed two years) ofpersonnel shall determine the capabilities in his qualified area. Ifduring this review or at any other time, it is determined that the individual's capabilities are not in accordance with the specified requirements, that individual shall be removed from that activity until the required capability has been demonstrated.
In addition, during this review a determination shall be made that an individual has been actively inv'olved in the inspection process in his qualified atria.
R I
IN4 211-1 4
FPL's exception to Regulatory Guide position C.2 is as follows:
Design verification shall be performed by technically qualified individual(s) or group(s) other than those who performed the design. The original designers and verifiers may both be fiom the design organization.
Design verification by the designer's immediate supervisor shall be limited to those instances where the supervisor is the only qualified individual available within the design organization.
These instances are further restricted to designs where the designs where the supervisor did not specify a singular design approach, or did not restrict design methods or alternatives, or did not specify design inputs (unless the specified design inputs have already been
I+
IA l gc
OPICAL QUALITYASSURANCE REPORT APPENDIX C I
APL BASELINE DOCUMENT MATRIX Rev.
Date Page of independently verified). Justification for verification by the designer's immediate supervisor should be documented along with the extent of the supervisor's involvement in the design.
ANSI N45.2.11-1974, Paragraph 11.4 requires that "audits shall include an evaluation of design quality assurance policies, practices, procedures and instructions...."
FPL's design quality assurance (and all other QA elements) policies, procedures and instructions are included in FPL's Quality Assurance Program documentation.
The Quality Assurance Department evaluates all of this documentation in reviews performed during its development and revision. Accordingly, FPL does not require subsequent (and redundant) evaluations of these Quality Assurance Program policies, procedures and instructions during audits. FPL audits willinclude evaluations of the adequacy of the practices which are the implementation of these policies, procedures and instructions.
~
R I
Regulatory Guide 1.68 (11f73) entitled "Preoperational and Initial Start-up Test Programs for Water Cooled Power Reactors" is addressed in Section 14.2.1 of the St. Lucie Unit 2 FSAR which states in part, "The start-up test program is developed using the recommendations of Regulatory Guide 1.68". To avoid duplication of requirements, FPL will address Regulatory Guide 1.68 in the FSAR.
R l
i 4
4 21 ANSI N45.2.10 - 1973 identifies terms and their definitions important to the uniform understanding of the intent ofrequired quality assurance practices for the construction ofnuclear power plants.
Regulatory Guide 1.74 (2-74) endorses these terms and definitions and extends them through the operational phase and includes a clarification ofprocurement documents.
e::
FPL has developed a glossary of terms and their definitions as part of the Quality Assurance Manual which is being used throughout its nuclear construction and operating plant activities,
4 0
OPICAL QUALITYASSURANCE REPORT APPENDIX C FPL BASELINE DOCUMENT MATRIX Rev.
Page 12/14/90 13 23 of The followingdefinitions are currently listed in our glossary and are alternatives or clarifications to those listed in the ANSI Standard and Regulatory Guide:
Assembly A combination of subassemblies or components or both, fitted together to form a workable unit.
Audit A documented activity performed in accordance with written procedures or checklists to verify, by examination and evaluation of objective evidence, that applicable elements of the quality assurance program have been developed, documented and effectively implemented in accordance with specified requirements.
An audit does not include surveillance or inspection for the purpose of process control or product acceptance.
Guidelines Particular provisions which are considered good practice but which are not mandatory in programs intended to comply with Standards.
The term "should" denotes a guideline; the term "shall" denotes a
requirement; and the word "may" denotes permission, neither a requirement nor a recommendation.
Inspector (Owner's or Installer's)
A qualified inspector employed by the Owner or Installer, whose duties include the verification of quality related activities on installations.
e.:
Examination, observation, or measurement to determine the conformance of materials,
- supplies, components,
- parts, appurtenances, systems, processes, or structures to predetermined requitements.
II II 3 I
34 I
II
OPICAL QUALITYASSURANCE REPORT APPENDIX C BASELINE DOCUMENT MATRIX Rev.
9 12/14/90 FPL Page 14 23 Procurement Documents Contractually binding documents, including such'documents as contracts, letters of intent, work orders, purchase orders or proposals and their acceptances which authorize the seller to perform services or supply equipment, material, or facilities on behalf of the purchaser.
Qualification (Personnel)
The characteristics or abilities gained through training or experience or both as measured against established requirements such as standards or tests that qualify an individual to perform a required function.
Quality Assurance I
All those planned and systematic actions necessary to provide adequate confidence that a structure, system or component will perform satisfactorily in service. Quality Assurance includes quality control.
Quality Control Those quality assurance actions related to the physical characteristics or material, structure, component or system, which provide a means to control the quality of the material, structure, component or system to predetermined requirements.
