ML17348A519

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/90-25 & 50-251/90-25 on 900630- 0803.Violation Noted But Not Cited
ML17348A519
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/17/1990
From: Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17348A520 List:
References
NUDOCS 9009040195
Download: ML17348A519 (6)


See also: IR 05000250/1990025

Text

gag

1 7

lgg0

Docket Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power

and Light Company

ATTN:

Mr. J.

H. Goldberg

President

Nuclear Division

P.

0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NOS. 50-250/90-25

AND 50-251/90-25

This refers

to

the Nuclear

Regulatory

Commission

(NRC) inspection

conducted

by

R.

C. Butcher

on

June

30,

1990

through

August 3,

1990.

The

inspection

included

a review of activities authorized

for your Turkey Point facility.

At the 'onclusion

of the inspection,

the findings

were discussed

with those

members of your staff identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are

identified in the report.

'h)ithin

these

areas,

the inspection

consisted

of selected

examinations

of procedures

and

representative

records,

inte'rviews with personnel,

and

observation

of

activities in'progress.

The enclosed

Inspection

Report identifies activities that appeared

to violate

NRC requirements

but are not cited; therefore,

no response

is required.

In

accordance

with Section

2.790 of the

NRC's "Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed

in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Original signed

by

P.

E. Fredrickson (for)

Marvin V. Sinkule, Chief

Reactor Projects

Branch

2

Division of Reactor Projects

Enclosure:

NRC Inspection

Report

cc w/encl:

(See

pag'e

2)

Florida Power

and Light Company

AUG

1 7

1993

cc w/encl:

K. N. Harris, Sr. Vice President

Nuclear Operations

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

L.

W. Pearce,

Plant Manager

Turkey Point Nuclear Plant

P.

0.

Box 029100

Miami,

FL

33102

L.

W. Bladow

Qual ity Manager

Turkey'oint Nuclear Plant

P.

O.

Box 029100

Miami,

FL

33102

D. Powell, Superintendent-

Plant Licensing

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

Harold

F. Reis,

Esq.

Newman

and Holtzinger,

P.C.

1615

L Street,

NW

Washington,

D.

C.

20036

John

T. Butler,

Esq.

Steel,

Hector and Davis

4000 Southeast

Financial

Center

Miami,

FL

33131-2398

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee,

FL

332304

Jacob

Daniel

Nash

Office of Radiation Control

Department of Health and

Rehabilitative Services

1317 Winewood Boulevard

Tallahssee,

FL

32399-0700

Jack

Shreve

Office of the Public Counsel

Room 4, Holland Building

Tallahassee,

FL

32304

(cc w/encl cont'd - see

page

3)

AUG

1 7

1990

(cc w/encl cont'd)

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

Twin Towers

2600 Blair Stone

Road

Tallahassee,

FL

32301

Joaquin

Avino

County Manager of Metropolitan

Dade County

111 Nh'st Street,

29th Floor

Miami,

FL

33128

Intergover nmenta

1 Coordi nati on

and Review

Office of Planning

and Budget

Executive Office of the Governor

The Capitol Building

Tallahas'see,

FL

32301

State of Florida

bcc w/encl:

G.

E. Edison,

NRR

Document Control

Desk

Ross Butcher,

Sr.

Resident

Inspector

U.S. Nuclear Regulatory

Commission

P.

O.

Box 1448

Homestead,

FL

33090

RI

'DRP

RS bin

08/i i/90

R:

P,

RCrl enjak

08/i

/90