Forwards Insp Repts 50-250/91-05 & 50-251/91-05 on 910112- 0201 & Notice of Violation
ML17348A897
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/28/1991
From: Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17348A898 List:
References
NUDOCS 9103120071
Download: ML17348A897 (4)


See also: IR 05000250/1991005

Text

FEB.2

8

1SS1

Docket Nos. 50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power and Light Company

ATTN:

Mr. J.

H. Goldberg

President-Nuclear

Division

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION

REPORT

NOS. 50-250/91-05

and 50-251/91-05)

This refers

to the inspection

conducted

by R.

C.

Butcher of this office on

January

12 through

February

1,

1991.

The inspection

included

a, review of

activities authorized for your Turkey Point facility.

At the conclusion of the

inspection,

the findings

were

discussed

with those

members

of your staff

identified in the enclosed

report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Based

on the results of this inspection,

certain of your activities appeared

to

be in violation of

NRC requirements,

as specified

in the enclosed

Notice of

Violation (Notice).'e

are

concerned

about

the violation because

of the

importance of ensuring

that design

changes

are

being adequately

reflected in

plant procedures

and because

of the

need for attention to detail.

You are required to respond to this letter

and should follow the instructions

specified

in the

enclosed

Notice

when

preparing

your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed

corrective

actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the. NRC's

"Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter

and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork. Reduction Act of 1980,

Pub.

L. No. 96.511.

9i03i20071

910228

PDR

ADOCK 05000250

Q

PDR

~r-c

Florida Power

and Light Company

FEB 2 8

iS9)

Should you have

any questions

concerning this letter,

please

contact us.

Sincerely,

ORlglNAL SlGNFO ~v

A'4RYfN V gr,<<,

Marvin V. Sinkule, Chief

Reactor Projects

Branch

2

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

cc w/encls:

K. N. Harris, Senior Vice President

Nuclear Operations

P. 0.

Box 14000

Juno

Beach,

FL

33408

T.

F. Plunkett,

Vice President

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL 33102

L.

W. Pearce,

Plant Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami, FL

33102

L.

W. Bladow, guality Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

D. Powell, Superintendent,

Plant Licensing

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami, FL

33102

Harold F. Reis,

Esq.

Newman

and Holtzinger, P.C.

1615

L Street,

NW

Washington,

D.

C.

20036

cc w/encls cont'd:

(See

page

3)

Florida Power

and Light Company

3

FEB 2 8

TSQ1-

cc w/encls cont'd:

John T. Butler, Esq.

Steel,

Hector and Davis

4000 Southeast

Financial

Center

Miami,

FL

33131-2398

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee,

FL

32304

Jacob

Daniel

Nash

Office of Radiation Control

Department" of Health

and

Rehabilitative .Services

1317 Winewood Boulevard

Tallahassee,

FL.

32399-0700

Jack Shreve

Office of the Public Counsel

Room 4, Holland Building

Tallahassee,

FL

32304

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

Twin Towers

2600 Blair Stone

Road

Tallahassee,

FL

32301

Joaquin Avino

County Manager of Metropolitan

Dade County

ill NW 1st Street,

29th Floor

Miami, FL

33128

Intergovernmental

Coordination

and Review

Office of Planning

and Budget

Executive Office of the Governor

The Capitol Building

Tallahassee,

FL

32301

State of Florida

bcc w/encls:

(See

page

4)

l

Florida Power

and Light Company"

4

FEB "S

'991

bcc w/encls:

jender Auluck,

NRR

Document Control

Desk

R'. Crlenjak, RII

Ross Butcher,

Sr. Resident

Inspector

U.S. Nuclear Regulatory

Commissi.on

P. 0.

Box 1448

'omestead,

FL

33090

RI 'gP

5

p

R

Qn

02~/91

R:

R

R rl njak

02

91