Storage That period following the release of an item for shipment until turnover for start-up operational testing. This would include in-place storage.
System An integral part of a nuclear power plant comprised of electrical, electronic, or mechanical components (or combinations thereof) that may be operated as a separate entity to perform a specific function.
<j<
(,f
'(
PICAL QUALITYASSURANCE REPORT APPENDIX C BASELINE DOCUMENT MATRIX Rev.
12 1
FPL Page 15 23 of Testing Performance of those steps necessary to determine that systems or components function in accordance with predetermined specifications.
A mandatory action, denoted by the word shall. (See "Guidelines" )
Requirements are generally based on statutes or regulations, but may be internally generated within the company.
"Shall" is therefore used for both external, legally enforceable actions and internal requirements not enforceable under current NRC practices.
R I
i 1
R v A
I 4
ANSI N45.2.9-1974, Section 3.2.5 requires Quality Assurance records be classified as lifetime or non-permanent and further defines lifetime and non-permanent in Section 2,2 of the Standard.
FPL provides the followingdefinitions as an alternative to the above.
Lifetime Records:
Records which are required by the NRC facilityoperating license, the NRC construction permit, applicable parts of 10CFR, the FSAR, or other NRC commitments to be retained for the lifeofthe plant.
Non-permanent Records:
Records which are required by the NRC facilityoperating license, the NRC construction permit, applicable parts of 10CFR, the FSAR, or other NRC commitments to be retained forperiods oftime less than the lifeofthe plant.
~ i ANSI N45.2.9-1974, requirements for Section 5.6, "Facility",are clarified by FPL as follows:
I 4'g
,4 WI
OPICAL QUALITYASSURANCE REPORT APPENDIX C FPL BASELINE DOCUMENT MATRIX Rev.
Oate 16 23 Page of QA records shall be stored in a manner as to protect contents from possible destruction by causes such as fire, flooding, tornados,
- insects, rodents, and from possible deterioration by a combination ofextreme variations in temperature and humidity conditions.
A QA Record Storage Evaluation Team (QARSEQ shall be responsible fordetermining methods utilized to assure that QA Records are adequately stored and protected.
0 The QARSET shall consist of the following: the Quality Manager - Juno Beach, the Loss Prevention Engineer, and the Manager of Corporate Record Services, who shall be responsible for maintaining records ofevaluations and establishing schedules to assure that reevaluations are performed every two (2) years. Ifnecessary, the above QARSET Committee may delegate appropriate designees to serve as team members.
As part of their responsibility, the QARSET shall evaluate the status ofexisting facilities and the adequacy of additional records facilities prior to the construction of a new facility or the conversion of existing structures.
Preferably, such evaluations should be performed during the design phase.
ANSI N45.2.9-1974 will be utilized in the evaluation of potential record storage facilities.
Section 5.6 "Facilities" is modified as follows and shall be the basis for QARSET approved QA Record Storage Facilities.
1.
A 2-hour vault meeting NFPA No. 232 without additional provisions.
2.
2-hour rated fire resistant file room as defined in NFPA No. 232-1980 ifthe following additional provision are provided:
a.
Early warning fire detection and automatic fire suppression shall be provided, with electronic supervison at a constantly monitored central station.
'\\
1
OPICAL QUALITYASSURANCE REPORT APPENDIX C 0
FPL BASELINE DOCUMENT MATRIX Rev.
Date 17 23 Page of b.
Records shall be stored in fully enclosed metal cabinets.
Records shall not be permitted on open steel shelving. No storage or records shall be permitted on the floorofthe facility. Adequate access and aisle space shall be maintained at all times thmughout the facility.
c.
Work not directly associated with records storage or retrieval shall be prohibited within the storage facility.
d.
Smoking and eating/drinking shall be prohibited throughout the records storage facility.
e.
Ventilation, temperature, and humidity control equipment shall be provided with approved fire dampers where they penetrate fire barriers.
3.
Other conditions from the above may be approved by the QARSET ifin their judgement the 'condition meets the established level ofprotection defined above.
There are two acceptable alternatives to the establishment of an approved QA record storage facility:
1.
The maintenance of duplicate QA Records stored in separate locations which are not subject to the same destructive force at the same time.
2.
The use of QARSET approved factory built record protection equipment, such as insulated record containers, fire-resistive safes, and insulated filingdevices.
Where a specially constructed storage num is maintained to store the only copy ofQA records, at least the followingfeatures should be considered in its construction:
(1)
Reinforced concrete, conctete block, masonry, or equal construction.
C0Z N
g 04
fV'+C IrH 4gI
OPICAL QUALITYASSURANCE REPORT APPENDIX C BASELINE DOCUMENT MATRIK Rev.
9 12/14/90 FPL 18 23 Page of (2)
Concrete floor and roof with sufficient slope for drainage; ifa floor drain is provided, a check valve (or equal) shall be included.
(3)
Structure, doors, frames and hardware should be Re-rated with a recommended two hour minimum rating.
(4)
Sealant applied over walls as a moisture or condensation barrier.
(5)
Surface sealant on floorproviding a hard-wear surface to minimize concrete dusting.
(6)
Foundation sealant and provision for drainage.
(8)
Adequate fire detection and/or suppression system.
(9)
No pipes other than those providing fire protection to the storage facilityare to be located within the facility.
R I
i 1
1 N
4 ANSI N45.2.8-1975, Paragraph 2.3 requires that Measuring and Test Equipment (M&TE)used for inspection be identified on the Inspection Report. FPL may, as an option, employ a M&TE issue log which provides traceability between M&TEand the applicable inspections, ANSI N45.2.8-1975, Paragraph 4.6 addresses care of items to the extent that temporary use of equipment or facilities to which the standard applies that are to become part of the completed project may be desirable.
C0,z Ol CV E
0
wovalA' aalu iC~
R;
~r
PICAL QUALITYASSURANCE REPORT APPENDIX C
@PL BASELINE DOCUMENT MATRIX Rev.
Date Page of The following clarification applies to the above statement.
For FPL plants in the construction phase (to the point ofplant operation license) temporary use ofequipment and facilities may be used according to need and/or situation, In this case, authorization for usage shall be provided along with all the documents, conditions, safeguards and evaluations to verify permanent plant equipment adequacy.
In the operations phase all equipment, including temporary equipment, is subject to identical controls to preclude adverse effects on safety and suitability for use.
4 0
ANSI N45.2.13-1976 Section 1.1 states that the extent to which the individual requirements of this standard willapply willdepend upon the nature and scope of the work to be performed and the required quality of the items or services purchased.
For commercial grade items, FPL has determined that certain aspects ofthe individual requucments ofANSIN45.2.13 need not apply.
Commercial grade items are those (1) not subject to design or specification requirements that are unique to facilities or activities licensed by the NRC, and (2) used in applications other than facilities or activities licensed by the NRC, and (3) to be ordered Rom the manufacturer/supplier on the basis of specifications set forth in the manufacturer's published product description.
These commercial items are subject to varying deyees ofcontrol as indicated in the FPL Quality Assurance Manual.
As a minimum, an evaluation is performed by qualified personnel to assure that the commercial item satisfies the necessary technical and quality requirements and the item is checked upon receipt to assure that the item received was the one ordered, damage was not sustained during shipment, and documentation, ifrequired, was received.
e'.
ANSI N45.2.13-1976 Section 1.3 provides a definition of "procurement document" which is different Rom the definition contained in ANSIN45.2,10-1973 and Regulatory Guide 1.74. The Florida Power 4 Light (FPL) Quality Assurance Program uses the definition of "procurement document" contained in ANSI N45.2. 10-1973 as modified by Regulatory Guide 1.74.
4 PQ 4
-~l t
%.(,
I 44
OPICAL QUALITYASSURANCE REPORT APPENDIX C BASELINE DOCUMENT MATRIX Rev.
12/14/90 APL 20 23 Page of ANSI N45.2.13-1976 Section 3.3.a requires that procurement documents be reviewed prior to release for bid and contract award. The FPL Quality Assurance Program requires procurement document reviews prior to bid and contract award for all safety related purchases with the exception of these accomplished by "Confirming Purchase Order". A "Confirming Purchase Order" is an order which is initiallyplaced verbally with the supplier and then later confirmed with a written Purchase Order. A "Confirming Purchase Order" is only used when time restraints would prohibit the normal review and approval cycle. The followingcontrols are provided in the FPL Quality Assurance Manual to assure that the intent of ANSI N45.2.13 is satisfied for "Confirming Purchase Orders",
0 (1)
Quality Assurance must be contacted prior to contacting the supplier to place the order unless it is an emergency purchase after normal working hours in which case Quality Assurance is contacted the next working day.
(2)
Prior to verbally placing the order, it must be verified that the intended supplier is on the FPL Quality Assurance Approved Supplier List.
(3)
The verbally placed order must be promptly followed-up (confirmed) with a written procurement document which is subject to all reviews and approvals required for safety related purchases.
Section 8.2 ofANSIN45.2.13 identifies those nonconformances which shall be submitted to the Purchaser.
Florida Power 4 Light's (FPL) position regarding the nonconformances to be reported is as follows.
Suppliers (including A/E's and Contractors) shall submit all nonconformances which consist ofone or more of the following:
1)
Technical or material mquimments are violated.
2)
Requirement in supplier documents which have been approved by the Puirhaser is violated.
~
Ik'4 I 1
I
+tJ~'k i
eA'
PICAL QUALITYASSURANCE REPORT APPENDIX C BASELINE DOCUMENT MATRIX Rev.
12/14/90 FPL Page 21 23 3)
Nonconformances which would affect the quality of the item in regatd to function of safety related features.
In cases where the supplier cannot make this determination, they shall be submitted to the Purchaser for evaluation.
This policy assures that all nonconformances affecting safety related functions willbe reviewed and approved by FPL.
In all cases, the supplier's documentation on nonconformances is available for FPL's review.
1 44 v
4 2-Regulatory Guide 1.144, Positions C.3 aAb, states in part that applicable elements of an organization's Quality Assurance Program should be audited at least annually or at least once within the lifeofthe activity, whichever is shorter.
ANSI N18.7-1976/ANS-3.2, Paragraph 4.5 (endorsed by Regulatory Guide 1.33 Revision 2) states in part; "Audits ofselected aspects ofoperational phase activities shall be performed with a frequency commensurate with their safety significance, and in such a manner as to assure that an audit of safety related functions is completed within a period oftwo years."
FPL has chosen a two year cycle for auditing elements of the internal and on-site QA Program during the operation phase ofplant life followinginitial fuel loading. FPL's position is that the two year cycle: (1) allows more in-depth and meaningful audits in each regularly scheduled area,
,iso
~lIl te
PICAL QUALITYASSURANCE REPORT APPENDIX C CPL BASELINE DOCUMENT MATRIX Rev.
Date Page of (2) permits more audits of ongoing activities, and (3) in conjunction with the planning and scheduling requirement of TQR 18.0 provides for a comprehensive audit program.
The audit frequency requirements ofRegulatory Guide 1.144 willbe followed during other plants'hases.
In the case of suppliers, an annual evaluation ofquality performance history shall be performed to determine reaudit requirements.
Reaudit requirements for suppliers shall be based on the quality performance, and the complexity and criticalityof the equipment or service being procured.
ANSI N45.2.12, Paragraph 4.3.1 states:
"Abrief pre-audit conference shall be conducted at the audit site with cognizant organization management.
The purpose of the conference shall be to confirm the audit scope, present the audit plan, introduce auditors, meet counterparts, discuss audit sequence and plans for the postaudit conference, and establish channels ofcommunication."
FPL willnot require the pre-audit conference for audits of limited scope and of specific site activities conducted by the Construction and Operations Groups.
This conference is omitted because the day-to-day contact of the auditors and plant management, the awareness on the part of plant management that these audits are conducted without pre-audit conferences, and the limited scope of the audits meet the intent of a pre-audit conference.
ANSI Standard N45.2.12-1977, Paragraph 4.5.1 states in part "The audited organization shall provide a follow-up report stating the corrective action taken and the date corrective action was completed". The FPL QA Program requires the QA Department to followup on all action taken by the audited department.
This is documented on the corrective action followup form by the QA Department and closed by the QA
~ i Department instead of the audited department.
This assures that all actions taken by the audited department are verified by the QA Department and that the QA Department concurs with the resolution. We feel that itis appropriate for this to be documented by the QA Department instead ofthe audited department.
L F
'H l c
PICAL QUALITYASSURANCE REPORT APPENDIX C
@PL BASELINE DOCUMENT MATRIX Rev.
Date 23 23 Page of n'n ANSI N45.2.4-1972, Paragraph 2.1; ANSI N45.2.6-1973, Paragraph 2.1; ANSI N45.2.13-1976, Paragraph 7.2; ANSI N18.7-1976/ANS 3-2, Paragraph 5.2.7.1; ANSI N45.2.8-1975, Paragraph 2.1 and Paragraph 2.2 include plans and/or planning as required.
The terms plan and/or planning are included in FPL's activities as indicated in the following clarification:
Planning is considered to be a management pmcess or analytical tool used as an aid to help
~ develop identification and/or development of program requirements, implementation activities, assignments and staffing, inspections, surveillances and audits, controls and other activities to assure completeness of the requirements.
Planning, as such, is not always documented nor addressed as an end item and is considered to be an integral "process" within the developed item.
Plans which are considered to be end type or output type documents have the term "plan" in the title, such as ISI Master Plan, AuditPlan, Start-up Plan, and others, which as such will reflect directly the requitement of these standards in the appropriate documents.
Plans which are not considered to be end type or output type documents do not have the word plan in the title. However, certain procedures, instructions, flow charts, schedules and checklists may be considered to be plans reflecting planned actions which especially require step-by-step accomplishments.
In these cases, the term plan may not appear in the title but considered to be.a plan only in the indirect sense and identified as a procedure or other document.
FPL considers the above practice to be in compliance with the "plan" requirements ofthese standards.